Metalworking (rec.crafts.metalworking) Discuss various aspects of working with metal, such as machining, welding, metal joining, screwing, casting, hardening/tempering, blacksmithing/forging, spinning and hammer work, sheet metal work.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Bob Thomasson
 
Posts: n/a
Default New Shop Building

Well, after thinking about it for more than a decade I broke ground
this week on my new shop. I took so long because I wanted to wait
until lumber and steel prices were at their peak...arrgh.

Here's what I learned so far. I didn't spend near enough time
figuring out exactly what it would cost and of course nearly all of my
estimates are low. I wanted to go with concrete block (CMU) walls
partly because we live in a high fire hazard area. I knew it would be
expensive, but got some low estimates that re-assured me. After the
plans were drawn up and the permit issued and I got some firm bids,
the low estimates got pretty darn high. The building permit alone was
over $900. It's gotten so civilized around here that the chances of
getting away with a non-permitted structure were pretty slim.

Also totally underestimated the amount and cost of the base material
that needs to be compacted prior to the concrete pour. I'm planning
to pour a 5 inch deep floor with 5 sack mix and fiber additive. I'm
not sure of the benefit of going any more than 5 inches, but may
decide to go to six. I don't know exactly how I'll have machines
located, so I can't realistically make the floor thicker underneath
them.

Another issue is whether to use all licensed contractors. My neighbor
is a licensed contractor and he suggested that he himself would never
hire a licensed contractor since so much of the money goes to
insurance payments and very little goes toward a quality job. In his
view an unlicensed contractor will do a better job for less. The
downside of course is the risk of someone getting hurt while working
on my property. I guess I could agree with them in advance that
anyone getting hurt gets dragged out back, shot and buried :-).

Bob
  #2   Report Post  
PJ
 
Posts: n/a
Default New Shop Building


"Bob Thomasson" wrote in message
m...
Well, after thinking about it for more than a decade I broke ground
this week on my new shop. I took so long because I wanted to wait
until lumber and steel prices were at their peak...arrgh.

Here's what I learned so far. I didn't spend near enough time
figuring out exactly what it would cost and of course nearly all of my
estimates are low. I wanted to go with concrete block (CMU) walls
partly because we live in a high fire hazard area. I knew it would be
expensive, but got some low estimates that re-assured me. After the
plans were drawn up and the permit issued and I got some firm bids,
the low estimates got pretty darn high. The building permit alone was
over $900. It's gotten so civilized around here that the chances of
getting away with a non-permitted structure were pretty slim.

Also totally underestimated the amount and cost of the base material
that needs to be compacted prior to the concrete pour. I'm planning
to pour a 5 inch deep floor with 5 sack mix and fiber additive. I'm
not sure of the benefit of going any more than 5 inches, but may
decide to go to six. I don't know exactly how I'll have machines
located, so I can't realistically make the floor thicker underneath
them.

Another issue is whether to use all licensed contractors. My neighbor
is a licensed contractor and he suggested that he himself would never
hire a licensed contractor since so much of the money goes to
insurance payments and very little goes toward a quality job. In his
view an unlicensed contractor will do a better job for less. The
downside of course is the risk of someone getting hurt while working
on my property. I guess I could agree with them in advance that
anyone getting hurt gets dragged out back, shot and buried :-).

Bob


Put lots of rebar in the floor. I used the fiber, and don't think it did
anything except lighten my wallet. It certainly didn't stop cracking...Paul


  #3   Report Post  
Ecnerwal
 
Posts: n/a
Default New Shop Building

"PJ" wrote:

Put lots of rebar in the floor. I used the fiber, and don't think it did
anything except lighten my wallet. It certainly didn't stop cracking...Paul


Neither will rebar, if you don't also cut some control joints (unless
very small, any slab will crack - you simply want to tell it where it's
OK with you that it should crack). I have both rebar and fiber in my
slab, and there are cracks running out from the ends of the control
joints (where the saw couldn't cut right up to the wall). No cracks on
the face of the slab (so far anyway), so I assume that the contol joints
have done what they are supposed to do.

