Hi all,

Further to discussions a few months ago in the group I've followed the
recommendations of the experts and bought the following components to
upgrade my simple CH/HW setup to a fully controlled Honeywell Y plan
system :

- Honeywell wiring centre (not a terminal block)
- V4073 22mm mid-position valve
- L6400C full programmer
- L641 tank stat
- CM67RF wireless room stat

These will be connected to my existing Baxi Solo 3PF pump overrun boiler
and my current pump. The plan is to install all the electrical bits in
the airing cupboard relatively close to the cylinder so that I don't
have to extend the wires.

In advance of actually installing everything, I am installing the
components screwed into a piece of wooden board with the pump/boiler
simulated by a standard 240V lightbulb, so that I can make sure my
understanding of how the components all work together matches reality.
The questions are :

- does anyone know how to wire a CM67 to a Honeywell wiring centre ? I
don't have a schematic for it. The room stat terminals on the wiring
centre are marked E, 1, 2 and 3. The terminals on the room stat itself
are N & L plus A, B and C. I could buzz it out with my meter but I'd
feel more confident hearing from someone who'd already done it

- do I need a bypass valve ? My bathroom radiator has no TRVs fitted, so
I assumed there would always be a route between the flow and return
irrespective of the position of the three-port valve.

  #2   Report Post  
Posted to uk.d-i-y
Geronimo W. Christ Esq
 
Posts: n/a
Default Y-plan wiring questions

Geronimo W. Christ Esq wrote:

- does anyone know how to wire a CM67 to a Honeywell wiring centre ? I
don't have a schematic for it. The room stat terminals on the wiring
centre are marked E, 1, 2 and 3. The terminals on the room stat itself
are N & L plus A, B and C. I could buzz it out with my meter but I'd
feel more confident hearing from someone who'd already done it


The answer to this is, that room stat terminals A and B go between
wiring centre terminals 1 and 3. I was pleased to find that I'd wired it
correctly the first time. The obvious hint was the note in the
instructions to short terminals 1 and 3 if no room stat was present.

Don't forget that if you are using Y Plan and a two-channel programmer
(like the ST6400C) to snip link L1. The instructions on the wiring
centre don't mention this inside the lid. If you don't do this then you
get strange behaviour on the boiler side.

- do I need a bypass valve ? My bathroom radiator has no TRVs fitted, so
I assumed there would always be a route between the flow and return
irrespective of the position of the three-port valve.


Nobody piped up to answer this I guess I can get away without one.

  #3   Report Post  
Posted to uk.d-i-y
Roger Mills \(aka Set Square\)
 
Posts: n/a
Default Y-plan wiring questions

In an earlier contribution to this discussion,
Geronimo W. Christ Esq wrote:


- do I need a bypass valve ? My bathroom radiator has no TRVs
fitted, so I assumed there would always be a route between the flow
and return irrespective of the position of the three-port valve.


Nobody piped up to answer this I guess I can get away without one.


In theory, you shouldn't need it with a Y-Plan system - because there should
always be an available path for the water to take during the pump over-run
period (unlike S-Plan, where all zone valves are closed at this time). The
only proviso is that you need at least one reasonably sized (but not
massive) radiator which *cannot* be turned off - which means that it should
have 2 lockshield valves, and no TRV. There will then still be a path even
if the other rads all have TRVs, and they are all off. It sounds as if your
bathroom rad could meet this condition - but make sure that neither valve
has a handwheel on it!
--
Cheers,
Roger
______
Please reply to newsgroup.
Reply address IS valid, but is disposable in the event of excessive
spam.


  #4   Report Post  
Posted to uk.d-i-y
Geronimo W. Christ Esq
 
Posts: n/a
Default Y-plan wiring questions

Roger Mills (aka Set Square) wrote:

In theory, you shouldn't need it with a Y-Plan system - because there should
always be an available path for the water to take during the pump over-run
period (unlike S-Plan, where all zone valves are closed at this time). The
only proviso is that you need at least one reasonably sized (but not
massive) radiator which *cannot* be turned off - which means that it should
have 2 lockshield valves, and no TRV. There will then still be a path even
if the other rads all have TRVs, and they are all off. It sounds as if your
bathroom rad could meet this condition - but make sure that neither valve
has a handwheel on it!


Thanks for that reply Roger.

The bathroom radiator is relatively small, but I am considering moving
the TRVs from the radiator in my living room into the bathroom - since
that is where the room stat will be and I understand that the system
will not behave correctly if the room stat fights the TRVs. I may as
well have the living room radiator act as the bypass.

I assume that when the three-port valve is set to do hot water only,
that the cylinder coil will suffice as a bypass.

The pump overrun thing is a bit tricker than I thought. I had planned to
follow one of your recommendations and run a five-core cable between the
new wiring centre in the hotpress and the boiler downstairs, but it
turns out that there is not conduit all the way (it goes across a floor
as well as between walls) and tracking walls to install cables is not
something I want to get into. Instead I'm going to re-use the existing
three-core cable, which up until now has supplied mains to the pump, to
carry the SL and PL signals to/from the box, and then provide the boiler
with it's own permanent live from the existing mains connection in
downstairs. I guess that should be easy, just a matter of putting new
sleeves on the wires to ensure that it is clear they are live.
  #5   Report Post  
Posted to uk.d-i-y
Roger Mills \(aka Set Square\)
 
Posts: n/a
Default Y-plan wiring questions

In an earlier contribution to this discussion,
Geronimo W. Christ Esq wrote:


The bathroom radiator is relatively small, but I am considering moving
the TRVs from the radiator in my living room into the bathroom - since
that is where the room stat will be and I understand that the system
will not behave correctly if the room stat fights the TRVs. I may as
well have the living room radiator act as the bypass.

