Default Top-Down Extension - How Long?

I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?

TH

  #2   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 1,066
Default Top-Down Extension - How Long?


"Tyler" wrote in message
oups.com...
I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?


I take it your next posted question will be "how long is a piece of string?"
)

It's a bit of a silly question and begs the silly answer that it will take
longer than you think and the builder will employ as many as it takes. Even
with a good builder you will have to leave it up to him, he won't start when
he says he will and unforseen problems will make it take longer. Never bank
on a finish time is the golden rule. If it's a side extension you will need
planning permission as well as building regs approval which means someone to
draw up the plans and time for the planning process. If you get a crap
builder he might be able to start straight away. Asuuming you find a decent
one through personal recommendation (and depending on the area), you may
have a long lead time. For an extension of that size you could be looking at
a very small outfit of 4-5 people or a larger one of up 8-10 working on it
at one time or another. Some may only attend for a short time as subs (eg
electrician, roofer) and some will attend as required (chippy). If you start
the process now, you may get actual building started before Christmas
(assuming you go the decent builder route).


--
Bob Mannix
(anti-spam is as easy as 1-2-3 - not)


  #3   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 2,488
Default Top-Down Extension - How Long?

In an earlier contribution to this discussion,
Tyler wrote:

I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?

TH


There's no simple answer!

I suggest that you beg, borrow or steal a copy of Laurie Williamson's
excellent book on "Planning, Managing and Completing your Extension" - then
you'll have a much better understanding of the whole process.

You can buy it from Amazon:
http://www.amazon.co.uk/Home-Extensi...155519-0579022

or your local library may well be able to lend you a copy.
--
Cheers,
Roger
______
Email address maintained for newsgroup use only, and not regularly
monitored.. Messages sent to it may not be read for several weeks.
PLEASE REPLY TO NEWSGROUP!


  #4   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 2,488
Default Top-Down Extension - How Long?

In an earlier contribution to this discussion,
Roger Mills wrote:

In an earlier contribution to this discussion,
Tyler wrote:

I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long
could/ should it take to complete? How many people should there be
employed/ working on such a project?

TH


There's no simple answer!

I suggest that you beg, borrow or steal a copy of Laurie Williamson's
excellent book on "Planning, Managing and Completing your Extension"
- then you'll have a much better understanding of the whole process.

You can buy it from Amazon:
http://www.amazon.co.uk/Home-Extensi...155519-0579022

or your local library may well be able to lend you a copy.



P.S. It's usually better to build extensions bottom up! g
--
Cheers,
Roger
______
Email address maintained for newsgroup use only, and not regularly
monitored.. Messages sent to it may not be read for several weeks.
PLEASE REPLY TO NEWSGROUP!


  #5   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 9,560
Default Top-Down Extension - How Long?

On 31 Jul, 10:06, "Roger Mills" wrote:

P.S. It's usually better to build extensions bottom up! g


In the US when houses get rebuilt sometimes the top of the building is
left in place while the rest is removed and rebuilt. This is a way to
avoid new build regs, what they call 'grandfather clause' He must be
Santa's dad.


NT



  #6   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 42
Default Top-Down Extension - How Long?

On 31 Jul, 07:32, Tyler wrote:
I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?

TH


I rebuild a barn, mostly on a part time DIY basis, arround 75m2, 1m
thick walls, with a poor access site, took 3 years (3000-4000 hours)
before we moved in, and another 200 or so in painting and the like.

Its a how long is a bit of string question really.

The right tools make the job so much easier - he says with about 10K
invested in tools (including a bobcat) right now.

Rick

  #7   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 23
Default Top-Down Extension - How Long?

On 31 Jul, 08:32, "Bob Mannix" wrote:
"Tyler" wrote in message

oups.com...

I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?


I take it your next posted question will be "how long is a piece of string?"
)

It's a bit of a silly question and begs the silly answer that it will take
longer than you think and the builder will employ as many as it takes. Even
with a good builder you will have to leave it up to him, he won't start when
he says he will and unforseen problems will make it take longer. Never bank
on a finish time is the golden rule. If it's a side extension you will need
planning permission as well as building regs approval which means someone to
draw up the plans and time for the planning process. If you get a crap
builder he might be able to start straight away. Asuuming you find a decent
one through personal recommendation (and depending on the area), you may
have a long lead time. For an extension of that size you could be looking at
a very small outfit of 4-5 people or a larger one of up 8-10 working on it
at one time or another. Some may only attend for a short time as subs (eg
electrician, roofer) and some will attend as required (chippy). If you start
the process now, you may get actual building started before Christmas
(assuming you go the decent builder route).

--
Bob Mannix
(anti-spam is as easy as 1-2-3 - not)


Thanks, very helpful. I I have a garage next to the house with a 3 ft
wide path so I was just considering attaching to the house but a
couple people think I should get the top/ down extension and I'm
hoping it'll be around 65k though not had a quote yet. Anyway, I'll
definitely look into it!

  #8   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 42
Default Top-Down Extension - How Long?

On 31 Jul, 21:56, Tyler wrote:
On 31 Jul, 08:32, "Bob Mannix" wrote:





"Tyler" wrote in message


roups.com...


I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?


