Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
URGENT ADVISE NEEDED: Do I pull out the post?
I just pounded a galvanized steel post 24" into the ground, and poured
concrete around it for a mail box. It just started pouring outside. What would that do to the concrete? Will it mess it up? Should I pull out the post while the concrete is not 100% set and do it again another day? or should I leave it? Thanks, MC |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Tech: B&K 465 conversion help needed. Long post | Electronics Repair | |||
Urgent help needed: Nexus power amps - ION-systems | Electronics | |||
Screed how long to dry URGENT REPLIES NEEDED HELP! | UK diy | |||
Crawlspace moisture, odors in house, urgent help needed before closing on home purchase | Home Repair | |||
fence installation tips needed (3-rail post & rail and wire mesh) | Home Repair |