Home |
Search |
Today's Posts |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
Central Heating Install: Building Control system/procedures etc
Any Experience of dealing with Part L Building Regs/Building Control &
how to not fall foul of the system would be welcomed Particularly: 1. What things MUST be done by a "competent"/qualified person (eg connect up the boiler) - can I physically install it (bolt it to wall etc & connect it to the primary circuit)? NB I need a sealed CH system and new HW cyl. (Not been convinced about Combis, esp flow rate - my bath HW flows @16 litres/min. & I don't want to get into the Great Combi Debate, at least not in this thread ;-) ) 2. It seems that the fee must be based on a written estimate from a plumber - which is unethical to get one round to quote when I have not the wherewithal to get them to do the job, esp as they must know that it costs £4-5k for most CH- is this just my local Council, or how they are required to operate? Ta Jonathan -- Posted via Mailgate.ORG Server - http://www.Mailgate.ORG |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Central Heating not starting | UK diy | |||
Under-floor heating for a bathroom - hot water or electric, and how to control? | UK diy | |||
Central Heating Pump | UK diy | |||
Central Heating Component ID? | UK diy |