Trying to finish a basement, and where we intend to put a partition
wall with a door is right where a contractor left a 6" duct below the
floor joists. He did this to go under a piece of microlam that is
used of support in that part of the house.

I know better than to cut into the microlam, but can I purchase a some
ductwork that will flatten out in the area where it will pass under
the microlam and hug the ceiling ?
If I could recover 2" I could install a standard interior door without
modifications.

Thanks
  #2   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,199
Default Flatting out ductwork ...

On Jan 28, 1:36*pm, sid wrote:
Trying to finish a basement, and where we intend to put a partition
wall with a door is right where a contractor left a 6" duct below the
floor joists. *He did this to go under a piece of microlam that is
used of support in that part of the house.

I know better than to cut into the microlam, but can I purchase a some
ductwork that will flatten out in the area where it will pass under
the microlam and hug the ceiling ?
If I could recover 2" I could install a standard interior door without
modifications.

Thanks


6" duct is equivelant to 3 1/4" X 10" rectangle, so figure it will
hang down about 3 1/4". They sell 6" round to rect converter pieces at
Lowes or HD. You can get straight or a 90 deg converter if that helps
you.
  #3   Report Post  
Posted to alt.home.repair
sid sid is offline
external usenet poster
 
Posts: 109
Default Flatting out ductwork ...

On Jan 28, 12:42*pm, Mikepier wrote:
On Jan 28, 1:36*pm, sid wrote:

Trying to finish a basement, and where we intend to put a partition
wall with a door is right where a contractor left a 6" duct below the
floor joists. *He did this to go under a piece of microlam that is
used of support in that part of the house.


I know better than to cut into the microlam, but can I purchase a some
ductwork that will flatten out in the area where it will pass under
the microlam and hug the ceiling ?
If I could recover 2" I could install a standard interior door without
modifications.


Thanks


6" duct is equivelant to 3 1/4" X 10" rectangle, so figure it will
hang down about 3 1/4". They sell 6" round to rect converter pieces at
Lowes or HD. You can get straight or a 90 deg converter if that helps
you.


Can I find pieces that will replace the current elbows ?
All this contractor did was elbow it down under the joist and back up.
  #4   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 4,764
Default Flatting out ductwork ...

sid wrote:
On Jan 28, 12:42*pm, Mikepier wrote:

6" duct is equivelant to 3 1/4" X 10" rectangle, so figure it will
hang down about 3 1/4". They sell 6" round to rect converter pieces at
Lowes or HD. You can get straight or a 90 deg converter if that helps
you.


Can I find pieces that will replace the current elbows ?
All this contractor did was elbow it down under the joist and back up.


There may be such an animal, but I've never seen one. You might have
to cut the round 6" and move the elbows farther away from the beam,
then reinstall the elbows, and add the transition pieces with the
rectangular duct in between the elbows.

R
  #5   Report Post  
Posted to alt.home.repair
Joe Joe is offline
external usenet poster
 
Posts: 2,837
Default Flatting out ductwork ...

On Jan 28, 12:36*pm, sid wrote:
Trying to finish a basement, and where we intend to put a partition
wall with a door is right where a contractor left a 6" duct below the
floor joists. *He did this to go under a piece of microlam that is
used of support in that part of the house.

I know better than to cut into the microlam, but can I purchase a some
ductwork that will flatten out in the area where it will pass under
the microlam and hug the ceiling ?
If I could recover 2" I could install a standard interior door without
modifications.

Thanks


Oval ducting is being used in new construction in our area and there
is some stock in local box stores like Menards IIRC. There were
adapters and transition pieces, some of which could work for you. They
are sized to go between partition studs.
An alternative would be asking a good sheet metal shop to price a duct
to duct adapter. The modest price may well be worth not having the
aggravation of cobbling together a run of oddball non stock fixtures.
Good luck.

Joe


  #6   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,199
Default Flatting out ductwork ...

