Home |
Search |
Today's Posts |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to uk.d-i-y
|
|||
|
|||
outside rendering
I built a concrete block wall this summer and rendered it about a month
ago. I applied 2 layers of render the first was well scratched before the second was applied a week later. I used sand:cement 4:1 with waterproofer 1:25. About a week ago the top later detatched itself from the base layer and fell off. The other walls I did are also losing thier top coat (they sound hollow). What did I do wrong? Was the cement too old (about 3 months)? Did I over float the top coat to get it level? I thought I'd done a very nice job and wish I'd stuck at one coat of render! Many thanks Alan of Exeter. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Rendering Garden Walls | UK diy | |||
Removing rendering | UK diy | |||
Rendering. how to repair / what type of mix | UK diy | |||
RENDERING MADE EASY?!! | UK diy | |||
Why sharp sand for rendering? | UK diy |