Home |
Search |
Today's Posts |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
Some may remember my question from a week or so ago about fitting a
gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? Thanks Luke |
#2
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
In article ,
Luke writes: Some may remember my question from a week or so ago about fitting a gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? The cable doesn't need sleeving for it's protection, but you do need to prevent any leaking gas getting into the wall. Why are you running the earth through the wall anyway? Just connect it to the pipe on the inside, as it emerges from the sleeve. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] |
#3
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
On 1 Aug, 09:17, (Andrew Gabriel) wrote:
In article , * * * * Luke writes: Some may remember my question from a week or so ago about fitting a gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? The cable doesn't need sleeving for it's protection, but you do need to prevent any leaking gas getting into the wall. Why are you running the earth through the wall anyway? Just connect it to the pipe on the inside, as it emerges from the sleeve. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] Thanks. If I understand you correctly you are suggesting I connect the earth to the gas pipe on the inside of the house whereas I was under the impression the earth connection had to be sited JUST AFTER the gas meter, i.e. in the box. Therefore I have planned to run the earth out from under the floor void, next to the gas pipe and then up to the meter. Photo he http://s598.photobucket.com/albums/tt70/LukeDavies/?action=view¤t=31072010094.jpg Hope this is OK. As you can (probably just) see I have already drilled a hole left of the sleeve to take the earth wire. Luke |
#4
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
On Sun, 1 Aug 2010 08:17:47 +0000 (UTC), Andrew Gabriel wrote:
Why are you running the earth through the wall anyway? Doesn't the earth connection have to be to the metal of the pipe that emerges from the ground ie before any joints/meters etc... Or does that vary depending on the stype of electricity supply and this connection just being an equipotential bond (better consumer side of the meter) or part of the safety earth bonding (better supply side)? -- Cheers Dave. |
#5
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
"Luke" wrote in message ... On 1 Aug, 09:17, (Andrew Gabriel) wrote: In article , Luke writes: Some may remember my question from a week or so ago about fitting a gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? The cable doesn't need sleeving for it's protection, but you do need to prevent any leaking gas getting into the wall. Why are you running the earth through the wall anyway? Just connect it to the pipe on the inside, as it emerges from the sleeve. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] Thanks. If I understand you correctly you are suggesting I connect the earth to the gas pipe on the inside of the house whereas I was under the impression the earth connection had to be sited JUST AFTER the gas meter, i.e. in the box. Therefore I have planned to run the earth out from under the floor void, next to the gas pipe and then up to the meter. Photo he http://s598.photobucket.com/albums/tt70/LukeDavies/?action=view¤t=31072010094.jpg Hope this is OK. As you can (probably just) see I have already drilled a hole left of the sleeve to take the earth wire. Luke It looks to me that the gas pipe comes in under the floorboards. The clamp would then not be visible for inspection if you clamped it on the inside. So you will be better taking the cable to inside the gas meter box and doing the bonding there. No need to sleeve the cable Cheers Adam |
#6
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
On 01/08/2010 09:28, Luke wrote:
On 1 Aug, 09:17, (Andrew Gabriel) wrote: In , writes: Some may remember my question from a week or so ago about fitting a gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? The cable doesn't need sleeving for it's protection, but you do need to prevent any leaking gas getting into the wall. Why are you running the earth through the wall anyway? Just connect it to the pipe on the inside, as it emerges from the sleeve. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] Thanks. If I understand you correctly you are suggesting I connect the earth to the gas pipe on the inside of the house whereas I was under the impression the earth connection had to be sited JUST AFTER the gas meter, i.e. in the box. Therefore I have planned to run the earth out from under the floor void, next to the gas pipe and then up to the meter. Photo he http://s598.photobucket.com/albums/tt70/LukeDavies/?action=view¤t=31072010094.jpg Hope this is OK. As you can (probably just) see I have already drilled a hole left of the sleeve to take the earth wire. Luke Is that vertical cracks on the harling where it meets the facing brick. Is this a new build? -- Regards Camdor. |
#7
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
On 1 Aug, 10:01, "Dave Liquorice"
wrote: On Sun, 1 Aug 2010 08:17:47 +0000 (UTC), Andrew Gabriel wrote: Why are you running the earth through the wall anyway? Doesn't the earth connection have to be to the metal of the pipe that emerges from the ground ie before any joints/meters etc... * Or does that vary depending on the stype of electricity supply and this connection just being an equipotential bond (better consumer side of the meter) or part of the safety earth bonding (better supply side)? -- Cheers Dave. On (metal) pipework within 600mm of the meter on the consumers side of the meter but before any branches or tees OR within 600mm of the point of entry to the building if the meter is external. Having the bond visible at the meter cabinet saves silly bits of card being left by Transco fitters saying bonding should be investigated if they do a meter change or other work. |
#8
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
cynic wrote:
