Hi folks - I haven't lurked or contributed to this group for a while,
but I thought I'd ask for advice on this point.

It would be easier to draw a diagram, but basically we are planning to
change out bathroom. What I want to do is replace the old bath,
washbasin and toilet, but not just replace them in situ as we've done
before, but I want to add one of those units that look a bit like a
narrow version of a kitchen base unit and worktop, that the basin fits
into, and the toilet will back onto (with the cistern concealed in the
unit). Hope that makes sense.

Anyway - currently, if you imagine looking L-R at the configuration,
towards the wall in front of you, we have the bath on the left (taps/
plug end against the wall), then in the middle the washbasin, then the
toilet on the right. I want to keep more or less the same layout L-R,
but with some slight changes (we've considered other options but for
various reasons none of them would work very well - it's only a small
bathroom).

As I said, we want to put a unit behind the basin and toilet. The unit
will stick out a bit from the wall, and the basin will half be set
into the unti with the front of the basin sticking out. The toilet
will of course back onto the unit as above.

There is currently some space between the foot of the bath and the
wall 'behind' you as you look towards the wall ahead.

What we want to do is move the bath backwards toward the 'back' wall,
leaving a gap at the 'top' end of the bath. Then I want to build a
stud wall behind the bath, tile it and have a mixer shower (or even a
shower head on the stud wall, with pipework behind). The idea is to
bring the bath end more or less level with the 'unit'. Why? because we
want to fit a hinged glass screen, which we could open outwards. This
wouldn't be possible if we left the bath where it is, hence the plan
to move it away from the wall.

Hope all that makes sense.

Now, what I mainly need advice on is the building/positioning of the
stud wall. I need to find out:

- how best to position the studwork, allowing for board to cover it
and tiles? i.e. how much clearance to be allowed between studwork and
bath?
- best materials to cover it with, bearing in mind need to tile over
it (plasterboard? MDF? etc.)

I'd also be interested in advice on how to prevent leaks around the
edge of the bath, something we've suffered from in the past. Ideally
I'd like to get a bath with an 'upstand' around the 2 or 3 wall edges,
but I don't know if these exist. Failing that, maybe it's better to
chase it into the wall, and then tile down to it? Or not? I'm fed up
with those plastic strips that don't always work properly and look a
bit naff, IMO, and would prefer to have a more 'permanent' solution.

Any advice would be very welcome.

Thanks in advance

Flummoxed

  #2   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 137
Default Building wall next to bath - advice please



On Jan 29, 12:19 pm, "Flummoxed" wrote:
...
It would be easier to draw a diagram, but basically we are planning to
change out bathroom. What I want to do is replace the old bath,
washbasin and toilet, but not just replace them in situ as we've done
before, but I want to add one of those units that look a bit like a
narrow version of a kitchen base unit and worktop, that the basin fits
into, and the toilet will back onto (with the cistern concealed in the
unit). Hope that makes sense....


We are halfway through doing something very similar. We are putting a
'back to wall' loo (but floor standing) again the unit with the flush
inside the unit, plus a recessed basin in the unit to the right. We
plan to build the 'unit' out of 18mm marine ply. We also plan to use
marine ply to move one wall so it comes right up to the bath. the bath
will then be walled on three sides with a fixed shower screen at the
tap end.

We then plan to have the whole lot tiled. At the time of tiling, the
bath will be fixed in but the basin and loo will be 'loose' -
apparently this is what the tiler wants.

one further point: to give access to the pumbing we plan to make the
'worktop' of the unit removabale, complete with the basin. This means
that the basin will have flexible pipes. We think this is better than
having an access hole with loose lid as the whole 'worktop' can be
made to have a more watertight snug fit.

but as to your question: We plan to fix the bath up against the wall
on three sides and then to tile down to it with a sealant bead around
it. two side are block/plaster walls already, with the plaster
coming down only as far as just above the bath. the third wall will
be the marine ply one.

if you'd like to compare notes in more detail please email me on laws
at bcs dot org dot uk,

Robert


  #3   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 5
Default Building wall next to bath - advice please



On 29 Jan, 12:36, "Robert Laws" wrote:
On Jan 29, 12:19 pm, "Flummoxed" wrote:
..