I take it your next posted question will be "how long is a piece of string?"
)


It's a bit of a silly question and begs the silly answer that it will take
longer than you think and the builder will employ as many as it takes. Even
with a good builder you will have to leave it up to him, he won't start when
he says he will and unforseen problems will make it take longer. Never bank
on a finish time is the golden rule. If it's a side extension you will need
planning permission as well as building regs approval which means someone to
draw up the plans and time for the planning process. If you get a crap
builder he might be able to start straight away. Asuuming you find a decent
one through personal recommendation (and depending on the area), you may
have a long lead time. For an extension of that size you could be looking at
a very small outfit of 4-5 people or a larger one of up 8-10 working on it
at one time or another. Some may only attend for a short time as subs (eg
electrician, roofer) and some will attend as required (chippy). If you start
the process now, you may get actual building started before Christmas
(assuming you go the decent builder route).


--
Bob Mannix
(anti-spam is as easy as 1-2-3 - not)


Thanks, very helpful. I I have a garage next to the house with a 3 ft
wide path so I was just considering attaching to the house but a
couple people think I should get the top/ down extension and I'm
hoping it'll be around 65k though not had a quote yet. Anyway, I'll
definitely look into it!- Hide quoted text -

- Show quoted text -


guess it out at arround 1000-1200 per m2 of new floor space, and you
will be in the ball park, unless you go stupid with expensive
finichies and fancy work.

Rick

  #9   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 1,066
Default Top-Down Extension - How Long?


"Rick" wrote in message
ups.com...
On 31 Jul, 21:56, Tyler wrote:
On 31 Jul, 08:32, "Bob Mannix" wrote:





"Tyler" wrote in message


roups.com...


I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long
could/
should it take to complete? How many people should there be employed/
working on such a project?


I take it your next posted question will be "how long is a piece of
string?"
)


It's a bit of a silly question and begs the silly answer that it will
take
longer than you think and the builder will employ as many as it takes.
Even
with a good builder you will have to leave it up to him, he won't start
when
he says he will and unforseen problems will make it take longer. Never
bank
on a finish time is the golden rule. If it's a side extension you will
need
planning permission as well as building regs approval which means
someone to
draw up the plans and time for the planning process. If you get a crap
builder he might be able to start straight away. Asuuming you find a
decent
one through personal recommendation (and depending on the area), you
may
have a long lead time. For an extension of that size you could be
looking at
a very small outfit of 4-5 people or a larger one of up 8-10 working on
it
at one time or another. Some may only attend for a short time as subs
(eg
electrician, roofer) and some will attend as required (chippy). If you
start
the process now, you may get actual building started before Christmas
(assuming you go the decent builder route).


--
Bob Mannix
(anti-spam is as easy as 1-2-3 - not)


Thanks, very helpful. I I have a garage next to the house with a 3 ft
wide path so I was just considering attaching to the house but a
couple people think I should get the top/ down extension and I'm
hoping it'll be around 65k though not had a quote yet. Anyway, I'll
definitely look into it!- Hide quoted text -

- Show quoted text -


guess it out at arround 1000-1200 per m2 of new floor space, and you
will be in the ball park, unless you go stupid with expensive
finichies and fancy work.

3-4 years ago I had an 2 storey (1 dry room upstairs and 1 dry room
downstairs) extension built. Probably 12m2 up and down, making 25m2 in
total.

I had 3 quotes for the identical work for the shell plus electrics and
plumbing (windows extra). £25k, £35k and £45k!

Fortunately, the only one with a personal recommendation was the £25k one
and he did an excellent job. I suppose the windows, wood floor and the DIY
internals were another £10k (5+3+2k).

Add 20% for inflation to get todays prices and I was in Oxfordshire.


--
Bob Mannix
(anti-spam is as easy as 1-2-3 - not)


  #10   Report Post  
Posted to uk.d-i-y
DrC DrC is offline
external usenet poster
 
Posts: 3
Default Top-Down Extension - How Long?

On 31 Jul, 07:32, Tyler wrote:
I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?

TH


Hi

I'm not an expert but our neighbours are having an extension of
roughly the type and dimensions you describe built and I can tell you
that:

a) Some days 3 people turn up, some days 2 people arrive to work on
the project.

b) They started the job in March, are still working on it pretty much
every day, and I reckon there's about a month to go.

Hope this helps,

David



  #11   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 23
Default Top-Down Extension - How Long?

On 1 Aug, 09:16, DrC wrote:
On 31 Jul, 07:32, Tyler wrote:

I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/
should it take to complete? How many people should there be employed/
working on such a project?


TH


Hi

I'm not an expert but our neighbours are having an extension of
roughly the type and dimensions you describe built and I can tell you
that:

a) Some days 3 people turn up, some days 2 people arrive to work on
the project.

b) They started the job in March, are still working on it pretty much
every day, and I reckon there's about a month to go.

Hope this helps,

David



Thanks, yes I'll have to get use to the fact my life will be disrupted
for a few months!

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Long Freeview TV aerial extension cable - use F plugs & satellitecable? John Stumbles UK diy 33 May 13th 07 10:05 PM
Gap between extension kerrylass UK diy 3 January 16th 07 12:13 PM
Extension John UK diy 13 September 29th 06 07:44 PM
extension Jim UK diy 1 January 29th 06 05:44 PM
Shock well - how long is too long? S.L. Home Ownership 1 January 16th 05 10:43 PM


All times are GMT +1. The time now is 02:27 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"