Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
Nailing T1-11 siding
I am building a shed and am ready to nail up the T1-11 siding. My
question is how to nail it at the vertical overlap seams. I am getting different answers at Lowes and HD. Some are saying 1 nail through both panels, others are saying nail through each panel separately. |
#2
|
|||
|
|||
I have always nailed thru the overlap with one nail and never had any problems.
Hopefully your joints will fall on a stud :-) |
#3
|
|||
|
|||
If they don't, he should fire the carpenter!
david Randd01 wrote: I have always nailed thru the overlap with one nail and never had any problems. Hopefully your joints will fall on a stud :-) |
#4
|
|||
|
|||
I thought he was building the shed himslef.
Thats why I threw in the wise crack lol! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Beginner : Nailing up T-111 siding | Woodworking | |||
buying a house with Weyerhaeuser siding | Home Repair | |||
Vinyl windows and siding: need to make decision | Home Repair |