I'm switching from a 100 to a 200 amp service. I'm going to lay new cable
from the meter, 185 feet, underground, to the entrance of the house. I have
a retired city electrical inspector (I'm out in the county where no
inspections are required) that is going to do the connections and some
inside work. He told me the other day that I needed to use #2 copper cable
unless it was over 200 feet and then would have to go to #3 (or vice
versa -- that's not the question) in schedule 80 EIGHTY!!! pipe. The
question is, why copper instead of aluminum and why in the world he call for
schedule 80??? I have cattle trucks, loaded 18 wheelers, run over schedule
40 all day long and never have a crack. The original wire is not in any pipe
at all.

If left to my own devices I'd just run 185 feet of whatever size cable
required with no pipe. Is this guy doing some overkill here just to be on
the safe side?


--
The doctors have narrowed my condition
down to two ailments. They say I either
have arthritis or rigor mortis.

JC

www.cellphonesforsoldiers.com

  #2   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,563
Default Overkill???

Ask him what he's basing this on. Ask him how he's figuring his wire size as
well

"JC" wrote in message
...
I'm switching from a 100 to a 200 amp service. I'm going to lay new cable
from the meter, 185 feet, underground, to the entrance of the house. I
have a retired city electrical inspector (I'm out in the county where no
inspections are required) that is going to do the connections and some
inside work. He told me the other day that I needed to use #2 copper cable
unless it was over 200 feet and then would have to go to #3 (or vice
versa -- that's not the question) in schedule 80 EIGHTY!!! pipe. The
question is, why copper instead of aluminum and why in the world he call
for schedule 80??? I have cattle trucks, loaded 18 wheelers, run over
schedule 40 all day long and never have a crack. The original wire is not
in any pipe at all.

If left to my own devices I'd just run 185 feet of whatever size cable
required with no pipe. Is this guy doing some overkill here just to be on
the safe side?


--
The doctors have narrowed my condition
down to two ailments. They say I either
have arthritis or rigor mortis.

JC

www.cellphonesforsoldiers.com



  #3   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,934
Default Overkill???


"JC" wrote in message
...
I'm switching from a 100 to a 200 amp service. I'm going to lay new cable
from the meter, 185 feet, underground, to the entrance of the house. I
have a retired city electrical inspector (I'm out in the county where no
inspections are required) that is going to do the connections and some
inside work. He told me the other day that I needed to use #2 copper cable
unless it was over 200 feet and then would have to go to #3 (or vice
versa -- that's not the question) in schedule 80 EIGHTY!!! pipe. The
question is, why copper instead of aluminum and why in the world he call
for schedule 80??? I have cattle trucks, loaded 18 wheelers, run over
schedule 40 all day long and never have a crack. The original wire is not
in any pipe at all.

If left to my own devices I'd just run 185 feet of whatever size cable
required with no pipe. Is this guy doing some overkill here just to be on
the safe side?



Will there be a main circuit breaker protecting this service feeder from the
meter to the house? In NJ one power company requires that the underground
conduit from the pole to the meter be schedule 80. After the meter if there
is fuse or circuit breaker protection you can change to cable or schedule
40. If you are going under a driveway the conduit should be at least 24"
deep.

For a 200 amp service (310.15(B)(6) 2/0 copper or 4/0 aluminum is required.
Considering the distance of your service you will probably be better off
with an oversized copper feed to compensate for voltage drop.

  #4   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 478
Default Overkill???

On Feb 19, 5:22 pm, "Blattus Slafaly £ ¥ ‰ "
wrote:
JC wrote:
I'm switching from a 100 to a 200 amp service. I'm going to lay new
cable from the meter, 185 feet, underground, to the entrance of the
house. I have a retired city electrical inspector (I'm out in the county
where no inspections are required) that is going to do the connections
and some inside work. He told me the other day that I needed to use #2
copper cable unless it was over 200 feet and then would have to go to #3
(or vice versa -- that's not the question) in schedule 80 EIGHTY!!!
pipe. The question is, why copper instead of aluminum and why in the
world he call for schedule 80??? I have cattle trucks, loaded 18
wheelers, run over schedule 40 all day long and never have a crack. The
original wire is not in any pipe at all.


If left to my own devices I'd just run 185 feet of whatever size cable
required with no pipe. Is this guy doing some overkill here just to be
on the safe side?


Here is another handy little chart.http://www.worldchat.com/~sva-sales/...ing_chart.html

--
Blattus Slafaly ? 3 7/8


sounds like overkill to me.
  #5   Report Post  
Posted to alt.home.repair
Pat Pat is offline
external usenet poster
 
Posts: 657
Default Overkill???

