Metalworking (rec.crafts.metalworking) Discuss various aspects of working with metal, such as machining, welding, metal joining, screwing, casting, hardening/tempering, blacksmithing/forging, spinning and hammer work, sheet metal work.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Fred May
 
Posts: n/a
Default Sub-MainI in Shop


Several months or so ago there was a thread here I think. Googling etc.
to no avail,. Somebody wrote that there was someplace in the National
Electrical Code that said that for sub-mains you had to lift the neutral
(isolate it) in the sub-main box, and run it back to the main box. I am
looking for where (article) where this is mentioned.
Also I hear rumored that there is now a spec that calls out that if a
line is #14, 15 amp it has to be a particular color, and also a #12, 20
amp it has to be another color. I am about to rewire the shop and would
like to have it up to the code. As above article or any info??

Many thanks for the info.

Phredd (Fred)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Was Shop heat---update Andrew V Metalworking 33 March 5th 06 03:32 PM
What projects did you make in HS woodshop class? Owen Lawrence Woodworking 62 March 1st 05 05:21 PM
Refuge - Thoughts On Being In The Shop This Evening Tom Watson Woodworking 11 June 6th 04 03:42 AM
Machine and Fab Shop Space Leased! Tod Engine Foundation Metalworking 2 May 3rd 04 03:39 AM
OT (kinda) High School Wood Shop V.E. Dorn Woodworking 16 January 22nd 04 09:21 PM


All times are GMT +1. The time now is 10:10 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"