Home |
Search |
Today's Posts |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to uk.d-i-y
|
|||
|
|||
RCBO marking.
Just fitted a couple of RCBOs to an older split load CU on the non RCD
protected side. And was curious about how the terminals are labelled. The output terminals (load) are marked Load N and Load 2. Why not Load L? -- *Change is inevitable, except from a vending machine. Dave Plowman London SW To e-mail, change noise into sound. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Contactum RCBO- am I doing something wrong | UK diy | |||
MK RCBO wiring | UK diy | |||
MCB -> RCBO | UK diy | |||
RCBO friendly CU re clearance (merlin gerin 1-mod) | UK diy | |||
Volex RCBO / MK Sentry CU | UK diy |