Set up a little fiberglass ridge on the read coolant drain channel, so
that coolant all goes to the proper drain.

Then I did what I was afraid to do for a while: I removed a huge
amount of unused wires that went from cabinet to the pendant (where
the control was). I only kept the wires I am using. This way, I
removed a lot of confusing, unused wiring, and made room in the
pendant arm to lay new wires (power to monitor, USB, more signal wires
etc). Kept copious notes and the mill is back to working condition,
but less of a rats' nest.

i
  #2   Report Post  
Posted to rec.crafts.metalworking
external usenet poster
 
Posts: 687
Default Some more mill progress--- almost OT

I understand the rat's nest part, at least.
For many, many years I have been adding things to the computer/video
system and all the wires have been hanging from their respective
connectors, and dangling down to the floor. HUGE rat's nest, and just
about impossible to work with.
My computer "desk" is an old office credenza about 8 feet long and
then there's a 5 opening cabinet that contains various DVD-VHS-CD-audio
things below the wall mounted flat screen TV.
Anyway, recently I made a 5" channel behind the credenza to hold all
the wiring in back and just below the top of it. The rat's nest is the
same size, but at least I can get to all the wiring, and, there is lots
less stress on all the connectors back there.
Once small addtional point: Wherever there are a lot of wires going
into something, like the back of the computer, it pays to take a
picture, print it out and keep it handy for those times when you have to
tear it down for some reason.

By the way, I am very jealous of your NC machine. I had a chance to
work on a Bridgeport EasyTrak for a while at a votech night school. It
sure was easy to get used to for producing parts.

Pete Stanaitis
-------------------

Ignoramus23708 wrote:
Set up a little fiberglass ridge on the read coolant drain channel, so
that coolant all goes to the proper drain.

Then I did what I was afraid to do for a while: I removed a huge
amount of unused wires that went from cabinet to the pendant (where
the control was). I only kept the wires I am using. This way, I
removed a lot of confusing, unused wiring, and made room in the
pendant arm to lay new wires (power to monitor, USB, more signal wires
etc). Kept copious notes and the mill is back to working condition,
but less of a rats' nest.

i

  #3   Report Post  
Posted to rec.crafts.metalworking
external usenet poster
 
Posts: 12
Default Some more mill progress--- almost OT

I try to document all wires. Removing unneeded wires goes a long way
towards reducing wiring mess, too.

i
  #4   Report Post  
Posted to rec.crafts.metalworking
external usenet poster
 
Posts: 1,852
Default Some more mill progress--- almost OT

I was in a building for something like 15 years. It was very high tech place
and we started out with beta level internet and terminal servers - one massive
wire set in the dropped ceiling. Then we went to big hose wire - 25mm or so.
Then other versions and tries and machine types.. When we finally moved out,
the salvage company took two tractor trailer dump bins of wire out. And that
wasn't the wire we had in our offices.

Our place had over 1000 engineers on the floor and managers in their offices.
Our building served as a gateway to the far east from North America - our
massive antenna transported data at all times once the net was ripping.

Our internal net was up and running long before public stuff. It was needed
by ourselves so we built it facility to facility out of local budgets.

So wires - plenty in my life. I have shop boxes like that. I'm shipping
a 25 pair cable with dual 50 pin amphanol connectors to my Dad. He is
rebuilding my 1960's level computer. It is about the bottom half of a
Icebox.

Martin


Martin H. Eastburn
@ home at Lions' Lair with our computer lionslair at consolidated dot net
"Our Republic and the Press will Rise or Fall Together": Joseph Pulitzer
TSRA: Endowed; NRA LOH & Patron Member, Golden Eagle, Patriot's Medal.
NRA Second Amendment Task Force Originator & Charter Founder
IHMSA and NRA Metallic Silhouette maker & member. http://lufkinced.com/

On 8/24/2010 5:36 PM, Ignoramus23408 wrote:
I try to document all wires. Removing unneeded wires goes a long way
towards reducing wiring mess, too.

i

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
More mill progress Ignoramus25139 Metalworking 0 August 22nd 10 06:28 AM
More progress with the mill Ignoramus22661 Metalworking 23 August 13th 10 08:33 AM
Today's CNC mill progress Ignoramus2966 Metalworking 0 July 27th 10 05:57 AM
More mill progress Ignoramus1880 Metalworking 0 July 26th 10 03:33 AM
More mill wiring progress john Metalworking 1 July 25th 10 11:51 PM


All times are GMT +1. The time now is 05:40 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"