It would be easier to draw a diagram, but basically we are planning to
change out bathroom. What I want to do is replace the old bath,
washbasin and toilet, but not just replace them in situ as we've done
before, but I want to add one of those units that look a bit like a
narrow version of a kitchen base unit and worktop, that the basin fits
into, and the toilet will back onto (with the cistern concealed in the
unit). Hope that makes sense....We are halfway through doing something very similar. We are putting a

'back to wall' loo (but floor standing) again the unit with the flush
inside the unit, plus a recessed basin in the unit to the right. We
plan to build the 'unit' out of 18mm marine ply. We also plan to use
marine ply to move one wall so it comes right up to the bath. the bath
will then be walled on three sides with a fixed shower screen at the
tap end.

We then plan to have the whole lot tiled. At the time of tiling, the
bath will be fixed in but the basin and loo will be 'loose' -
apparently this is what the tiler wants.

one further point: to give access to the pumbing we plan to make the
'worktop' of the unit removabale, complete with the basin. This means
that the basin will have flexible pipes. We think this is better than
having an access hole with loose lid as the whole 'worktop' can be
made to have a more watertight snug fit.

but as to your question: We plan to fix the bath up against the wall
on three sides and then to tile down to it with a sealant bead around
it. two side are block/plaster walls already, with the plaster
coming down only as far as just above the bath. the third wall will
be the marine ply one.

if you'd like to compare notes in more detail please email me on laws
at bcs dot org dot uk,

Thanks for the helpful response Robert - that was quick! I assume you
chose marine ply as the best option for the stud wall based on a
recommendation? I admit I hadn't looked into it. I guess it needs to
be strong and fairly rigid, to take tiling.

As for the bath, we would be planning to do something similar to you,
i.e. have 3 walls round the bath. It sounds as if it's a good idea to
chase the bath end/sides into the wall, so the plaster on the wall
above would stand out above the edge of the bath - have I understood
correctly? In that case it sounds as if it would also be a good idea
to have the marine ply standing out slightly above the end of the bath
too. Then You can tile right down to the bath and seal it as you say.

  #4   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 1,102
Default Building wall next to bath - advice please

On 29 Jan 2007 04:19:52 -0800, "Flummoxed"
wrote:
Having gone down the route of building flimsy walls around the bath,
can i recommend that you abandon the wood construction and think of a
solid wall from Thremalite blocks. They are a quid each and light as a
feather, easy to work with a saw and build nice solid walls that dont
flex and crack grout around the bath.

  #5   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 2,688
Default Building wall next to bath - advice please



On 29 Jan, 12:19, "Flummoxed" wrote:
Hi folks - I haven't lurked or contributed to this group for a while,
but I thought I'd ask for advice on this point.

It would be easier to draw a diagram, but basically we are planning to
change out bathroom. What I want to do is replace the old bath,
washbasin and toilet, but not just replace them in situ as we've done
before, but I want to add one of those units that look a bit like a
narrow version of a kitchen base unit and worktop, that the basin fits
into, and the toilet will back onto (with the cistern concealed in the
unit). Hope that makes sense.

Anyway - currently, if you imagine looking L-R at the configuration,
towards the wall in front of you, we have the bath on the left (taps/
plug end against the wall), then in the middle the washbasin, then the
toilet on the right. I want to keep more or less the same layout L-R,
but with some slight changes (we've considered other options but for
various reasons none of them would work very well - it's only a small
bathroom).

As I said, we want to put a unit behind the basin and toilet. The unit
will stick out a bit from the wall, and the basin will half be set
into the unti with the front of the basin sticking out. The toilet
will of course back onto the unit as above.