--
Cats, Coffee, Chocolate...vices to live by
  #4   Report Post  
Karl Townsend
 
Posts: n/a
Default New Shop Building

You didn't say what part of the country you're in. If you're north of the
Mason Dixon line, put hydronic heat tubing in the floor, even if you don't
plan to use it now. Installing just the tubing is very inexpensive and
leaves open your option for the best heating system their is. Unless you put
insulation under the floor, this would only be a supplemental heat.


Karl




"Bob Thomasson" wrote in message
m...
Well, after thinking about it for more than a decade I broke ground
this week on my new shop. I took so long because I wanted to wait
until lumber and steel prices were at their peak...arrgh.

Here's what I learned so far. I didn't spend near enough time
figuring out exactly what it would cost and of course nearly all of my
estimates are low. I wanted to go with concrete block (CMU) walls
partly because we live in a high fire hazard area. I knew it would be
expensive, but got some low estimates that re-assured me. After the
plans were drawn up and the permit issued and I got some firm bids,
the low estimates got pretty darn high. The building permit alone was
over $900. It's gotten so civilized around here that the chances of
getting away with a non-permitted structure were pretty slim.

Also totally underestimated the amount and cost of the base material
that needs to be compacted prior to the concrete pour. I'm planning
to pour a 5 inch deep floor with 5 sack mix and fiber additive. I'm
not sure of the benefit of going any more than 5 inches, but may
decide to go to six. I don't know exactly how I'll have machines
located, so I can't realistically make the floor thicker underneath
them.

Another issue is whether to use all licensed contractors. My neighbor
is a licensed contractor and he suggested that he himself would never
hire a licensed contractor since so much of the money goes to
insurance payments and very little goes toward a quality job. In his
view an unlicensed contractor will do a better job for less. The
downside of course is the risk of someone getting hurt while working
on my property. I guess I could agree with them in advance that
anyone getting hurt gets dragged out back, shot and buried :-).

Bob



  #5   Report Post  
Bob Thomasson
 
Posts: n/a
Default New Shop Building

The plans call for control joints every 12 feet but the concrete guy
suggested going to joints every 10 feet. They are going to be sawcut
to a depth of about three inches. The slab and footing will be poured
in one flat monolithic pour. The concrete guy also suggested using
wire mesh reinforcing in the floor in addition to the fiber additive.

The most important part seems to be to get a good compacted base that
won't settle or expand with moisture to place the concrete on.

Thanks for your comments.

Bob


  #6   Report Post  
Roy J
 
Posts: n/a
Default New Shop Building

The base material thickness, prep, and compostition are CRITICAL
to a good slab. It will depend a lot on your soil and frost
condtions but the amount you need will scare you. My clay soil
and 4' of frost needs 12" for a small slab and 24" for a larger
one. And it needs to be compacted down in layers using a vibrator
packer.

Be sure they use a 4mil (or more) plastic sheet under the
concrete to help control the moisture migration.

Bob Thomasson wrote:
The plans call for control joints every 12 feet but the concrete guy
suggested going to joints every 10 feet. They are going to be sawcut
to a depth of about three inches. The slab and footing will be poured
in one flat monolithic pour. The concrete guy also suggested using
wire mesh reinforcing in the floor in addition to the fiber additive.

The most important part seems to be to get a good compacted base that
won't settle or expand with moisture to place the concrete on.

Thanks for your comments.

Bob

  #7   Report Post  
Bob Thomasson
 
Posts: n/a
Default New Shop Building

Karl,

...put hydronic heat tubing in the floor, even if you don't
plan to use it now.

Thanks! We're in Northern NV at 6,000 ft and it does get cold. I'd
considered doing just what you suggest, but forgot about it in all the
excitement of watching my bank account dwindle. I still have two
solid weeks prior to the pour to get the tubing in place.

Bob



"Karl Townsend" wrote in message nk.net...
You didn't say what part of the country you're in. If you're north of the
Mason Dixon line, put hydronic heat tubing in the floor, even if you don't
plan to use it now. Installing just the tubing is very inexpensive and
leaves open your option for the best heating system their is. Unless you put
insulation under the floor, this would only be a supplemental heat.


Karl




"Bob Thomasson" wrote in message
m...
Well, after thinking about it for more than a decade I broke ground
this week on my new shop. I took so long because I wanted to wait
until lumber and steel prices were at their peak...arrgh.