Go to HD or Lowes and go to the sheet metal duct area, and put
together some pieces and see if it will work for you. Bring a ruler so
you know more or less where you would have to cut the existing 6"
round.
When you look for the 90 deg part that has to around the beam, look
for a "short" 90 to give you max clearance. You might find it in the
section where they sell the range fans, dryer connections and
accessories.
  #7   Report Post  
Posted to alt.home.repair
dpb dpb is offline
external usenet poster
 
Posts: 12,595
Default Flatting out ductwork ...

sid wrote:
....
Can I find pieces that will replace the current elbows ?
All this contractor did was elbow it down under the joist and back up.


Prefab, probably not, at least at the box stores.

I see several choices depending on what your actual situation is wrt
routing.

The "best" would probably be to go back some distance on either side of
the glulam and insert a round to rectangular transition, go to a 45, add
sufficient length to reach the next 45 to horizontal transition, carry
it under the 'lam then reverse the sections on the other side. This
will give you the clearance at the low point with the side benefit of
minimizing and reducing existing pressure drop in the existing 4-90's at
the cost, of course, of making the transition on both sides longer.

Sorta' like (you'll need non-proportional font for this to have any
chance at all)...

| |
O O O - -- | | -- - O O O
\ |_| /
\-------/

where the "O" is the round and the "-\/" are the rectangular sections
and the arrows indicate the transitions. You could, of course, do the
first to elbows in round and transition going down but am assuming
you'll need that to be as tight as possible.

You may need the rectangular 45s made at a tin shop; the rounds should
be readily available or could use the adjustables if not.

A good tin shop is your friend...

--
  #8   Report Post  
Posted to alt.home.repair
sid sid is offline
external usenet poster
 
Posts: 109
Default Flatting out ductwork ...

On Jan 28, 2:01*pm, dpb wrote:
sid wrote:

...

Can I find pieces that will replace the current elbows ?
All this contractor did was elbow it down under the joist and back up.


Prefab, probably not, at least at the box stores.

I see several choices depending on what your actual situation is wrt
routing.

The "best" would probably be to go back some distance on either side of
the glulam and insert a round to rectangular transition, go to a 45, add
sufficient length to reach the next 45 to horizontal transition, carry
it under the 'lam then reverse the sections on the other side. *This
will give you the clearance at the low point with the side benefit of
minimizing and reducing existing pressure drop in the existing 4-90's at
the cost, of course, of making the transition on both sides longer.

Sorta' like (you'll need non-proportional font for this to have any
chance at all)...

* * * * * * * * *| |
* O O O - -- * *| | * *-- - O O O
* * * * * * *\ * |_| * /
* * * * * * * \-------/

where the "O" is the round and the "-\/" are the rectangular sections
and the arrows indicate the transitions. *You could, of course, do the
first to elbows in round and transition going down but am assuming
you'll need that to be as tight as possible.

You may need the rectangular 45s made at a tin shop; the rounds should
be readily available or could use the adjustables if not.

A good tin shop is your friend...

--


Thanks for all the info ..

I will visit HD or Lowes tonight.
Also, should I be concerned about adding these transitions and an
extra elbow ?
Will this add significant static pressure to this run ?
  #9   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 4,764
Default Flatting out ductwork ...

sid wrote:

I will visit HD or Lowes tonight.
Also, should I be concerned about adding these transitions and an
extra elbow ?
Will this add significant static pressure to this run ?


You have enough problems now with the four 90s in close proximity.
dpb's suggestion of using 4 45s would help with the static pressure.
I'd do the 45s in round duct and use the transitions just on the flat
rectangular run.

Of course other factors we can't see might prevent you from choosing
the extended, smoother transition solution.

R
  #10   Report Post  
Posted to alt.home.repair
dpb dpb is offline
external usenet poster
 
Posts: 12,595
Default Flatting out ductwork ...

RicodJour wrote:
sid wrote:
I will visit HD or Lowes tonight.
Also, should I be concerned about adding these transitions and an
extra elbow ?
Will this add significant static pressure to this run ?


You have enough problems now with the four 90s in close proximity.
dpb's suggestion of using 4 45s would help with the static pressure.
I'd do the 45s in round duct and use the transitions just on the flat
rectangular run.

....
That would leave him still at the same bottom height once he made the
return to horizontal is the problem. He needs to get to the lower
profile earlier. He could do it in the transition, but I figured might
as well just go ahead and make the transition, then the detour.