On 1 Aug, 10:01, "Dave Liquorice" wrote: On Sun, 1 Aug 2010 08:17:47 +0000 (UTC), Andrew Gabriel wrote: Why are you running the earth through the wall anyway? Doesn't the earth connection have to be to the metal of the pipe that emerges from the ground ie before any joints/meters etc... Or does that vary depending on the stype of electricity supply and this connection just being an equipotential bond (better consumer side of the meter) or part of the safety earth bonding (better supply side)? -- Cheers Dave. On (metal) pipework within 600mm of the meter on the consumers side of the meter but before any branches or tees OR within 600mm of the point of entry to the building if the meter is external. Having the bond visible at the meter cabinet saves silly bits of card being left by Transco fitters saying bonding should be investigated if they do a meter change or other work. Quite often gas companies put insulators in their meters to stop currents passing down their metal pipes. Cheers -- Adam |
#9
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
On 1 Aug, 10:57, Camdor wrote:
On 01/08/2010 09:28, Luke wrote: On 1 Aug, 09:17, (Andrew Gabriel) wrote: In , * * * * *writes: Some may remember my question from a week or so ago about fitting a gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? The cable doesn't need sleeving for it's protection, but you do need to prevent any leaking gas getting into the wall. Why are you running the earth through the wall anyway? Just connect it to the pipe on the inside, as it emerges from the sleeve. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] Thanks. If I understand you correctly you are suggesting I connect the earth to the gas pipe on the inside of the house whereas I was under the impression the earth connection had to be sited JUST AFTER the gas meter, i.e. in the box. Therefore I have planned to run the earth out from under the floor void, next to the gas pipe and then up to the meter. Photo he http://s598.photobucket.com/albums/tt70/LukeDavies/?action=view&curre.... Hope this is OK. As you can (probably just) see I have already drilled a hole left of the sleeve to take the earth wire. Luke Is that vertical cracks on the harling where it meets the facing brick. * Is this a new build? -- I've just learnt a new word ("harling"). "a mixture of lime and gravel" http://dictionary.reference.com/browse/harling I thought it was just plain old render! Yes they are cracks but only very fine ones. The house was built in 1957. What I do know, is that it is much tougher than I imagined it to be, and very well adhered to the brick. So, although they are a bit unsightly, I do not think the harling is inherently weak. I am sort of assuming that when I paint the exterior of the house, the viscous paint will simply fill those cracks in. Luke |
#10
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
On 01/08/2010 14:34, Luke wrote:
On 1 Aug, 10:57, wrote: On 01/08/2010 09:28, Luke wrote: On 1 Aug, 09:17, (Andrew Gabriel) wrote: In , writes: Some may remember my question from a week or so ago about fitting a gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? The cable doesn't need sleeving for it's protection, but you do need to prevent any leaking gas getting into the wall. Why are you running the earth through the wall anyway? Just connect it to the pipe on the inside, as it emerges from the sleeve. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] Thanks. If I understand you correctly you are suggesting I connect the earth to the gas pipe on the inside of the house whereas I was under the impression the earth connection had to be sited JUST AFTER the gas meter, i.e. in the box. Therefore I have planned to run the earth out from under the floor void, next to the gas pipe and then up to the meter. Photo he http://s598.photobucket.com/albums/tt70/LukeDavies/?action=view&curre... Hope this is OK. As you can (probably just) see I have already drilled a hole left of the sleeve to take the earth wire. Luke Is that vertical cracks on the harling where it meets the facing brick. Is this a new build? -- I've just learnt a new word ("harling"). "a mixture of lime and gravel" http://dictionary.reference.com/browse/harling I thought it was just plain old render! Yes they are cracks but only very fine ones. The house was built in 1957. What I do know, is that it is much tougher than I imagined it to be, and very well adhered to the brick. So, although they are a bit unsightly, I do not think the harling is inherently weak. I am sort of assuming that when I paint the exterior of the house, the viscous paint will simply fill those cracks in. Luke Its always been called Harling in Scotland -- Regards Camdor. |
#11
Posted to uk.d-i-y
|
|||
|
|||
Sleeving earth cable
On 1 Aug, 14:34, Luke wrote:
On 1 Aug, 10:57, Camdor wrote: On 01/08/2010 09:28, Luke wrote: On 1 Aug, 09:17, (Andrew Gabriel) wrote: In , * * * * *writes: Some may remember my question from a week or so ago about fitting a gas meter box. I have fitted the box and it all went fine, no calamaties with the whole wall collapsing and it has turned out pretty neatly. My next question relates to the earth wire which must be run to a point just after the meter. Do I need to sleeve this wire as it comes through the wall or will the PVC coating suffice? The cable doesn't need sleeving for it's protection, but you do need to prevent any leaking gas getting into the wall. Why are you running the earth through the wall anyway? Just connect it to the pipe on the inside, as it emerges from the sleeve. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] Thanks. If I understand you correctly you are suggesting I connect the earth to the gas pipe on the inside of the house whereas I was under the impression the earth connection had to be sited JUST AFTER the gas meter, i.e. in the box. Therefore I have planned to run the earth out from under the floor void, next to the gas pipe and then up to the meter. Photo he http://s598.photobucket.com/albums/tt70/LukeDavies/?action=view&curre... Hope this is OK. As you can (probably just) see I have already drilled a hole left of the sleeve to take the earth wire. Luke Is that vertical cracks on the harling where it meets the facing brick. * Is this a new build? -- I've just learnt a new word ("harling"). "a mixture of lime and gravel"http://dictionary.reference.com/browse/harling I thought it was just plain old render! IME, it's harling if you live in Scotland, otherwise it *is* render. But maybe there is a more subtle difference in the composition to suit Scotland's harsher climate... I know I had to learn a lot of new building words when we moved to Scotland - e.g. dwangs (my favourite word!) Graham |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
cable sleeving | UK diy | |||
Earth sleeving | UK diy | |||
One Earth cable or Two ? | UK diy | |||
Earth Sleeving | UK diy | |||
Earth bonding cable? | UK diy |