Home |
Search |
Today's Posts |
|
Woodworking (rec.woodworking) Discussion forum covering all aspects of working with wood. All levels of expertise are encouraged to particiapte. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to rec.woodworking
|
|||
|
|||
drywalling shop
I need to get some kind of interior finish on my shop walls now that they're
insulated, and I can't come up with a better idea than drywall. I'm going to do this myself, probably with a helper who will probably know less about hanging drywall than I do (which isn't much...the white side faces out, right? ;-). Anyway, it appears that the recommended way to do this is to do the ceiling first, then hang the walls with the drywall parallel to the floor starting at the ceiling and working down. However, to get this thing going, I'd rather do the walls first. Then I would run the electric surface mounted on the drywall. At some later date, I would drywall the ceiling. My main question is: how big of a deal is doing the ceiling after the walls? Also, it would be way easier in my mind to hang the drywall vertically (parallel to the studs) rather than horizontally. For this application, would it be OK? I'm open to any other constructive comments regarding this plan. todd |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Drywalling closet | Home Repair | |||
Drywalling tools | Home Repair | |||
amatuer drywalling | Home Repair | |||
Drywalling Question | Home Repair | |||
drywalling | Home Repair |