Reiterate what I said earlier and your agreement; this will be _less_
static pressure than previous using 4-90s. I don't see where OP gets
the "extra elbow" idea...

--


  #11   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,934
Default Flatting out ductwork ...


"sid" wrote in message
...
Trying to finish a basement, and where we intend to put a partition
wall with a door is right where a contractor left a 6" duct below the
floor joists. He did this to go under a piece of microlam that is
used of support in that part of the house.

I know better than to cut into the microlam, but can I purchase a some
ductwork that will flatten out in the area where it will pass under
the microlam and hug the ceiling ?
If I could recover 2" I could install a standard interior door without
modifications.



*You can get just about any duct configuration fabricated at a sheet metal
shop. Some A/C contractors have their own shops that fabricate or there are
independent companies around. Check your yellow pages. The cost may not be
too bad. You will need to at least provide them with measurements although
a rough diagram with measurements would be better. Maybe you need to
transition from round to rectangular.

  #12   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 4,764
Default Flatting out ductwork ...

dpb wrote:
RicodJour wrote:
sid wrote:
I will visit HD or Lowes tonight.
Also, should I be concerned about adding these transitions and an
extra elbow ?
Will this add significant static pressure to this run ?


You have enough problems now with the four 90s in close proximity.
dpb's suggestion of using 4 45s would help with the static pressure.
I'd do the 45s in round duct and use the transitions just on the flat
rectangular run.

...
That would leave him still at the same bottom height once he made the
return to horizontal is the problem. He needs to get to the lower
profile earlier. He could do it in the transition, but I figured might
as well just go ahead and make the transition, then the detour.


That's not necessarily so. He'll be working it backwards from the
rectangular duct which is placed up tight against the beam. The
bottom of the rectangular duct will be the same as the bottom of the
round-to-rectangular transition.
http://www.pillsburysme.com/product_...arge/423-l.jpg
All of the height differential, connections and potential headroom
savings, will take place above that.

Reiterate what I said earlier and your agreement; this will be _less_
static pressure than previous using 4-90s. I don't see where OP gets
the "extra elbow" idea...


This I do not know. Maybe it's a time and materials job.

R
  #13   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,066
Default Flatting out ductwork ...

You need to maintain the same number of square inches. If the
existing is 6" round, the square inch capacity is about 27 square
inches. Stop at any tin shop, explain your problem, ask them to
make a transition that will work.

If you are framing a wall directly under the glulam, add two lally
columns that are swallowed by the wall and go through the glulam.

--
______________________________
Keep the whole world singing . . . .
DanG (remove the sevens)




"sid" wrote in message
...
Trying to finish a basement, and where we intend to put a
partition
wall with a door is right where a contractor left a 6" duct
below the
floor joists. He did this to go under a piece of microlam that
is
used of support in that part of the house.

I know better than to cut into the microlam, but can I purchase
a some
ductwork that will flatten out in the area where it will pass
under
the microlam and hug the ceiling ?
If I could recover 2" I could install a standard interior door
without
modifications.

Thanks



  #14   Report Post  
Posted to alt.home.repair
sid sid is offline
external usenet poster
 
Posts: 109
Default Flatting out ductwork ...

On Jan 28, 6:37*pm, "DanG" wrote:
You need to maintain the same number of square inches. *If the
existing is 6" round, the square inch capacity is about 27 square
inches. *Stop at any tin shop, explain your problem, ask them to
make atransitionthat will work.

If you are framing a wall directly under the glulam, add two lally
columns that are swallowed by the wall and go through the glulam.

--
______________________________
Keep the whole world singing . . . .
DanG *(remove the sevens)


"sid" wrote in message

...



Trying to finish a basement, and where we intend to put a
partition
wall with a door is right where a contractor left a 6" duct
below the
floor joists. *He did this to go under a piece of microlam that
is
used of support in that part of the house.


I know better than to cut into the microlam, but can I purchase
a some
ductworkthat will flatten out in the area where it will pass
under
the microlam and hug the ceiling ?
If I could recover 2" I could install a standard interior door
without
modifications.