That's fine - but make sure that it can't accidentally be turned off -
preferably by having two lockshield valves on it.

I assume that when the three-port valve is set to do hot water only,
that the cylinder coil will suffice as a bypass.

Yes - as long as any balancing gate valve in the HW circuit isn't turned
down too much. If you can contrive to run the HW heating and CH at
*different* times, you won;t need to do any HW/CH balancing.

The pump overrun thing is a bit tricker than I thought. I had planned
to follow one of your recommendations and run a five-core cable
between the new wiring centre in the hotpress and the boiler
downstairs, but it turns out that there is not conduit all the way
(it goes across a floor as well as between walls) and tracking walls
to install cables is not something I want to get into. Instead I'm
going to re-use the existing three-core cable, which up until now has
supplied mains to the pump, to carry the SL and PL signals to/from
the box, and then provide the boiler with it's own permanent live
from the existing mains connection in downstairs. I guess that should
be easy, just a matter of putting new sleeves on the wires to ensure
that it is clear they are live.


That will work, but it's very bad practice! It is highly recommended to have
the *whole* system powered from a *single* FCU so that anyone working on it
can be *sure* that nothing is live. Powering it from two separate places
will not achieve that - and you may get sued for electrocuting any
unsuspecting BG (or whatever) person who comes to work on it!
--
Cheers,
Roger
______
Please reply to newsgroup.
Reply address IS valid, but is disposable in the event of excessive
spam.




  #6   Report Post  
Posted to uk.d-i-y
Geronimo W. Christ Esq
 
Posts: n/a
Default Y-plan wiring questions

Roger Mills (aka Set Square) wrote:

Yes - as long as any balancing gate valve in the HW circuit isn't turned
down too much. If you can contrive to run the HW heating and CH at
*different* times, you won;t need to do any HW/CH balancing.


The plan is to have the HW running relatively seldom, so I hope to
balance the system such that it discriminates in favour of the HW
whenever both are running, ie such that the gate valve is up a good bit.
I only ever use HW in the morning and briefly in the evening, so it
would seldom be running long enough to make the house cold

The pump overrun thing is a bit tricker than I thought. I had planned
to follow one of your recommendations and run a five-core cable
between the new wiring centre in the hotpress and the boiler
downstairs, but it turns out that there is not conduit all the way
(it goes across a floor as well as between walls) and tracking walls
to install cables is not something I want to get into. Instead I'm
going to re-use the existing three-core cable, which up until now has
supplied mains to the pump, to carry the SL and PL signals to/from
the box, and then provide the boiler with it's own permanent live
from the existing mains connection in downstairs. I guess that should
be easy, just a matter of putting new sleeves on the wires to ensure
that it is clear they are live.


That will work, but it's very bad practice! It is highly recommended to have
the *whole* system powered from a *single* FCU so that anyone working on it
can be *sure* that nothing is live. Powering it from two separate places
will not achieve that - and you may get sued for electrocuting any
unsuspecting BG (or whatever) person who comes to work on it!


I accept your point and the note of caution, but running a five core is
going to be too damn expensive to do, I'll have to take up boards and
remove my present bath to do it.

As a related point, surely a reasonably knowledgable person would use a
phase tester before risking his life on the assumption that things had
been wired the way they appear. I've seen/heard of examples of far, far
more dangerous things around houses than what I'm thinking of doing,
undoubtedly you have too. I bet you'd never stick your finger near mains
wiring without testing it first
  #7   Report Post  
Posted to uk.d-i-y
Roger Mills \(aka Set Square\)
 
Posts: n/a
Default Y-plan wiring questions

In an earlier contribution to this discussion,
Geronimo W. Christ Esq wrote:


I accept your point and the note of caution, but running a five core
is going to be too damn expensive to do, I'll have to take up boards
and remove my present bath to do it.

As a related point, surely a reasonably knowledgable person would use
a phase tester before risking his life on the assumption that things
had been wired the way they appear.


Hopefully - but it's not unreasonable to assume that the system is dead once
you've turned it off at the FCU.

I suggest you fix prominent notices at each supply point making it clear
that *both* switches must be off for the system to be isolated.

It's even worse if the two connection points are not on the same ring -
because you can then turn a ring off at the CU, but it is still live!
--
Cheers,
Roger
______
Please reply to newsgroup.
Reply address IS valid, but is disposable in the event of excessive
spam.


  #8   Report Post  
Posted to uk.d-i-y
Geronimo W. Christ Esq
 
Posts: n/a
Default Y-plan wiring questions

Roger Mills (aka Set Square) wrote:

Hopefully - but it's not unreasonable to assume that the system is dead once
you've turned it off at the FCU.

I suggest you fix prominent notices at each supply point making it clear
that *both* switches must be off for the system to be isolated.


Good advice, and I plan to do just that. No harm in being cautious.

It's even worse if the two connection points are not on the same ring -
because you can then turn a ring off at the CU, but it is still live!


This will indeed be the case unfortunately. The control gear upstairs is
being taken off the circuit where the immersion heater runs; the
boiler's switched live will be on the kitchen ring. At the minute
everything is on the kitchen ring.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
FAQ: Answering questions emailed direct to 'editor' Phil Addison UK diy 21 January 29th 06 10:38 PM
Underground wiring questions... guest987 Home Repair 52 February 2nd 05 01:52 AM
Shed/workshop wiring questions Sloper UK diy 11 December 4th 04 12:35 AM
Garage welder wiring questions Tom Gardner Metalworking 4 September 26th 03 06:51 PM
Garage welder wiring questions Tom Kendrick Metalworking 1 September 26th 03 12:56 AM


All times are GMT +1. The time now is 12:30 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"