Top-Down Extension - How Long?
I'm considering putting a side extension onto the house (a top and
bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? TH |
#2
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
"Tyler" wrote in message oups.com... I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? I take it your next posted question will be "how long is a piece of string?" ) It's a bit of a silly question and begs the silly answer that it will take longer than you think and the builder will employ as many as it takes. Even with a good builder you will have to leave it up to him, he won't start when he says he will and unforseen problems will make it take longer. Never bank on a finish time is the golden rule. If it's a side extension you will need planning permission as well as building regs approval which means someone to draw up the plans and time for the planning process. If you get a crap builder he might be able to start straight away. Asuuming you find a decent one through personal recommendation (and depending on the area), you may have a long lead time. For an extension of that size you could be looking at a very small outfit of 4-5 people or a larger one of up 8-10 working on it at one time or another. Some may only attend for a short time as subs (eg electrician, roofer) and some will attend as required (chippy). If you start the process now, you may get actual building started before Christmas (assuming you go the decent builder route). -- Bob Mannix (anti-spam is as easy as 1-2-3 - not) |
#3
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
In an earlier contribution to this discussion,
Tyler wrote: I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? TH There's no simple answer! I suggest that you beg, borrow or steal a copy of Laurie Williamson's excellent book on "Planning, Managing and Completing your Extension" - then you'll have a much better understanding of the whole process. You can buy it from Amazon: http://www.amazon.co.uk/Home-Extensi...155519-0579022 or your local library may well be able to lend you a copy. -- Cheers, Roger ______ Email address maintained for newsgroup use only, and not regularly monitored.. Messages sent to it may not be read for several weeks. PLEASE REPLY TO NEWSGROUP! |
#4
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
In an earlier contribution to this discussion,
Roger Mills wrote: In an earlier contribution to this discussion, Tyler wrote: I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? TH There's no simple answer! I suggest that you beg, borrow or steal a copy of Laurie Williamson's excellent book on "Planning, Managing and Completing your Extension" - then you'll have a much better understanding of the whole process. You can buy it from Amazon: http://www.amazon.co.uk/Home-Extensi...155519-0579022 or your local library may well be able to lend you a copy. P.S. It's usually better to build extensions bottom up! g -- Cheers, Roger ______ Email address maintained for newsgroup use only, and not regularly monitored.. Messages sent to it may not be read for several weeks. PLEASE REPLY TO NEWSGROUP! |
#5
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
On 31 Jul, 10:06, "Roger Mills" wrote:
P.S. It's usually better to build extensions bottom up! g In the US when houses get rebuilt sometimes the top of the building is left in place while the rest is removed and rebuilt. This is a way to avoid new build regs, what they call 'grandfather clause' He must be Santa's dad. NT |
#6
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
On 31 Jul, 07:32, Tyler wrote:
I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? TH I rebuild a barn, mostly on a part time DIY basis, arround 75m2, 1m thick walls, with a poor access site, took 3 years (3000-4000 hours) before we moved in, and another 200 or so in painting and the like. Its a how long is a bit of string question really. The right tools make the job so much easier - he says with about 10K invested in tools (including a bobcat) right now. Rick |
#7
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
On 31 Jul, 08:32, "Bob Mannix" wrote:
"Tyler" wrote in message oups.com... I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? I take it your next posted question will be "how long is a piece of string?" ) It's a bit of a silly question and begs the silly answer that it will take longer than you think and the builder will employ as many as it takes. Even with a good builder you will have to leave it up to him, he won't start when he says he will and unforseen problems will make it take longer. Never bank on a finish time is the golden rule. If it's a side extension you will need planning permission as well as building regs approval which means someone to draw up the plans and time for the planning process. If you get a crap builder he might be able to start straight away. Asuuming you find a decent one through personal recommendation (and depending on the area), you may have a long lead time. For an extension of that size you could be looking at a very small outfit of 4-5 people or a larger one of up 8-10 working on it at one time or another. Some may only attend for a short time as subs (eg electrician, roofer) and some will attend as required (chippy). If you start the process now, you may get actual building started before Christmas (assuming you go the decent builder route). -- Bob Mannix (anti-spam is as easy as 1-2-3 - not) Thanks, very helpful. I I have a garage next to the house with a 3 ft wide path so I was just considering attaching to the house but a couple people think I should get the top/ down extension and I'm hoping it'll be around 65k though not had a quote yet. Anyway, I'll definitely look into it! |
#8
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
On 31 Jul, 21:56, Tyler wrote:
