Home |
Search |
Today's Posts |
|
Metalworking (rec.crafts.metalworking) Discuss various aspects of working with metal, such as machining, welding, metal joining, screwing, casting, hardening/tempering, blacksmithing/forging, spinning and hammer work, sheet metal work. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to rec.crafts.metalworking
|
|||
|
|||
Is this overkill?
I finally got my wire ran from building to building. Unfortunately, I
think one or two of my joints (conduit to conduit) may not have fully seated when installing them. (PVC) I had trouble when installign the conduit of pulling one piece fully inot the other matting piece in the ditch . It is on and glued but I am not sure each pipe "bottomed out" into the other pipe if that makes sense. Would putting concrete over the joint make it more water/moisture proof or am I worrying for nothing? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
overkill? | Home Repair | |||
Overkill??? | Home Repair | |||
Ever had that satisfied feeling with overkill ? | UK diy | |||
Wiring overkill? | Home Repair | |||
Wiring overkill? | Home Repair |