Home |
Search |
Today's Posts |
|
Metalworking (rec.crafts.metalworking) Discuss various aspects of working with metal, such as machining, welding, metal joining, screwing, casting, hardening/tempering, blacksmithing/forging, spinning and hammer work, sheet metal work. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to rec.crafts.metalworking
|
|||
|
|||
Some more mill progress
Set up a little fiberglass ridge on the read coolant drain channel, so
that coolant all goes to the proper drain. Then I did what I was afraid to do for a while: I removed a huge amount of unused wires that went from cabinet to the pendant (where the control was). I only kept the wires I am using. This way, I removed a lot of confusing, unused wiring, and made room in the pendant arm to lay new wires (power to monitor, USB, more signal wires etc). Kept copious notes and the mill is back to working condition, but less of a rats' nest. i |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
More mill progress | Metalworking | |||
More progress with the mill | Metalworking | |||
Today's CNC mill progress | Metalworking | |||
More mill progress | Metalworking | |||
More mill wiring progress | Metalworking |