There is currently some space between the foot of the bath and the
wall 'behind' you as you look towards the wall ahead.

What we want to do is move the bath backwards toward the 'back' wall,
leaving a gap at the 'top' end of the bath. Then I want to build a
stud wall behind the bath, tile it and have a mixer shower (or even a
shower head on the stud wall, with pipework behind). The idea is to
bring the bath end more or less level with the 'unit'. Why? because we
want to fit a hinged glass screen, which we could open outwards. This
wouldn't be possible if we left the bath where it is, hence the plan
to move it away from the wall.

Hope all that makes sense.

Now, what I mainly need advice on is the building/positioning of the
stud wall. I need to find out:

- how best to position the studwork, allowing for board to cover it
and tiles? i.e. how much clearance to be allowed between studwork and
bath?
- best materials to cover it with, bearing in mind need to tile over
it (plasterboard? MDF? etc.)

I'd also be interested in advice on how to prevent leaks around the
edge of the bath, something we've suffered from in the past. Ideally
I'd like to get a bath with an 'upstand' around the 2 or 3 wall edges,
but I don't know if these exist. Failing that, maybe it's better to
chase it into the wall, and then tile down to it? Or not? I'm fed up
with those plastic strips that don't always work properly and look a
bit naff, IMO, and would prefer to have a more 'permanent' solution.


The plastic strips over the top of the tiles are totally useless as
you have realised. However, there are types where the upstand on the
strip goes behind the tiles, and you silicone the bottom part onto the
bath. These are very good to prevent leaks, but some think they
look .. naff.
The most important thing is that the bath is fixed very rigidly and
that it cannot move much relative to the wall. This can be hard to
achieve with cheap plastic baths. I always have a timber frame of some
sort to support the bath around the edges and screw to the wall where
possible.
If the bath is rigid enough, put a thick bead of silicone in the
"groove" where the bath meets the wall (you can almost glue the bath
to the wall with it). Try to have the upper edge of the bead sloping
towards the bath. Then tile down to the bath, leaving a small gap.
Then put a final silcone bead around the bath/tile interface and into
the gap. You cannot do much better than that.
The standard idea of filling the bath before you do the bead is a good
idea, since the gap will then be at its widest, and the silcone will
be compressed rather than stretched, which could pull away from the
wall.
But if the bath is rigid enough, it won't move anyway !
I'm just finishing my bathroom, not sure yet to use the under-tile
strip or not at this point.
Simon.


Any advice would be very welcome.

Thanks in advance

Flummoxed




  #6   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 137
Default Building wall next to bath - advice please



On Jan 29, 2:44 pm, EricP wrote:
On 29 Jan 2007 04:19:52 -0800, "Flummoxed"
wrote:
Having gone down the route of building flimsy walls around the bath,
can i recommend that you abandon the wood construction and think of a
solid wall from Thremalite blocks. They are a quid each and light as a
feather, easy to work with a saw and build nice solid walls that dont
flex and crack grout around the bath.


EricP, That's interesting. I hadn't though of doing that. However,
in my case, the wall I am extending inwards is an external wall made
of wood (it's a 1960s house) so it would be rather odd to have
thermalite inside and then the existing plywood outside (with tiles
outside that).

I tend to like marine ply because I used to live on a boat where
things must be damp-proof and the previous bathroom disintegrated from
the wet. marine ply is very stiff and I think tiles would stick
OK. I am also reluctant to 'build' with bricks/mortar/plastering
because I lack the skills. but maybe I should pay someone to do it,
or learn.

Flummoxed: I had not fully decided how to bring the ply down to the
bath, but yes it could stop just overlapping the top of the bath much
as the plaster does on the other two walls.

Robert


  #7   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 9,045
Default Building wall next to bath - advice please

Flummoxed wrote:

On 29 Jan, 12:36, "Robert Laws" wrote:
On Jan 29, 12:19 pm, "Flummoxed" wrote:
..

