  #1   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 2,688
Default bedding inspection chamber

I have fitted 450mm inspection chamber (had to be changed from 300mm
after correspondence with BCO (grrrrr).
I know about bedding the drainage runs in pea gravel etc. But what
about the chambers themselves ? A couple of related questions.

1. The plastic chamber has a hollow base formed by the underside of
the moulding, and little legs around the edge. I've left a good space
8" or so underneath to put concrete to give it a good foundation. It
is currently supported where the concrete will be, by bricks. How far
do you usually put in the concrete - just supporting the little legs,
or right up under the moulding so the whole thing is supported
underneath ?

2. How do you backfill around the chamber ? With pea gravel, or with
soil. Note that eventually a recess cover filled with paving will be
placed on top, and this will need to be supported by a good ring of
concrete around the chamber, and I can't see how this concrete can be
supported on pea gravel around the chamber.

Thanks,
Simon.
  #2   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 143
Default bedding inspection chamber


"sm_jamieson" wrote in message
...
I have fitted 450mm inspection chamber (had to be changed from 300mm
after correspondence with BCO (grrrrr).
I know about bedding the drainage runs in pea gravel etc. But what
about the chambers themselves ? A couple of related questions.

1. The plastic chamber has a hollow base formed by the underside of
the moulding, and little legs around the edge. I've left a good space
8" or so underneath to put concrete to give it a good foundation. It
is currently supported where the concrete will be, by bricks. How far
do you usually put in the concrete - just supporting the little legs,
or right up under the moulding so the whole thing is supported
underneath ?

2. How do you backfill around the chamber ? With pea gravel, or with
soil. Note that eventually a recess cover filled with paving will be
placed on top, and this will need to be supported by a good ring of
concrete around the chamber, and I can't see how this concrete can be
supported on pea gravel around the chamber.


manufacturer's installation instructions eg
http://pdf.hunterplastics.co.uk/pdf/...round/ugt7.pdf will answer your
questions.

Jim A


  #3   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 2,688
Default bedding inspection chamber

On 27 Apr, 08:18, "Jim Alexander" wrote:
"sm_jamieson" wrote in message

...



I have fitted 450mm inspection chamber (had to be changed from 300mm
after correspondence with BCO (grrrrr).
I know about bedding the drainage runs in pea gravel etc. But what
about the chambers themselves ? A couple of related questions.


1. The plastic chamber has a hollow base formed by the underside of
the moulding, and little legs around the edge. I've left a good space
8" or so underneath to put concrete to give it a good foundation. It
is currently supported where the concrete will be, by bricks. How far
do you usually put in the concrete - just supporting the little legs,
or right up under the moulding so the whole thing is supported
underneath ?


2. How do you backfill around the chamber ? With pea gravel, or with
soil. Note that eventually a recess cover filled with paving will be
placed on top, and this will need to be supported by a good ring of
concrete around the chamber, and I can't see how this concrete can be
supported on pea gravel around the chamber.


manufacturer's installation instructions eghttp://pdf.hunterplastics.co.uk/pdf/underground/ugt7.pdfwill answer your
questions.

Jim A


Well, the floplast site (screwfix stuff) says very little. I've also
looked at marley and hunter. The approaches I have seen are backfilled
with granular fill as around the pipes, and the frame and lid
supported on concrete which in some diagrams extends enough to ensure
the
frame/lid is supported on surrounding ground rather than the backfill,
sometimes not !
Or, the whole thing incased in concrete, bottom, sides and frame/lid.
In no case have I seen what http://www.pavingexpert.com suggest, which
is a solid concrete slab underneath, and text suggesting that this is
supporting any weight on the lid transferred via the risers.
So I guess a commonsense engineering approach is required. Which
probably involves lots of concrete !

What I was really hoping was, how do folks usually do this ? Any
comments from experience ?

Simon.
  #4   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 143
Default bedding inspection chamber


"sm_jamieson" wrote in message
...
On 27 Apr, 08:18, "Jim Alexander" wrote:
"sm_jamieson" wrote in message

...



I have fitted 450mm inspection chamber (had to be changed from 300mm
after correspondence with BCO (grrrrr).
I know about bedding the drainage runs in pea gravel etc. But what
about the chambers themselves ? A couple of related questions.


1. The plastic chamber has a hollow base formed by the underside of
the moulding, and little legs around the edge. I've left a good space
8" or so underneath to put concrete to give it a good foundation. It
is currently supported where the concrete will be, by bricks. How far
do you usually put in the concrete - just supporting the little legs,
or right up under the moulding so the whole thing is supported
underneath ?


2. How do you backfill around the chamber ? With pea gravel, or with
soil. Note that eventually a recess cover filled with paving will be
placed on top, and this will need to be supported by a good ring of
concrete around the chamber, and I can't see how this concrete can be
supported on pea gravel around the chamber.


manufacturer's installation instructions
eghttp://pdf.hunterplastics.co.uk/pdf/underground/ugt7.pdfwill answer
your
questions.