Here's what I learned so far. I didn't spend near enough time
figuring out exactly what it would cost and of course nearly all of my
estimates are low. I wanted to go with concrete block (CMU) walls
partly because we live in a high fire hazard area. I knew it would be
expensive, but got some low estimates that re-assured me. After the
plans were drawn up and the permit issued and I got some firm bids,
the low estimates got pretty darn high. The building permit alone was
over $900. It's gotten so civilized around here that the chances of
getting away with a non-permitted structure were pretty slim.

Also totally underestimated the amount and cost of the base material
that needs to be compacted prior to the concrete pour. I'm planning
to pour a 5 inch deep floor with 5 sack mix and fiber additive. I'm
not sure of the benefit of going any more than 5 inches, but may
decide to go to six. I don't know exactly how I'll have machines
located, so I can't realistically make the floor thicker underneath
them.

Another issue is whether to use all licensed contractors. My neighbor
is a licensed contractor and he suggested that he himself would never
hire a licensed contractor since so much of the money goes to
insurance payments and very little goes toward a quality job. In his
view an unlicensed contractor will do a better job for less. The
downside of course is the risk of someone getting hurt while working
on my property. I guess I could agree with them in advance that
anyone getting hurt gets dragged out back, shot and buried :-).

Bob

  #8   Report Post  
jran
 
Posts: n/a
Default New Shop Building

while your at it put down some insulation around the outside edges

"Karl Townsend" wrote in message
k.net...
You didn't say what part of the country you're in. If you're north of the
Mason Dixon line, put hydronic heat tubing in the floor, even if you don't
plan to use it now. Installing just the tubing is very inexpensive and
leaves open your option for the best heating system their is. Unless you

put
insulation under the floor, this would only be a supplemental heat.


Karl




"Bob Thomasson" wrote in message
m...
Well, after thinking about it for more than a decade I broke ground
this week on my new shop. I took so long because I wanted to wait
until lumber and steel prices were at their peak...arrgh.

Here's what I learned so far. I didn't spend near enough time
figuring out exactly what it would cost and of course nearly all of my
estimates are low. I wanted to go with concrete block (CMU) walls
partly because we live in a high fire hazard area. I knew it would be
expensive, but got some low estimates that re-assured me. After the
plans were drawn up and the permit issued and I got some firm bids,
the low estimates got pretty darn high. The building permit alone was
over $900. It's gotten so civilized around here that the chances of
getting away with a non-permitted structure were pretty slim.

Also totally underestimated the amount and cost of the base material
that needs to be compacted prior to the concrete pour. I'm planning
to pour a 5 inch deep floor with 5 sack mix and fiber additive. I'm
not sure of the benefit of going any more than 5 inches, but may
decide to go to six. I don't know exactly how I'll have machines
located, so I can't realistically make the floor thicker underneath
them.

Another issue is whether to use all licensed contractors. My neighbor
is a licensed contractor and he suggested that he himself would never
hire a licensed contractor since so much of the money goes to
insurance payments and very little goes toward a quality job. In his
view an unlicensed contractor will do a better job for less. The
downside of course is the risk of someone getting hurt while working
on my property. I guess I could agree with them in advance that
anyone getting hurt gets dragged out back, shot and buried :-).

Bob





  #9   Report Post  
Harold & Susan Vordos
 
Posts: n/a
Default New Shop Building


"Ecnerwal" wrote in message
...
"PJ" wrote:

Put lots of rebar in the floor. I used the fiber, and don't think it did
anything except lighten my wallet. It certainly didn't stop

cracking...Paul

Neither will rebar, if you don't also cut some control joints (unless
very small, any slab will crack - you simply want to tell it where it's
OK with you that it should crack). I have both rebar and fiber in my
slab, and there are cracks running out from the ends of the control
joints (where the saw couldn't cut right up to the wall). No cracks on
the face of the slab (so far anyway), so I assume that the contol joints
have done what they are supposed to do.

