UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
N Cook
 
Posts: n/a
Default Time before permanent re-instatement of concrete path ?

3 holes in concrete path trying to locate mains water leak.
3 inches of concrete over 18 inches of gravelly soil.

Transpired 2 problems under the 2 foot of pavement of water board supply
pipe
but I still have 3 holes to deal with after the backfill has settled.
The original problem a hole in lead pipe one foot from their water meter
but also to the amazement of the water board bods. The meter installers had
just
push 'fitted' a plastic-pipe type connector on to the end of the lead pipe
and not
a compression fitting - although not actually leaking it could easily be
rotated
by hand.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Time Delay RCDs Christopher Key UK diy 8 December 17th 04 12:56 PM
OT Guns more Guns Cliff Metalworking 519 December 12th 04 05:52 AM
OT - $87 Billion Moore Cliff Huprich Metalworking 142 July 26th 04 08:19 PM
Repairing concrete floor in shop Todd Fatheree Woodworking 10 June 3rd 04 08:18 AM
Acid vs. concrete. Cafe1 Home Repair 17 May 13th 04 02:39 AM


All times are GMT +1. The time now is 02:54 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"