Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]()
Posted to uk.d-i-y
|
|||
|
|||
![]()
On 28/04/2020 17:24, Harry Bloomfield wrote:
Assuming two pairs of railway lines join together via points, to become one line on a narrow gauge railway, the line you are on, then a line to the left- you are progressing from the the line on the right, onto the single pair of lines. Points are set for the line on the left, rather than you line. Is is normal to just drive the engine through the wrongly set points? https://www.youtube.com/watch?v=1o8YJsVOH58 at 7:40 expand the comments from the Youtube poster and you'll see an explanation -- Robin reply-to address is (intended to be) valid |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Replacement rails for sliding patio doors | UK diy | |||
Railroad rails | Metalworking | |||
Towel Rails | UK diy | |||
Heated Towel Rails | UK diy | |||
IPE decking- what about rails,baluster,post?? | Woodworking |