Default Levelling a site for an above ground pool with crushed rock???

I'm planning on installing an above ground pool. I had the excavator
dig out the required area needed. However, at a point he hit a solid
rock ledge and was unable to proceed further without a lot more effort.
Is it possible to raise one end of the pool about 7 or eight inches w/
crushed rock to level the site out??? Or will that one side of the
pool "settle" in when filling the pool? Any other ideas??? Maybe some
retaining wall blocks?? Railroad ties?? Plain old dirt??

Any ideas appreciated. Thanks

  #2   Report Post  
Posted to alt.home.repair
Sacramento Dave
 
Posts: n/a
Default Levelling a site for an above ground pool with crushed rock???


wrote in message
ps.com...
I'm planning on installing an above ground pool. I had the excavator
dig out the required area needed. However, at a point he hit a solid
rock ledge and was unable to proceed further without a lot more effort.
Is it possible to raise one end of the pool about 7 or eight inches w/
crushed rock to level the site out??? Or will that one side of the
pool "settle" in when filling the pool? Any other ideas??? Maybe some
retaining wall blocks?? Railroad ties?? Plain old dirt??

Any ideas appreciated. Thanks



I would start buy talking to the pool manufactures I'm sure this is a common
problem. My thoughts would build a raised pad under the pool. I would make
the ground under the area is compacted ( I would guess it is) As for a
filler sand might be a good idea just buy wetting it you get a good
compaction.


  #4   Report Post  
Posted to alt.home.repair
Goedjn
 
Posts: n/a
Default Levelling a site for an above ground pool with crushed rock???

On Sat, 27 May 2006 16:35:04 -0400, Dan Espen
wrote:

writes:

I'm planning on installing an above ground pool. I had the excavator
dig out the required area needed. However, at a point he hit a solid
rock ledge and was unable to proceed further without a lot more effort.
Is it possible to raise one end of the pool about 7 or eight inches w/
crushed rock to level the site out??? Or will that one side of the
pool "settle" in when filling the pool? Any other ideas??? Maybe some
retaining wall blocks?? Railroad ties?? Plain old dirt??



If I understand correctly, you'd planned on excavating to X feet,
and did so for most of the pool, and at one end hit ledge at
X feet minus about 8", right? ANd now you want to fill
the part you've just dug out back up to level with the
top of the ledge, and raise the eventual height of the pool
by that amount?

The first thing I'd do is take a hunk of re-bar, and find out
how much farther you'd have to go to get to solid ledge at the
low end. If it's within a foot or two, dig it all out to
rock, and then either build the pool to match, (with a deep
and a shallow end) or fill with concrete, and get a dead-level
bottom that won't move, ever.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Black Walnut Question tdstr Woodworking 19 April 12th 06 08:42 PM
Above Ground Pool strategies for winter survival in the Northeast.... Gino F. Home Repair 6 November 18th 05 02:01 AM
Site prep for pool (above ground) Ed H Home Repair 7 June 12th 05 02:06 AM
electrical interruption Choreboy Home Repair 41 April 17th 05 10:14 PM
Question To you HVAC folks Gunner Metalworking 23 January 12th 04 12:15 PM


All times are GMT +1. The time now is 04:01 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"