Nailing T1-11 siding
I am building a shed and am ready to nail up the T1-11 siding. My
question is how to nail it at the vertical overlap seams. I am getting different answers at Lowes and HD. Some are saying 1 nail through both panels, others are saying nail through each panel separately. |
I have always nailed thru the overlap with one nail and never had any problems.
Hopefully your joints will fall on a stud :-) |
If they don't, he should fire the carpenter! :)
david Randd01 wrote: I have always nailed thru the overlap with one nail and never had any problems. Hopefully your joints will fall on a stud :-) |
I thought he was building the shed himslef.
Thats why I threw in the wise crack lol! |
All times are GMT +1. The time now is 12:11 PM. |
Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter