Home |
Search |
Today's Posts |
![]() |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Late yesterday afternoon I faxed my signed bid to the company who first
bid on the job. Good references, by far the best price. Plus they actually ran a camera through the existing line and didn't charge me a cent. The other guys made their bids on the basis of inspection from above, only. Yesterday afternoon, when I faxed the bid, it was dry, but it rained something fierce overnight. There had been relatively little rain here until last night. Now the ground is going to be saturated. They have to dig at least 4 holes to get down to the existing clay lateral for connections and access to do the trenchless. What affect does the rain have on all this? Thanks for your answers. |
#2
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() Dan_Musicant wrote: Late yesterday afternoon I faxed my signed bid to the company who first bid on the job. Good references, by far the best price. Plus they actually ran a camera through the existing line and didn't charge me a cent. The other guys made their bids on the basis of inspection from above, only. Yesterday afternoon, when I faxed the bid, it was dry, but it rained something fierce overnight. There had been relatively little rain here until last night. Now the ground is going to be saturated. They have to dig at least 4 holes to get down to the existing clay lateral for connections and access to do the trenchless. What affect does the rain have on all this? Thanks for your answers. Would seem to make much more sense to ask them... ![]() |
#3
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Why not ask the folks doing the job?
-- Steve Barker "Dan_Musicant" wrote in message news ![]() Late yesterday afternoon I faxed my signed bid to the company who first bid on the job. Good references, by far the best price. Plus they actually ran a camera through the existing line and didn't charge me a cent. The other guys made their bids on the basis of inspection from above, only. Yesterday afternoon, when I faxed the bid, it was dry, but it rained something fierce overnight. There had been relatively little rain here until last night. Now the ground is going to be saturated. They have to dig at least 4 holes to get down to the existing clay lateral for connections and access to do the trenchless. What affect does the rain have on all this? Thanks for your answers. |
#4
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Tue, 12 Dec 2006 16:46:18 -0600, "Steve Barker LT"
wrote: :Why not ask the folks doing the job? I did. I just thought it best to try to get impartial opinions. They did call me back in response to my faxed bid. But the guy who did the inspection and is going to set up the job hasn't called me. I figure they're real busy with work because of the heavy rains. It's no biggie, my having to wait. I jury rigged the biggest problem - a broken drain. |
#5
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
If these guys are pros, they are used to working outside in all conditions.
It probably won't affect them one bit. Although the finished job may be a little messier due to the mud. "Dan_Musicant" wrote in message news ![]() Late yesterday afternoon I faxed my signed bid to the company who first bid on the job. Good references, by far the best price. Plus they actually ran a camera through the existing line and didn't charge me a cent. The other guys made their bids on the basis of inspection from above, only. Yesterday afternoon, when I faxed the bid, it was dry, but it rained something fierce overnight. There had been relatively little rain here until last night. Now the ground is going to be saturated. They have to dig at least 4 holes to get down to the existing clay lateral for connections and access to do the trenchless. What affect does the rain have on all this? Thanks for your answers. |
#6
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Thu, 14 Dec 2006 11:26:18 -0500, "EXT"
wrote: :If these guys are pros, they are used to working outside in all conditions. :It probably won't affect them one bit. Although the finished job may be a :little messier due to the mud. Yes, they are certainly used to it. I was told that they have been together at this company for a minimum of 6 years. Even so, I know how much a shock cold weather can be in the winter. Around here it's nothing compared to most places in the USA, but compared to where I grew up (Southern CA), it's harsh. Plus these guys are Mexican and I bet some of them grew up south of the border. So far, they've done what looks to my inexperienced eye to be good work. : :"Dan_Musicant" wrote in message :news ![]() : bid on the job. Good references, by far the best price. Plus they : actually ran a camera through the existing line and didn't charge me a : cent. The other guys made their bids on the basis of inspection from : above, only. : : Yesterday afternoon, when I faxed the bid, it was dry, but it rained : something fierce overnight. There had been relatively little rain here : until last night. Now the ground is going to be saturated. They have to : dig at least 4 holes to get down to the existing clay lateral for : connections and access to do the trenchless. : : What affect does the rain have on all this? Thanks for your answers. : |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Orangeberg(SP?) sewer pipe replacement | Home Repair | |||
Sewer Line Repair / Replacement | Home Repair | |||
sewer line replacement | Home Repair | |||
Sewer line replacement | Home Ownership |