On 31 Jul, 08:32, "Bob Mannix" wrote: "Tyler" wrote in message roups.com... I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? I take it your next posted question will be "how long is a piece of string?" ) It's a bit of a silly question and begs the silly answer that it will take longer than you think and the builder will employ as many as it takes. Even with a good builder you will have to leave it up to him, he won't start when he says he will and unforseen problems will make it take longer. Never bank on a finish time is the golden rule. If it's a side extension you will need planning permission as well as building regs approval which means someone to draw up the plans and time for the planning process. If you get a crap builder he might be able to start straight away. Asuuming you find a decent one through personal recommendation (and depending on the area), you may have a long lead time. For an extension of that size you could be looking at a very small outfit of 4-5 people or a larger one of up 8-10 working on it at one time or another. Some may only attend for a short time as subs (eg electrician, roofer) and some will attend as required (chippy). If you start the process now, you may get actual building started before Christmas (assuming you go the decent builder route). -- Bob Mannix (anti-spam is as easy as 1-2-3 - not) Thanks, very helpful. I I have a garage next to the house with a 3 ft wide path so I was just considering attaching to the house but a couple people think I should get the top/ down extension and I'm hoping it'll be around 65k though not had a quote yet. Anyway, I'll definitely look into it!- Hide quoted text - - Show quoted text - guess it out at arround 1000-1200 per m2 of new floor space, and you will be in the ball park, unless you go stupid with expensive finichies and fancy work. Rick |
#9
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
"Rick" wrote in message ups.com... On 31 Jul, 21:56, Tyler wrote: On 31 Jul, 08:32, "Bob Mannix" wrote: "Tyler" wrote in message roups.com... I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? I take it your next posted question will be "how long is a piece of string?" ) It's a bit of a silly question and begs the silly answer that it will take longer than you think and the builder will employ as many as it takes. Even with a good builder you will have to leave it up to him, he won't start when he says he will and unforseen problems will make it take longer. Never bank on a finish time is the golden rule. If it's a side extension you will need planning permission as well as building regs approval which means someone to draw up the plans and time for the planning process. If you get a crap builder he might be able to start straight away. Asuuming you find a decent one through personal recommendation (and depending on the area), you may have a long lead time. For an extension of that size you could be looking at a very small outfit of 4-5 people or a larger one of up 8-10 working on it at one time or another. Some may only attend for a short time as subs (eg electrician, roofer) and some will attend as required (chippy). If you start the process now, you may get actual building started before Christmas (assuming you go the decent builder route). -- Bob Mannix (anti-spam is as easy as 1-2-3 - not) Thanks, very helpful. I I have a garage next to the house with a 3 ft wide path so I was just considering attaching to the house but a couple people think I should get the top/ down extension and I'm hoping it'll be around 65k though not had a quote yet. Anyway, I'll definitely look into it!- Hide quoted text - - Show quoted text - guess it out at arround 1000-1200 per m2 of new floor space, and you will be in the ball park, unless you go stupid with expensive finichies and fancy work. 3-4 years ago I had an 2 storey (1 dry room upstairs and 1 dry room downstairs) extension built. Probably 12m2 up and down, making 25m2 in total. I had 3 quotes for the identical work for the shell plus electrics and plumbing (windows extra). £25k, £35k and £45k! Fortunately, the only one with a personal recommendation was the £25k one and he did an excellent job. I suppose the windows, wood floor and the DIY internals were another £10k (5+3+2k). Add 20% for inflation to get todays prices and I was in Oxfordshire. -- Bob Mannix (anti-spam is as easy as 1-2-3 - not) |
#10
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
On 31 Jul, 07:32, Tyler wrote:
I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? TH Hi I'm not an expert but our neighbours are having an extension of roughly the type and dimensions you describe built and I can tell you that: a) Some days 3 people turn up, some days 2 people arrive to work on the project. b) They started the job in March, are still working on it pretty much every day, and I reckon there's about a month to go. Hope this helps, David |
#11
Posted to uk.d-i-y
|
|||
|
|||
Top-Down Extension - How Long?
On 1 Aug, 09:16, DrC wrote:
On 31 Jul, 07:32, Tyler wrote: I'm considering putting a side extension onto the house (a top and bottom one). It'll be 12ft wide and 27 ft long. Approx how long could/ should it take to complete? How many people should there be employed/ working on such a project? TH Hi I'm not an expert but our neighbours are having an extension of roughly the type and dimensions you describe built and I can tell you that: a) Some days 3 people turn up, some days 2 people arrive to work on the project. b) They started the job in March, are still working on it pretty much every day, and I reckon there's about a month to go. Hope this helps, David Thanks, yes I'll have to get use to the fact my life will be disrupted for a few months! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Long Freeview TV aerial extension cable - use F plugs & satellitecable? | UK diy | |||
Gap between extension | UK diy | |||
Extension | UK diy | |||
extension | UK diy | |||
Shock well - how long is too long? | Home Ownership |