Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]() |
#2
![]() |
|||
|
|||
![]()
On Sun, 18 Sep 2005 13:53:08 GMT, a particular chimpanzee named fred
randomly hit the keyboard and produced: Before talking to the manufacturer I'd be inclined to power flush the system properly (including the boiler) and refill with inhibitor, sounds like the power flush will be needed on the final system anyway and it gives the manufacturer one less thing to find fault with if they carry out an inspection. Unfortunately, any water in would just cascade over the kitchen floor. It sounds like you're putting it down to experience I certainly don't want to chalk it up to experience, but in the first instance, she needs a working central heating system, and if she's to have to pay out to a third party for someone to provide that, then our only hope is to try and recover that from someone. I don't want to take actions now that's going to stymie that ("you didn't give us a chance to examine the system even though we couldn't get someone out there until mid-November"). -- Hugo Nebula "If no-one on the internet wants a piece of this, just how far from the pack have you strayed?" |
#3
![]() |
|||
|
|||
![]()
In article , Hugo Nebula
abuse@localhost.? writes On Sun, 18 Sep 2005 13:53:08 GMT, a particular chimpanzee named fred randomly hit the keyboard and produced: Before talking to the manufacturer I'd be inclined to power flush the system properly (including the boiler) and refill with inhibitor, sounds like the power flush will be needed on the final system anyway and it gives the manufacturer one less thing to find fault with if they carry out an inspection. Unfortunately, any water in would just cascade over the kitchen floor. I see, but you could isolate the pipework to flush through. There is a risk that sludge might have moved through the system and dumped in the heat exchanger, if the mfr sees something like that then it would be a big negative. It sounds like you're putting it down to experience I certainly don't want to chalk it up to experience, but in the first instance, she needs a working central heating system, and if she's to have to pay out to a third party for someone to provide that, then our only hope is to try and recover that from someone. I don't want to take actions now that's going to stymie that ("you didn't give us a chance to examine the system even though we couldn't get someone out there until mid-November"). Yes, good to get it sorted now, re. evidence, got a video camera? -- fred |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New condensing boiler installation - truth or lies | UK diy | |||
Condensing Boiler News | UK diy | |||
Boiler problem: flushing a dual tube heat exchanger | UK diy | |||
11degC across Boiler, why? | UK diy | |||
Heat banks (again!) | UK diy |