I am creating a reservoir for water from my sump pump. I have the 6' hole
dug, and I laid the concrete footer. I am about to lay the blocks for the walls now. My question is about pipping through the walls. For the outlet pipe which will be on the bottom of the reservoir, should I run a 3" PVC pipe through a hold I cut in a cinder block at the bottom and let the vertical rise occur in the dirt outside of the reservoir? Or should I let the pipe go up on the inside of the wall and out the top of the reservoir, and forget cutting a hole in the concrete block? I will have a 4" intake and a 4" overflow on the opposite side of the reservoir which will be holes in the concrete blocks near the top. Thanks for the tips. CL |
#2
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Aug 25, 4:10*pm, "CL \"dnoyeB\" Gilbert" wrote:
...should I run a 3" PVC pipe through a hold I cut in a cinder block at the bottom and let the vertical rise occur in the dirt outside of the reservoir? *Or should I let the pipe go up on the inside of the wall and out the top of the reservoir, and forget cutting a hole in the concrete block? I will have a 4" intake and a 4" overflow on the opposite side of the reservoir which will be holes in the concrete blocks near the top. Thanks for the tips. CL If you have the space, my opinion is to do it inside the enclosure, so you can always observe/inspect/repair the pipe if needed. Is this exposed to freeze/thaw? Careful to allow for positive drainage and keep insulated/heated, especially if your setup includes a checkvalve. |
#3
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() "CL "dnoyeB" Gilbert" wrote in message news ![]() I am creating a reservoir for water from my sump pump. I have the 6' hole dug, and I laid the concrete footer. I am about to lay the blocks for the walls now. My question is about pipping through the walls. For the outlet pipe which will be on the bottom of the reservoir, should I run a 3" PVC pipe through a hold I cut in a cinder block at the bottom and let the vertical rise occur in the dirt outside of the reservoir? Or should I let the pipe go up on the inside of the wall and out the top of the reservoir, and forget cutting a hole in the concrete block? I will have a 4" intake and a 4" overflow on the opposite side of the reservoir which will be holes in the concrete blocks near the top. Thanks for the tips. How are you sealing the reservoir? Neither cinder block nor concrete are waterproof. |
#4
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() |
#5
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Bob F wrote:
"CL "dnoyeB" Gilbert" wrote in message news ![]() I am creating a reservoir for water from my sump pump. I have the 6' hole dug, and I laid the concrete footer. I am about to lay the blocks for the walls now. My question is about pipping through the walls. For the outlet pipe which will be on the bottom of the reservoir, should I run a 3" PVC pipe through a hold I cut in a cinder block at the bottom and let the vertical rise occur in the dirt outside of the reservoir? Or should I let the pipe go up on the inside of the wall and out the top of the reservoir, and forget cutting a hole in the concrete block? I will have a 4" intake and a 4" overflow on the opposite side of the reservoir which will be holes in the concrete blocks near the top. Thanks for the tips. How are you sealing the reservoir? Neither cinder block nor concrete are waterproof. Damtite. |
#6
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() "CL "dnoyeB" Gilbert" wrote in message . .. Bob F wrote: "CL "dnoyeB" Gilbert" wrote in message news ![]() I am creating a reservoir for water from my sump pump. I have the 6' hole dug, and I laid the concrete footer. I am about to lay the blocks for the walls now. My question is about pipping through the walls. For the outlet pipe which will be on the bottom of the reservoir, should I run a 3" PVC pipe through a hold I cut in a cinder block at the bottom and let the vertical rise occur in the dirt outside of the reservoir? Or should I let the pipe go up on the inside of the wall and out the top of the reservoir, and forget cutting a hole in the concrete block? I will have a 4" intake and a 4" overflow on the opposite side of the reservoir which will be holes in the concrete blocks near the top. Thanks for the tips. How are you sealing the reservoir? Neither cinder block nor concrete are waterproof. Damtite. Thanks. I'll research it. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Digging reservoir in shallow stream | Home Repair | |||
How to clean coolant reservoir ?? | Metalworking | |||
How to clean a insta-hot water reservoir | Home Repair | |||
Reservoir Tank for Air Compressor | Home Repair | |||
Hobs with water reservoir | UK diy |