Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]()
Posted to uk.d-i-y
|
|||
|
|||
![]()
Re 80A fuse...
- Tail size can force a derating - Not uncommon to replace 100A by 80A these days Condition of some networks might not disconnect a 100A fuse due to Ze drift, so the DNO are fitting 80A fuse as a lot cheaper than maintenance which is typically fixed-fee min-bid and repair not replace. Like the daft "dig a road up 50x to replace 50 gas leaks rather than mole a new pipe in once". If you "paid" for a 100A fuse upgrade I'm not sure what they would do, probably check Ze at that point in time. Re radio teleswitches... - AFAIK they did not follow summer/wintertime adjustment - So E7 ended at 7:30am in winter, but became 8:30am in summer re BST |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New electricity meter - rip-off | UK diy | |||
Checking an Electricity meter | UK diy | |||
Electricity meter is rattling | UK diy | |||
Third party electricity meter to verify electricity bills | Home Repair | |||
Electricity Meter | UK diy |