UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Martin Westerman
 
Posts: n/a
Default More central heating advice sought

We're currently having a fairly substantial extension built, and will
soon need to decide on heating options. I'd be grateful for advice
and opinions that would put me in a better position to discuss the
options with the builder's "tame" plumber.

First some background on the house and current heating system. We
bought the house about 18 months ago. It's 35 years old, with what I
believe are original (dimplex?) radiators, and the pipes to the ground
floor rads are buried wihin solid floors. The boiler is an Ideal
Classic (of unknown age, suspected 60KBTU), with fully pumped CH/DHW
using a 3 port valve. Hot water cylinder is about 1m high and located
in a large airing cupboard. The loft header tanks are metal and look
well past their use-by date.

I suspect some pumping over into the expansion tank occurs (and may
have done for unknown years) as there seems to be some "gurgling" as
the pump starts and there always seems to be a little air to bleed
from near the pump. The pump itself is set on the fastest of 3
speeds, as it fails to cold start on any other speed.

Currently we only have one bathroom, and four sequential (pumped)
showers make the last person in the queue shiver as the hot water runs
out.

I've basically avoided doing anything with the system as this
extension and revamp has been "around the corner" for ages now. The
extension will add a kitchen (6.5 x3.5m), small utility room (2 x
1.5m), bedroom (5 x 3.5m) and en-suite bathroom (1.5 x 3.5m). I've
done a very unscientific flow test and measured about 15l/min at the
kitchen tap.

What we're ideally looking for is a system that is capable of:
1. heating the larger house
2. coping with at least 4 showers (if stored DHW)
3. hopefully delivering 2 decent showers in parallel (and by decent I
mean more than at header tank pressure)

The first choice would seem to be whether to keep the existing boiler,
or replace it for greater capacity / reliability / efficiency.

The second choice would seem to be whether to start from scratch with
the radiators and buried-in-the-floor pipework.

After that, options so far include:

1. Keep system pretty much as-is, but install larger and faster
recovery indirect cylinder, CW tanks, etc. Add pump for showers.

2. Pressurised cylinder. I've some concern about running existing
radiators and pipes at higher pressures than they're "used to"
(especially a leak in a solid floor would not be fun)

3. Largeish combi. Concern about water pressure as above, also I've
some doubts about ability to deliver 2 showers in parallel.

4. Thermal store / heat bank. Seems ideal in that it would provide
header tank pressure CH, with mains pressure DHW. Not sure what the
drawbacks might be other than maybe cost or possible lack of awareness
by plumber.

Any comments on the above (or any additional) options welcome, along
with any other suggestions. Recommendations on makes / models to
consider would also be gratefully appreciated.

Thanks in advance,
Martin

  #2   Report Post  
Lurch
 
Posts: n/a
Default

On Sun, 21 Nov 2004 19:07:33 +0000, Martin Westerman
strung together this:

4. Thermal store / heat bank. Seems ideal in that it would provide
header tank pressure CH, with mains pressure DHW. Not sure what the
drawbacks might be other than maybe cost or possible lack of awareness
by plumber.

That's what I was thinking, although my advice on specifics of the
subject may be misinformed so I'll leave that to a couple of others
who know more about these than me.
What I did think was that this is not a project for a 'tame' plumber.
I would consider looking for a local installer with more knowledge of
these systems before agreeing to anything with the builder.
--

SJW
A.C.S. Ltd
url here when I get around to it
Please reply to group or use 'usenet' in email subject
  #3   Report Post  
Owain
 
Posts: n/a
Default

"Martin Westerman" wrote
| What we're ideally looking for is a system that is capable of:
| 1. heating the larger house
| 2. coping with at least 4 showers (if stored DHW)
| 3. hopefully delivering 2 decent showers in parallel (and by
| decent I mean more than at header tank pressure)

An alternative might be to install a new CW tank and HW cylinder in the
extension, for the kitchen and en-suite. That would mean the existing
cylinder and tank would have about half the workload and should be less
inadequate.

The new HW cylinder could be heated off the primary of the existing boiler,
possibly boosted with electric immersion in the depths of winter if the
boiler is struggling (which it probably will, especially with recovery of
hot water temps, but with twice the amount of stored hot water this may be
less inconvenient that what you have now). The primary circuit you run into
the extension can, if large enough pipes, run both the HW and the radiators
in the extension.

Having an independent system in the extension would then mean you could rip
out the boiler and old tank/cylinder and replace with better, in the future,
with less disruption. Once you have installed the new boiler, tanks and
controls, both HW cylinders should then give quick recovery performance.

You probably want to stay with a vented tank system both because of your
concerns over pipework leaks, and because 15l/m at the mains won't be at all
great shared between two showers.

Owain


  #4   Report Post  
Roger Nevell
 
Posts: n/a
Default

"Owain" wrote in message ...
"Martin Westerman" wrote
| What we're ideally looking for is a system that is capable of:
| 1. heating the larger house
| 2. coping with at least 4 showers (if stored DHW)
| 3. hopefully delivering 2 decent showers in parallel (and by
| decent I mean more than at header tank pressure)

An alternative might be to install a new CW tank and HW cylinder in the
extension, for the kitchen and en-suite. That would mean the existing
cylinder and tank would have about half the workload and should be less
inadequate.

The new HW cylinder could be heated off the primary of the existing boiler,
possibly boosted with electric immersion in the depths of winter if the
boiler is struggling (which it probably will, especially with recovery of
hot water temps, but with twice the amount of stored hot water this may be
less inconvenient that what you have now). The primary circuit you run into
the extension can, if large enough pipes, run both the HW and the radiators
in the extension.

Having an independent system in the extension would then mean you could rip
out the boiler and old tank/cylinder and replace with better, in the future,
with less disruption. Once you have installed the new boiler, tanks and
controls, both HW cylinders should then give quick recovery performance.

You probably want to stay with a vented tank system both because of your
concerns over pipework leaks, and because 15l/m at the mains won't be at all
great shared between two showers.

Owain


I think you should give the Combi idea a miss. Currently available
domestic combi-boilers deliver about 12-14l/m, this would be marginal
for two simultaneously operating showers. Also, at 15l/m, I'm not
sure your supply pressure would be high enough. Fine for one though,
so maybe a hybrid system would suit?

Roger
  #5   Report Post  
Martin Westerman
 
Posts: n/a
Default

Roger Nevell wrote:
I think you should give the Combi idea a miss. Currently available
domestic combi-boilers deliver about 12-14l/m, this would be marginal
for two simultaneously operating showers. Also, at 15l/m, I'm not
sure your supply pressure would be high enough. Fine for one though,
so maybe a hybrid system would suit?


Thanks to all who took the trouble to reply - I'm hoping to be meeting
up with the plumber later this week and may post his proposals for any
reactions.

Roger - the chances of you being a different Roger Nevell to the one I
know seem rather slim. Hope life's treating you well and (assuming
you're not a complete stranger) do you fancy a beer if we can manage
to meet up over Christmas?

BRs,
Martin

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Rayburn integrated into central heating David Cawkwell UK diy 2 February 8th 05 06:23 PM
Central Heating removing sludge and changing radiator Ch. Rajinder Nijjhar Jatt Home Repair 1 May 16th 04 12:15 AM
central heating installation (nottingham) Nick UK diy 1 March 3rd 04 11:39 AM
Central Heating control unit replacement - advice please Damian Home Repair 1 December 29th 03 01:35 AM
central heating probs mark UK diy 3 October 20th 03 11:35 AM


All times are GMT +1. The time now is 11:16 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"