Home |
Search |
Today's Posts |
![]() |
|
Metalworking (rec.crafts.metalworking) Discuss various aspects of working with metal, such as machining, welding, metal joining, screwing, casting, hardening/tempering, blacksmithing/forging, spinning and hammer work, sheet metal work. |
|
LinkBack | Thread Tools | Display Modes |
#21
![]()
Posted to rec.crafts.metalworking
|
|||
|
|||
![]()
On Thu, 25 Nov 2010 11:56:53 -0500, Phred
scribed: On Wed, 24 Nov 2010 15:58:03 -0500, Phred scribed: Hey all: I was asked to dispose of a Jet/Max BP style machine, exact clone of the Bridgeport mill, including DRO, cutters and other tooling... I figured I'd grab it for myself and rework it in my spare time. Actually it only has about 100 hours on it, I trammed the ways and are all well and good. So good deal for free. 1st question is how to transport it to my house... Can a flatbed tilt wrecker handle this? I figure if it can winch a SUV up, it can handle a 1 ton machine as long as it is secured well? It's only going 12 miles. What type of floor does this need? I have a 20x20 shed that I would like to put it in, but it's raised on cinder blocks (so she dinna rot). Can I use lolly's just under the floor where the machine is, or should I move the shed, pour a floor, and drop said shed back on it's new foundation? Also, I need to run 240 for the 3 phase... I have it in the house for the W/D, but having never run power outside, what should I look for... Buried line? Can I also run lighting for the shed off the same panel? This was a Garden Shed, but I think it will do better as a shop now that I have a machine. My basement is too low and confined, plus I really dinna want the smell of coolant and swarf wafting into the living room. Guess that's it. Thanks' gang... Have a Great Holiday! Fred Fowler III WOW! So many great ideas! I'm gonna put this on hold fer a day...I dinna ken about the power, the VF modulator sounds right, I reckon I can juice this from that 100A panel... Buried of course... I may get a nice old SB lathe too in this deal. Needs some work, but I'll have it cutting in no time... Also have a friend that owns a wrecker with one of the hoist that can take a SUV out a tight parking spot. He Also does Repo work. I figure that for 100B/H Plus a 12 pack of the Sam Adams... Good to go. I will get it moved. Palletted nicely Great help guys! |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Photoessay on moving a Bridgeport uploaded to the dropbox | Metalworking | |||
Moving a bridgeport | Metalworking | |||
Moving a Bridgeport mill | Metalworking | |||
Moving my Bridgeport | Metalworking | |||
moving bridgeport over soft ground | Metalworking |