Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to uk.d-i-y
|
|||
|
|||
![]()
Had a 150mm concrete base laid for new conservatory 2 weeks ago.
It is, and will be exposed to the elements for a further 3 weeks approx until the glass goes in. How long until I can lay tiles on it.? 3 Months? Say end of January? Any observations? Thanks Don |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
cracked concrete slab has patch in it-slab only 2-3 inches thick | Home Repair | |||
How long before I can get onto a slab of newly laid concrete, this time of year ?? | UK diy | |||
Tiling over a slightly uneven concrete slab | Home Repair | |||
Tiling over crack in slab floor | Home Repair | |||
Concrete over broken concrete slab? | Home Repair |