Jim A


Well, the floplast site (screwfix stuff) says very little. I've also
looked at marley and hunter. The approaches I have seen are backfilled
with granular fill as around the pipes, and the frame and lid
supported on concrete which in some diagrams extends enough to ensure
the
frame/lid is supported on surrounding ground rather than the backfill,
sometimes not !
Or, the whole thing incased in concrete, bottom, sides and frame/lid.
In no case have I seen what http://www.pavingexpert.com suggest, which
is a solid concrete slab underneath, and text suggesting that this is
supporting any weight on the lid transferred via the risers.


I don't think the www.pavingexpert.com advice is accurate. I prefer the
hunter plastics info. For domestic including domestic driveways I don't
think a concrete base or a full depth concrete surround is required, only a
150mm deep concrete support ring is required. Whether the concrete ring
bears on the granular sidefill or the surrounding ground does not really
matter, both materials are effectively incompressible for domestic loads.

What I was really hoping was, how do folks usually do this ? Any
comments from experience ?


Well as you have found out before backfilling you need to satisfy
inspection, mainly gradient and bedding. After backfilling anything goes.
I think the specs are clear.

Jim A



  #5   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 2,688
Default bedding inspection chamber

On 28 Apr, 10:35, "Jim Alexander" wrote:
"sm_jamieson" wrote in message

...



On 27 Apr, 08:18, "Jim Alexander" wrote:
"sm_jamieson" wrote in message


...


I have fitted 450mm inspection chamber (had to be changed from 300mm
after correspondence with BCO (grrrrr).
I know about bedding the drainage runs in pea gravel etc. But what
about the chambers themselves ? A couple of related questions.


1. The plastic chamber has a hollow base formed by the underside of
the moulding, and little legs around the edge. I've left a good space
8" or so underneath to put concrete to give it a good foundation. It
is currently supported where the concrete will be, by bricks. How far
do you usually put in the concrete - just supporting the little legs,
or right up under the moulding so the whole thing is supported
underneath ?


2. How do you backfill around the chamber ? With pea gravel, or with
soil. Note that eventually a recess cover filled with paving will be
placed on top, and this will need to be supported by a good ring of
concrete around the chamber, and I can't see how this concrete can be
supported on pea gravel around the chamber.


manufacturer's installation instructions
eghttp://pdf.hunterplastics.co.uk/pdf/underground/ugt7.pdfwillanswer
your
questions.


Jim A


Well, the floplast site (screwfix stuff) says very little. I've also
looked at marley and hunter. The approaches I have seen are backfilled
with granular fill as around the pipes, and the frame and lid
supported on concrete which in some diagrams extends enough to ensure
the
frame/lid is supported on surrounding ground rather than the backfill,
sometimes not !
Or, the whole thing incased in concrete, bottom, sides and frame/lid.
In no case have I seen whathttp://www.pavingexpert.comsuggest, which
is a solid concrete slab underneath, and text suggesting that this is
supporting any weight on the lid transferred via the risers.


I don't think thewww.pavingexpert.comadvice is accurate. I prefer the
hunter plastics info. For domestic including domestic driveways I don't
think a concrete base or a full depth concrete surround is required, only a
150mm deep concrete support ring is required. Whether the concrete ring
bears on the granular sidefill or the surrounding ground does not really
matter, both materials are effectively incompressible for domestic loads.

What I was really hoping was, how do folks usually do this ? Any
comments from experience ?


Well as you have found out before backfilling you need to satisfy
inspection, mainly gradient and bedding. After backfilling anything goes.
I think the specs are clear.

Jim A


Yep, its the concrete ring on the top bearing the weight. Fair
enough !
Although concrete underneath wouldn't hurt, even just to hold the
thing in place while you fit the rest of the drainage.
I was wondering in what state the BCO would want the drains. I guess
partly bedded so he could see how you've done it in all aspects. Also,
I'm not sure about testing. My stuff is connected to old clay which
disappears into the soil and down 2 metres to the public sewer. Dunno
what parts of this could be usefully tested.
Simon.


  #6   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 299
Default bedding inspection chamber


"sm_jamieson" wrote in message
...
I have fitted 450mm inspection chamber (had to be changed from 300mm
after correspondence with BCO (grrrrr).
I know about bedding the drainage runs in pea gravel etc. But what
about the chambers themselves ? A couple of related questions.



Bed down on pea gravel, 100mm thick, insert chamber at correct depth, fill
all round with pea gravel at least to within 100mm of chamber and the rest
with graded back fill.
This will suit all domestic installations.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
inspection chamber and pipe gradients sm_jamieson UK diy 13 April 14th 08 11:13 AM
Drain inspection chamber robgraham UK diy 6 March 5th 08 09:55 PM
Inspection chamber: what should water level be? [email protected][_2_] UK diy 24 January 28th 08 09:29 AM
Storm water inspection chamber? Tony Halmarack UK diy 2 August 3rd 04 02:20 PM
New inspection chamber... in the lounge?!! Lobster UK diy 17 November 15th 03 09:24 AM


All times are GMT +1. The time now is 10:32 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"