It would be easier to draw a diagram, but basically we are planning to
change out bathroom. What I want to do is replace the old bath,
washbasin and toilet, but not just replace them in situ as we've done
before, but I want to add one of those units that look a bit like a
narrow version of a kitchen base unit and worktop, that the basin fits
into, and the toilet will back onto (with the cistern concealed in the
unit). Hope that makes sense....We are halfway through doing something very similar. We are putting a

'back to wall' loo (but floor standing) again the unit with the flush
inside the unit, plus a recessed basin in the unit to the right. We
plan to build the 'unit' out of 18mm marine ply. We also plan to use
marine ply to move one wall so it comes right up to the bath. the bath
will then be walled on three sides with a fixed shower screen at the
tap end.

We then plan to have the whole lot tiled. At the time of tiling, the
bath will be fixed in but the basin and loo will be 'loose' -
apparently this is what the tiler wants.

one further point: to give access to the pumbing we plan to make the
'worktop' of the unit removabale, complete with the basin. This means
that the basin will have flexible pipes. We think this is better than
having an access hole with loose lid as the whole 'worktop' can be
made to have a more watertight snug fit.

but as to your question: We plan to fix the bath up against the wall
on three sides and then to tile down to it with a sealant bead around
it. two side are block/plaster walls already, with the plaster
coming down only as far as just above the bath. the third wall will
be the marine ply one.

if you'd like to compare notes in more detail please email me on laws
at bcs dot org dot uk,

Thanks for the helpful response Robert - that was quick! I assume you
chose marine ply as the best option for the stud wall based on a
recommendation? I admit I hadn't looked into it. I guess it needs to
be strong and fairly rigid, to take tiling.


I have used both 19mm ply and also MDF for stud walls to be a bit
structural to take baths and tiling.

I make bath enclosures out of 15mm MDF mostly, on a stud frame. Nice if
painted, nicer if tiled. Go right up to the bath edge and screw battens
on to support the bath lip everywhere. Stiffen weak flimsy baths with
bits of scrap MDF stick on with car body filler.

When done, use silicone to seal the edges and lock bath in place even
more, then tile overall. Use grout at the bath edge..yes it cracks, a
little as the bath flexes away, but it doesn't go mouldy: If can be
arsed, full bath to brim when grouting..thats usually as far as bath
will ever flex.

MDF is a great material for bathroom fitouts - paints like plaster, is
fully structural, and will take splashes well enough..and is MUCH
flatter than any plasterer can skim. And its relatively cheap and its
strong. Only downside is that large butted panels will show a crack line
at the edges one day.

Use plasterboard for non critical tiled areas. Use 19mm ply for really
strong bits like shower base trays or floor recovering before tiling and
the like.












As for the bath, we would be planning to do something similar to you,
i.e. have 3 walls round the bath. It sounds as if it's a good idea to
chase the bath end/sides into the wall, so the plaster on the wall
above would stand out above the edge of the bath - have I understood
correctly? In that case it sounds as if it would also be a good idea
to have the marine ply standing out slightly above the end of the bath
too. Then You can tile right down to the bath and seal it as you say.

  #8   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 25,191
Default Building wall next to bath - advice please

Flummoxed wrote:

I'd also be interested in advice on how to prevent leaks around the
edge of the bath, something we've suffered from in the past. Ideally
I'd like to get a bath with an 'upstand' around the 2 or 3 wall edges,
but I don't know if these exist. Failing that, maybe it's better to
chase it into the wall, and then tile down to it? Or not?


With a a bath it is indeed better to chase into the wall (this adds
rigidity to the bath as well), and then tile down to it. This tends to
"hide" the roll edge of the bath, and leave a flat surface to tile to -
hence eliminating one of the potential moisture traps at the edge.

