#1
|
|||
|
|||
UFH Screed & Additive Advice
Hi,
I am looking to install underfloor heating in a new build conservatory. I will be using 50mm Celotex insulation and UFH pipes attached to a steel mesh. I will be getting a local tradesman in to do the 75mm screed. I have seen various UFH information that talks about using an additive in the screed. What screed mix should I be looking for i.e. sand/cement/grit ratios and what type/where can I get the right additive for this application? Cheers Steve.. |
#2
|
|||
|
|||
UFH Screed & Additive Advice
Steve House wrote:
Hi, I am looking to install underfloor heating in a new build conservatory. I will be using 50mm Celotex insulation and UFH pipes attached to a steel mesh. I will be getting a local tradesman in to do the 75mm screed. I have seen various UFH information that talks about using an additive in the screed. What screed mix should I be looking for i.e. sand/cement/grit ratios and what type/where can I get the right additive for this application? Cheers Steve.. Unless you need the wire mesh for structural reason it's MUCH easier to use the red plastic stuff illustrated here http://www.polypipe.com/POLYPIPE/pp_..._02-01-03.html the pipes just clip in Nick Brooks |
#3
|
|||
|
|||
UFH Screed & Additive Advice
Nick Brooks wrote:
Steve House wrote: Hi, I am looking to install underfloor heating in a new build conservatory. I will be using 50mm Celotex insulation and UFH pipes attached to a steel mesh. I will be getting a local tradesman in to do the 75mm screed. I have seen various UFH information that talks about using an additive in the screed. What screed mix should I be looking for i.e. sand/cement/grit ratios and what type/where can I get the right additive for this application? Cheers Steve.. Unless you need the wire mesh for structural reason it's MUCH easier to use the red plastic stuff illustrated here http://www.polypipe.com/POLYPIPE/pp_..._02-01-03.html the pipes just clip in Nick Brooks Well, I did need the steel for structural reasons, and it took about half a day to tie wrap the pipes to it. Loosely. No special additive needed in the screed. The plastic trays were a LOT more expensive than a day of my time to do about 150 sq meters of floor. Even if you inlcuded the cost of the steel. The only thing worth saying is that teh csreed was mixed in a cement mixer, and teh variability from the oafs that mixed it caused some problems. If its a big area, get a contractor in and readymix. ISTR it was about 5:1 sand to cement and a pretty dry mix. I did get some cracks where the job was not completed in a single day - but I poured a lot of sligthtly diluted PVA down the cracks and in time it set, shrank, and pulled it all back to one solid lump. Good trick. In practivce it woorks superbly - UF and sreed. I did need to do a fair bit of levelling afterwards tho. Screeders can seldom achieve the necessary accuracy in the speed required. |
#4
|
|||
|
|||
UFH Screed & Additive Advice
I already have the steel mesh & the pipe I am using is 16x2 pe-xc/al/pe-xc
so it keeps its shape when bent. Those red plastic sheets are a bit expensive! "Nick Brooks" wrote in message ... Steve House wrote: Hi, I am looking to install underfloor heating in a new build conservatory. I will be using 50mm Celotex insulation and UFH pipes attached to a steel mesh. I will be getting a local tradesman in to do the 75mm screed. I have seen various UFH information that talks about using an additive in the screed. What screed mix should I be looking for i.e. sand/cement/grit ratios and what type/where can I get the right additive for this application? Cheers Steve.. Unless you need the wire mesh for structural reason it's MUCH easier to use the red plastic stuff illustrated here http://www.polypipe.com/POLYPIPE/pp_..._02-01-03.html the pipes just clip in Nick Brooks |
#5
|
|||
|
|||
UFH Screed & Additive Advice
Does 4:1 sharp sand : portland cement with a plasticiser such as liquid
Febmix sound about right? "Steve House" wrote in message ... Hi, I am looking to install underfloor heating in a new build conservatory. I will be using 50mm Celotex insulation and UFH pipes attached to a steel mesh. I will be getting a local tradesman in to do the 75mm screed. I have seen various UFH information that talks about using an additive in the screed. What screed mix should I be looking for i.e. sand/cement/grit ratios and what type/where can I get the right additive for this application? Cheers Steve.. |
#6
|
|||
|
|||
UFH Screed & Additive Advice
In message anCbc.163$4Y4.8@newsfe1-win, Steve House
writes Does 4:1 sharp sand : portland cement with a plasticiser such as liquid Febmix sound about right? "Steve House" wrote in message ... Hi, I am looking to install underfloor heating in a new build conservatory. I will be using 50mm Celotex insulation and UFH pipes attached to a steel mesh. I will be getting a local tradesman in to do the 75mm screed. I have seen various UFH information that talks about using an additive in the screed. What screed mix should I be looking for i.e. sand/cement/grit ratios and what type/where can I get the right additive for this application? We use 10 parts quarry dust, 2 parts plastering sand, 3 parts cement. Mix with water gauged with mortar plasticiser so that squeezing the mix hard in your fist hardly produces a drop of water. If the mix is being hand screeded put it down in layers so that you can compact the mix around the pipes and ensure that there are no voids. Machine screeding is *much* easier and quicker. Finish off the last layer by tamping and screeding. 3 to 4 hours later you can walk on the mix to float it off with a wooden (plastic) float. This should be fine for ceramic or quarry tiles once it has cured (could take 12 weeks). Be patient. For a smooth finish polish with a steel trowel. Power float is *much* easier and quicker. Lay down a plastic sheet to retard setting. -- mark |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Any advice with painters mate ? | UK diy | |||
Thin screed and underfloor heating? | UK diy | |||
Screed floors | UK diy | |||
latex screed on concrete floor | UK diy |