Home |
Search |
Today's Posts |
![]() |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
I'm gonna move a stud over to help accomodate a light fixture that I worked
on this weekend. The way I see it, if I move the stud over 4", then put another stud 4" to the other side of the where the first stud was originally I should have my bases covered. Should I use a stringer between the studs if I do this? I know, moving a stud to work on a light seems like overkill but if I move the light I'd have to rerun the wiring, repair the siding where the fixture hole is, when I could just remove some vaneer paneling in a closet and move a stud 4" then put the paneling back up. Am I just being crazy here? Seems like moving a stud would be simple to do - simpler than repairing cedar siding planks and tearing out a wall to reroute a wiring run. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Studs behind drywall | Home Repair | |||
Iron Studs | UK diy | |||
Using studs of different material | Woodworking | |||
Moving magnet / Moving coil cartridges | Electronics Repair | |||
Moving Companies save when moving | Home Ownership |