If you tile down to the bath, leave a tiles thickness gap at the bottom
of the tile. Then when sealing, fill the bath with water first (to set
it at its lowest position), and then seal with a good quality silicone.
Don't let the water out until it is fully cured. This will ensure the
natural state of the silicone is slightly under compression, relaxing as
you fill the bath, rather than streatching (and hence more likely to
fail) as you fill it. The tile's width gap will also ensure the selant
gets a good solid key.


--
Cheers,

John.

/================================================== ===============\
| Internode Ltd - http://www.internode.co.uk |
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/
  #9   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 25,191
Default Building wall next to bath - advice please

Robert Laws wrote:

I tend to like marine ply because I used to live on a boat where
things must be damp-proof and the previous bathroom disintegrated from


For general building use marine ply is typically overkill, and a waste
of money. WBP ply is more than adequate.



--
Cheers,

John.

/================================================== ===============\
| Internode Ltd - http://www.internode.co.uk |
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/
  #10   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 143
Default Building wall next to bath - advice please

Check out a product called hardibacker on sale at travis perkins and topps
tiles,totaly impervious to water and you can tile straight on it,used it to
line my shower

http://www.jameshardieeu.com/pages.p...ubpage=hbacker




  #11   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 137
Default Building wall next to bath - advice please



On Jan 29, 5:47 pm, John Rumm wrote:
Flummoxed wrote:
I'd also be interested in advice on how to prevent leaks around the
edge of the bath, something we've suffered from in the past. Ideally
I'd like to get a bath with an 'upstand' around the 2 or 3 wall edges,
but I don't know if these exist. Failing that, maybe it's better to
chase it into the wall, and then tile down to it? Or not?With a a bath it is indeed better to chase into the wall (this adds

rigidity to the bath as well), and then tile down to it. This tends to
"hide" the roll edge of the bath, and leave a flat surface to tile to -
hence eliminating one of the potential moisture traps at the edge.

If you tile down to the bath, leave a tiles thickness gap at the bottom
of the tile. Then when sealing, fill the bath with water first (to set
it at its lowest position), and then seal with a good quality silicone.
Don't let the water out until it is fully cured. This will ensure the
natural state of the silicone is slightly under compression, relaxing as
you fill the bath, rather than streatching (and hence more likely to
fail) as you fill it. The tile's width gap will also ensure the selant
gets a good solid key.


Would you roughen the surface of the bath with sandpaper to help the
silicone to key? I mean the part that will be hidden under the
sealant of course!

Robert


  #12   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 25,191
Default Building wall next to bath - advice please

Robert Laws wrote:

Would you roughen the surface of the bath with sandpaper to help the
silicone to key? I mean the part that will be hidden under the
sealant of course!


I have not bothered in the past. You can apply a beading layer between
the (cut out) wall and the bath edge. Then a second one after the tiles
are in place. The bedding layer and the bit in the gap under tiles is
not going to move, so extra adhesion is not really a problem.

--
Cheers,

John.

/================================================== ===============\
| Internode Ltd - http://www.internode.co.uk |
|-----------------------------------------------------------------|
| John Rumm - john(at)internode(dot)co(dot)uk |
\================================================= ================/
  #13   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 5
Default Building wall next to bath - advice please

Thanks for all the advice folks. Sorry I didn't respond till now, but
I've only just checked back here. Once again, some good useful
comments to think about from this group.

Cheers

Flummoxed

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
>> Need advice for building a half-wall with countertop [email protected] Home Repair 11 May 30th 15 04:44 PM
Advice on building outside wall, please? Mike Barnard UK diy 5 May 3rd 06 11:22 AM
building false wall for back-to-wall toilet [email protected] UK diy 12 August 11th 05 06:20 PM
Bath advice Martin Wilson UK diy 2 November 13th 04 06:44 AM
Building a retaining wall next to house wall. Adam UK diy 3 May 24th 04 04:19 PM


All times are GMT +1. The time now is 10:05 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"