Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.home.repair
|
|||
|
|||
Epoxy putty vs. ABS/a progress report
Well, the last couple of days was
I glopped on ACE two element epoxy to some ABS pipe where I was having a leak, and let it set a couple of days while I went quail hunting. The weather was good, the quail cooperated and sacrificed their lives to the Great White Hunter. Starry clear nights on the Nevada/California border west of Searchlight. I pressurized the solar heater system this morning with the questionable ABS connection. So far, so good. It has been running all day, and no leak. That doesn't mean that it won't start leaking tomorrow, though. It looks like we hopefully are finished with freezing night time temperatures, having about ten degrees above normal temps. Anyhoo, the two part epoxy is holding on ABS. Doesn't someone owe me a quail, and where can I pick it up? Steve |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
OT - Global Warming (Was "Lying Liberals.") | Metalworking | |||
Buffing? | Woodturning | |||
I want a full refund on my engineer's report | Home Ownership | |||
INSTANT CASH FLOW PROGRAM THAT REALLY WORKS!! | Home Ownership | |||
Tubing Roller Progress Report | Metalworking |