--
Cats, Coffee, Chocolate...vices to live by


The beauty of rebar is even if you get cracking (and you will), it prevents
the slab from shifting. My shop floor is a full 6-1/4" thick, 6 sack mix,
with rebar on 12" centers two ways. Instead of cutting the floor, the guy
that finished it used a bull float and scored lines approximately 12' apart,
then finished over the score lines. That provides a weaker zone for the
crete to crack where you want it to. It works, and you don't get a big
line that fills up with crud like you get from saw cutting. I have
cracking, but only where he had scored and finished, so it's very narrow,
and there has been absolutely NO shifting of the crete. The floor is now 5
years old. I highly recommend rebar, although it does take a lot of time
and money to install it. If you do it yourself, it's not all that bad.
In my opinion, it's worth it. Cheap insurance when you consider the cost of
the job overall. I fully agree with a properly prepared base, too. Ours
was compacted well as the fill was installed, then it sat through a full
season of winter rain in Western Washington. We used rock for fill, 3/8"-
with fines. Worked out great.

Harold


  #10   Report Post  
Harold & Susan Vordos
 
Posts: n/a
Default New Shop Building


"Karl Townsend" wrote in message
k.net...
You didn't say what part of the country you're in. If you're north of the
Mason Dixon line, put hydronic heat tubing in the floor, even if you don't
plan to use it now. Installing just the tubing is very inexpensive and
leaves open your option for the best heating system their is. Unless you

put
insulation under the floor, this would only be a supplemental heat.


Karl


My shop has just such a heating system. I fully agree. Not only is it
comfortable, but the overall environment is much dryer, thanks to the heated
concrete. The typical shop floor can have 3/8" diameter tubing in 200'
runs on 18" centers and do a great job. I used the rebar I mentioned in
my other post (above) to tie the tubing in place. In my case, the tubing
wasn't cheap, though. Heatway, which is now Watts Heatway, uses a rubber
tubing (hose) instead of plastic. They have it made especially for
heating. It's three ply, with one of the layers an oxygen barrier. It's
important that closed hydronic heating systems do not absorb oxygen. The
system has been running for 4 years now and has worked flawlessly once I got
it balanced.

Harold




  #11   Report Post  
Harold & Susan Vordos
 
Posts: n/a
Default New Shop Building


"jran" wrote in message
news:Ua1hc.20901$hw5.34484@attbi_s53...
while your at it put down some insulation around the outside edges


Not just the outside edges. Code calls for an R10 under the slab when you
heat hydronically in slab. It may cost a little to install the insulation,
but it will pay for itself in short order, especially with energy prices
headed higher and higher. If you plan to run a fork lift in the shop, or
install some very heavy machinery, the insulation comes in grades, up to 100
PSI. The typical stuff you see at the lumber yard is usually either 15 or
25 PSI. I used 40 for my shop, which appears to be more than adequate. I
have a fork lift that weighs just under 10,000 lbs, and it can pick three
tons. I've hauled one piece inside that taxed the capacity and got no
cracking or settling. I did do one thing to help prevent edge cracking,
though. I have rebar on 6" centers in the door ways, in a couple feet or
so, where you might get edge cracking. A few bucks spent before the crete
is poured can save a lot of heartache later.

Harold



  #12   Report Post  
Ecnerwal
 
Posts: n/a
Default New Shop Building

In article ,
"Harold & Susan Vordos" wrote:

Instead of cutting the floor, the guy
that finished it used a bull float and scored lines approximately 12' apart,
then finished over the score lines. That provides a weaker zone for the
crete to crack where you want it to. It works, and you don't get a big
line that fills up with crud like you get from saw cutting.


After vacuuming up the dust from my sawcuts, and squeezing in 2-1/2
tubes of caulk, I don't have any big lines that fill up with crud,
either. These cuts are only 1/8 inch wide, so it's not like you're going
to drop a wheel in them..

I highly recommend rebar, although it does take a lot of time
and money to install it. If you do it yourself, it's not all that bad.


I certainly thought it was pretty reasonable in the overall cost scheme
of the project, but I did install my own. You simply cannot go back
later and put the stuff in.

I also put extra steel (both bar and mesh) in the at doorways.

--
Cats, Coffee, Chocolate...vices to live by
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Building shop, need opinions. Gunner Metalworking 1 February 10th 04 11:32 AM
If you were building the dream shop GJRepesh Metalworking 72 January 15th 04 04:45 AM
Building an Extension (Preparation Stage) Andrew UK diy 7 December 29th 03 11:48 PM


All times are GMT +1. The time now is 03:41 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"