We are replacing part of a bathroom floor along side a non support wall.
This is because the floor was not installed level and also suffered water
damage. The carpenter said we should put blocking under the wall between
joists since we will be cutting the plywood subfloor next to it and the wall
might eventually sag without the blocking. I certainly agree. The question
I have is should the plywood be just laid and nailed on top of the blocking
or should we add blocking perpendicular and between those first blocks so
the cut edge of the plywood has something to sit on. Thanks for your
advice.


  #2   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 766
Default carpentry question

Art wrote:
We are replacing part of a bathroom floor along side a non support
wall. This is because the floor was not installed level and also
suffered water damage. The carpenter said we should put blocking
under the wall between joists since we will be cutting the plywood
subfloor next to it and the wall might eventually sag without the
blocking. I certainly agree. The question I have is should the
plywood be just laid and nailed on top of the blocking or should we
add blocking perpendicular and between those first blocks so the cut
edge of the plywood has something to sit on. Thanks for your advice.


Assuming that it is the usual 16" OC, it really should not be a problem.
There will be no such blocking where two plywood panels meet in the middle
of the room.

--
Joseph Meehan

Dia 's Muire duit



  #3   Report Post  
Posted to alt.home.repair
Joe Joe is offline
external usenet poster
 
Posts: 2,837
Default carpentry question

On Jun 23, 11:32 am, "Art" wrote:
We are replacing part of a bathroom floor along side a non support wall.
This is because the floor was not installed level and also suffered water
damage. The carpenter said we should put blocking under the wall between
joists since we will be cutting the plywood subfloor next to it and the wall
might eventually sag without the blocking. I certainly agree. The question
I have is should the plywood be just laid and nailed on top of the blocking
or should we add blocking perpendicular and between those first blocks so
the cut edge of the plywood has something to sit on. Thanks for your
advice.


The more edges you tie together in floors, walls, whatever, the
stronger the structure will be. Applies to drywall, too. Your
intuition on this one is absolutely correct. Keep in mind that
construction adhesives add tremendously to overall quality and that is
why more and more quality homes are being litertally glued together
thse days. HTH

Joe

  #4   Report Post  
Posted to alt.home.repair
Art Art is offline
external usenet poster
 
Posts: 788
Default carpentry question


"Joseph Meehan" wrote in message
...
Art wrote:
We are replacing part of a bathroom floor along side a non support
wall. This is because the floor was not installed level and also
suffered water damage. The carpenter said we should put blocking
under the wall between joists since we will be cutting the plywood
subfloor next to it and the wall might eventually sag without the
blocking. I certainly agree. The question I have is should the
plywood be just laid and nailed on top of the blocking or should we
add blocking perpendicular and between those first blocks so the cut
edge of the plywood has something to sit on. Thanks for your advice.


Assuming that it is the usual 16" OC, it really should not be a
problem. There will be no such blocking where two plywood panels meet in
the middle of the room.


We will not have the advantage of tongue and groove fit though as would be
normal where plywood panels meet in the middle of the room in new
construction so that is why I am concerned.


  #5   Report Post  
Posted to alt.home.repair
dpb dpb is offline
external usenet poster
 
Posts: 12,595
Default carpentry question

Art wrote:
"Joseph Meehan" wrote in message
...
Art wrote:
We are replacing part of a bathroom floor along side a non support
wall. This is because the floor was not installed level and also
suffered water damage. The carpenter said we should put blocking
under the wall between joists since we will be cutting the plywood
subfloor next to it and the wall might eventually sag without the
blocking. I certainly agree. The question I have is should the
plywood be just laid and nailed on top of the blocking or should we
add blocking perpendicular and between those first blocks so the cut
edge of the plywood has something to sit on. Thanks for your advice.

Assuming that it is the usual 16" OC, it really should not be a
problem. There will be no such blocking where two plywood panels meet in
the middle of the room.


We will not have the advantage of tongue and groove fit though as would be
normal where plywood panels meet in the middle of the room in new
construction so that is why I am concerned.


Even in new construction w/ T&G or not the edges of subflooring (that
_is_ what you're talking about, right?) are not "left hanging" between
joists in any reasonable construction--the sheets are trimmed to meet on
a joist.

If your retrofit can't cut back to an existing joist for some reason,
then certainly there should be blocking at the joint(s) of adjacent
sheets to avoid the otherwise inevitable springiness that a cantilevered
sheet edge would otherwise be. It seems unlikely in most cases one
couldn't simply go back to the next joist, however.

If you're talking cross-joists and not with the joist direction, then
you're only talking a 16" span and probably can get by, but if there's
access to insert blocking, can't hurt and can't cost much.

imo, ymmv, $0.02, etc., etc., ...

--
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Stupid question? (carpentry) al Home Repair 7 April 24th 07 04:07 PM
a carpentry terminology question. [email protected] Woodworking 5 May 2nd 06 02:09 PM
Carpentry Need Help. [email protected] Woodworking 6 February 21st 06 10:27 PM
Carpentry Need Help. [email protected] Home Repair 1 February 20th 06 03:16 AM
Carpentry Question: Roof over deck (aka porch). John Home Repair 2 September 13th 05 04:25 PM


All times are GMT +1. The time now is 02:22 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"