Thanks- Hide quoted text -


- Show quoted text -


RicodJour, The pic that you posted is almost exactly what I need. I
had imagined something like a transition offset to one side, but with
an elbow pointed upward. I will try to get a pic of the problem
posted.
The extra elbow(s) that I was talking about was the extra elbows
needed to run the duct back up in and through the floor joists. The
contactor after elbowing the duct under the microlam just suspended
the duct under the floor joists for the rest of the run. There is
room to run the duct through the joists and recover some ceiling space
in that area.


  #15   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 5,149
Default Flatting out ductwork ...

DanG wrote:
You need to maintain the same number of square inches. If the
existing is 6" round, the square inch capacity is about 27 square
inches. Stop at any tin shop, explain your problem, ask them to
make a transition that will work.

If you are framing a wall directly under the glulam, add two lally
columns that are swallowed by the wall and go through the glulam.


Uh, NO!. Leaving aside questions about possibly weakening the gluelam
out past the top pads on the lally columns, you are assuming the floor
under the base of the columns will handle the point loads. Sure, it will
PROBABLY work for a few years, at least until OP moves, but you can
never be sure. Any time you add a column to replace load-bearing
structure, proper procedure is to add a footer under it. At a minimum,
you need a plate to spread the load.

--
aem sends...


  #16   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 4,764
Default Flatting out ductwork ...

aemeijers wrote:
DanG wrote:
You need to maintain the same number of square inches. If the
existing is 6" round, the square inch capacity is about 27 square
inches. Stop at any tin shop, explain your problem, ask them to
make a transition that will work.

If you are framing a wall directly under the glulam, add two lally
columns that are swallowed by the wall and go through the glulam.


Uh, NO!. Leaving aside questions about possibly weakening the gluelam
out past the top pads on the lally columns, you are assuming the floor
under the base of the columns will handle the point loads. Sure, it will
PROBABLY work for a few years, at least until OP moves, but you can
never be sure. Any time you add a column to replace load-bearing
structure, proper procedure is to add a footer under it. At a minimum,
you need a plate to spread the load.


Or you could build the concrete footer/pad on top of the slab, but
that would be a less than optimal solution for most situations.

You're point though is taken. You can't rearrange a load path willy
nilly.

R
  #17   Report Post  
Posted to alt.home.repair
sid sid is offline
external usenet poster
 
Posts: 109
Default Flatting out ductwork ...

On Jan 28, 11:19*pm, RicodJour wrote:
aemeijers wrote:
DanG wrote:
You need to maintain the same number of square inches. *If the
existing is 6" round, the square inch capacity is about 27 square
inches. *Stop at any tin shop, explain your problem, ask them to
make a transition that will work.


If you are framing a wall directly under the glulam, add two lally
columns that are swallowed by the wall and go through the glulam.


Uh, NO!. Leaving aside questions about possibly weakening the gluelam
out past the top pads on the lally columns, you are assuming the floor
under the base of the columns will handle the point loads. Sure, it will
PROBABLY work for a few years, at least until OP moves, but you can
never be sure. Any time you add a column to replace load-bearing
structure, proper procedure is to add a footer under it. At a minimum,
you need a plate to spread the load.


Or you could build the concrete footer/pad on top of the slab, but
that would be a less than optimal solution for most situations.

You're point though is taken. *You can't rearrange a load path willy
nilly.

R- Hide quoted text -

- Show quoted text -


I visited HD and found a transition to 2-1/4" x 12". (27sq")
Here are some photos: http://picasaweb.google.com/basement009/Duct#
View full size to see the labels.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
metal ductwork vs fiberglass ductwork Zack Home Repair 5 February 6th 07 01:33 AM
DC Ductwork Jimmy Woodworking 2 May 21st 06 10:43 PM
ductwork question SeaKan Home Repair 1 February 10th 06 09:13 PM
Ductwork Aaron Affleck Home Ownership 2 July 25th 05 11:46 PM
Escher ductwork Tom Gardner Metalworking 34 February 13th 04 06:13 PM


All times are GMT +1. The time now is 01:11 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"