On Feb 19, 4:44*pm, "JC" wrote:
I'm switching from a 100 to a 200 amp service. I'm going to lay new cable
from the meter, 185 feet, underground, to the entrance of the house. I have
a retired city electrical inspector (I'm out in the county where no
inspections are required) that is going to do the connections and some
inside work. He told me the other day that I needed to use #2 copper cable
unless it was over 200 feet and then would have to go to #3 (or vice
versa -- that's not the question) in schedule 80 EIGHTY!!! pipe. The
question is, why copper instead of aluminum and why in the world he call for
schedule 80??? I have cattle trucks, loaded 18 wheelers, run over schedule
40 all day long and never have a crack. The original wire is not in any pipe
at all.

If left to my own devices I'd just run 185 feet of whatever size cable
required with no pipe. Is this guy doing some overkill here just to be on
the safe side?

--
The doctors have narrowed my condition
down to two ailments. They say I either
have arthritis or rigor mortis.

JC

www.cellphonesforsoldiers.com


We just put in Schedule 80 for our 600 amp service. Phone went in
schedule 40 (6" for no apparent reason). Cable went down as a cable/
conduit combo wire. Then, under our driveway they required 6" of
concrete on top of the conduit. Personally, I think the concrete was
overkill.

Then they required conduit to within 3" of the transformer on the
pole.


  #6   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 5,823
Default Overkill???


"JC" wrote in message
...
I'm switching from a 100 to a 200 amp service. I'm going to lay new cable
from the meter, 185 feet, underground, to the entrance of the house. I
have a retired city electrical inspector (I'm out in the county where no
inspections are required) that is going to do the connections and some
inside work. He told me the other day that I needed to use #2 copper cable
unless it was over 200 feet and then would have to go to #3 (or vice
versa -- that's not the question) in schedule 80 EIGHTY!!! pipe. The
question is, why copper instead of aluminum and why in the world he call
for schedule 80??? I have cattle trucks, loaded 18 wheelers, run over
schedule 40 all day long and never have a crack. The original wire is not
in any pipe at all.

If left to my own devices I'd just run 185 feet of whatever size cable
required with no pipe. Is this guy doing some overkill here just to be on
the safe side?


Copper that size is probably $2.50 a foot or so

As for the schedule 80, if he is talking steel, he is nuts. If he is
talking pvc, maybe. Code would not allow plain wire unless it is made for
burial.


  #7   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 130
Default Overkill???


"Edwin Pawlowski" wrote in message
t...

"JC" wrote in message
...
I'm switching from a 100 to a 200 amp service. I'm going to lay new cable
from the meter, 185 feet, underground, to the entrance of the house. I
have a retired city electrical inspector (I'm out in the county where no
inspections are required) that is going to do the connections and some
inside work. He told me the other day that I needed to use #2 copper
cable unless it was over 200 feet and then would have to go to #3 (or
vice versa -- that's not the question) in schedule 80 EIGHTY!!! pipe. The
question is, why copper instead of aluminum and why in the world he call
for schedule 80??? I have cattle trucks, loaded 18 wheelers, run over
schedule 40 all day long and never have a crack. The original wire is not
in any pipe at all.

If left to my own devices I'd just run 185 feet of whatever size cable
required with no pipe. Is this guy doing some overkill here just to be on
the safe side?


Copper that size is probably $2.50 a foot or so

As for the schedule 80, if he is talking steel, he is nuts. If he is
talking pvc, maybe. Code would not allow plain wire unless it is made for
burial.


Thanks to all for the responses. I have the 2005 NEC and some parts of it
seem to be typical governmental gobbeldy goop. For instance, on page 70-140,
right hand column #3 it says "Bare or Covered Conductors. Where bare or
covered conductors are used with insulated conductors, their allowable
ampacities shall be limited to those permitted for the adjacent insulated
conductors." Huh? What other type of conductors are there besides "bare" or
"covered"?


--
The doctors have narrowed my condition
down to two ailments. They say I either
have arthritis or rigor mortis.

JC

www.cellphonesforsoldiers.com

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Ever had that satisfied feeling with overkill ? Jethro UK diy 19 June 9th 07 04:09 AM
Wiring overkill? jimbob Home Repair 16 October 3rd 06 09:40 PM
Wiring overkill? mgarvie Home Repair 24 April 2nd 06 12:36 AM


All times are GMT +1. The time now is 01:28 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"