  #1   Report Post  
Posted to alt.home.repair
crohnie mom
 
Posts: n/a
Default Basement Plumbing Rough-In question

I've posted this question to a couple of plumbing forums also but
thought I'd see if anyone here could answer me too?

Our builder put in our plumbing rough-in and I have two questions about
what is the usual and customary way to do this.

We were left with just the pipe stub sticking out of the concrete for
the shower and toilet pipes
The toilet pipe is 3" white plastic, PVC probably?

There is no space around it to add the toilet flange? This seems like
a stupid way to leave a rough-in if we have to bust up the concrete
floor to put the flange in? Is this the customary way a basement
rough-in is done on new construction? Is there a way to add the toilet
flange without busting the concrete or raising the toilet?

Also, I'm going to contact the builder because the distance from the
toilet rough-in to the tub/shower drain is too close to meet the code
of 15" clear space from the center of the toilet to the edge of a
standard tub (the way the rough-in is supposed to be laid out. Finally
in order to place the vent pipe inside the same wall running behind the
toilet, it only leaves 11.5" of space to the back of the toilet and as
I'm sure you know 12" is the required amount of space. I think we
could squeeze a toilet in here, but the flange is an issue as is the
distance from the shower/tub

Thank you for any advice in advance,
Kim

  #2   Report Post  
Posted to alt.home.repair
Speedy Jim
 
Posts: n/a
Default Basement Plumbing Rough-In question

crohnie mom wrote:
I've posted this question to a couple of plumbing forums also but
thought I'd see if anyone here could answer me too?

Our builder put in our plumbing rough-in and I have two questions about
what is the usual and customary way to do this.

We were left with just the pipe stub sticking out of the concrete for
the shower and toilet pipes
The toilet pipe is 3" white plastic, PVC probably?

There is no space around it to add the toilet flange? This seems like
a stupid way to leave a rough-in if we have to bust up the concrete
floor to put the flange in? Is this the customary way a basement
rough-in is done on new construction? Is there a way to add the toilet
flange without busting the concrete or raising the toilet?

Also, I'm going to contact the builder because the distance from the
toilet rough-in to the tub/shower drain is too close to meet the code
of 15" clear space from the center of the toilet to the edge of a
standard tub (the way the rough-in is supposed to be laid out. Finally
in order to place the vent pipe inside the same wall running behind the
toilet, it only leaves 11.5" of space to the back of the toilet and as
I'm sure you know 12" is the required amount of space. I think we
could squeeze a toilet in here, but the flange is an issue as is the
distance from the shower/tub

Thank you for any advice in advance,
Kim


There *is* a flange which will drop *inside* the 3" pipe.
Makes for a reduced cross-section but they do work.
The flange should sit on top of the finished concrete.

For the clearance issue you might consider an offset flange.
http://www.plumbingsupply.com/images...set_flanch.jpg
This one fits on the outside of 3" pipe and offsets 1 1/2".
Make 4 pluge cuts with an abrasive saw in the concrete and
excavate around the pipe to accept the flange.

Jim
  #3   Report Post  
Posted to alt.home.repair
MLD
 
Posts: n/a
Default Basement Plumbing Rough-In question


"crohnie mom" wrote in message
oups.com...
I've posted this question to a couple of plumbing forums also but
thought I'd see if anyone here could answer me too?

Our builder put in our plumbing rough-in and I have two questions about
what is the usual and customary way to do this.

We were left with just the pipe stub sticking out of the concrete for
the shower and toilet pipes
The toilet pipe is 3" white plastic, PVC probably?

There is no space around it to add the toilet flange? This seems like
a stupid way to leave a rough-in if we have to bust up the concrete
floor to put the flange in? Is this the customary way a basement
rough-in is done on new construction? Is there a way to add the toilet
flange without busting the concrete or raising the toilet?

Also, I'm going to contact the builder because the distance from the
toilet rough-in to the tub/shower drain is too close to meet the code
of 15" clear space from the center of the toilet to the edge of a
standard tub (the way the rough-in is supposed to be laid out. Finally
in order to place the vent pipe inside the same wall running behind the
toilet, it only leaves 11.5" of space to the back of the toilet and as
I'm sure you know 12" is the required amount of space. I think we
could squeeze a toilet in here, but the flange is an issue as is the
distance from the shower/tub

Thank you for any advice in advance,
Kim

When mine was roughed in the toilet drain pipe was actually just below the
floor level. Closed off with some rags and then a skim coat of cement over
the pipe. Stayed that was for about 2 years, out of the was and then real
easy to get at when I started to finish off the bathroom.
MLD


  #4   Report Post  
Posted to alt.home.repair
J.A. Michel
 
Posts: n/a
Default Basement Plumbing Rough-In question

When I roughed in my basement bathroom, I glued the flange for the toilet on
the pipe and set it to the height that the finish poured floor would be.
The top of the flange ended up pretty much flush with the finished floor. I
left my 2" sink drain pipe stick a good 36" out of the finished concrete. I
can cut and vent when I install the bathroom.


"crohnie mom" wrote in message
oups.com...
I've posted this question to a couple of plumbing forums also but
thought I'd see if anyone here could answer me too?

Our builder put in our plumbing rough-in and I have two questions about
what is the usual and customary way to do this.

We were left with just the pipe stub sticking out of the concrete for
the shower and toilet pipes
The toilet pipe is 3" white plastic, PVC probably?

There is no space around it to add the toilet flange? This seems like
a stupid way to leave a rough-in if we have to bust up the concrete
floor to put the flange in? Is this the customary way a basement
rough-in is done on new construction? Is there a way to add the toilet
flange without busting the concrete or raising the toilet?

Also, I'm going to contact the builder because the distance from the
toilet rough-in to the tub/shower drain is too close to meet the code
of 15" clear space from the center of the toilet to the edge of a
standard tub (the way the rough-in is supposed to be laid out. Finally
in order to place the vent pipe inside the same wall running behind the
toilet, it only leaves 11.5" of space to the back of the toilet and as
I'm sure you know 12" is the required amount of space. I think we
could squeeze a toilet in here, but the flange is an issue as is the
distance from the shower/tub

Thank you for any advice in advance,
Kim



  #5   Report Post  
Posted to alt.home.repair
crohnie mom
 
Posts: n/a
Default Basement Plumbing Rough-In question

Thanks, I had found an offset flange and realized it would solve the
problem, but am hesitant to cut the concrete floor myself. I'm not
sure I like the idea of exposing the floor from moisture from below?
Also having PVC pipe underground, I'm worried about damaging it in the
process. We're fairly competent diy's but this makes me nervous, it
seems like the best solution, though.



  #6   Report Post  
Posted to alt.home.repair
 
Posts: n/a
Default Basement Plumbing Rough-In question

I would presume this piping was layed in the basement or on a
concrete slab right?

The offset pipe will do the trick. As for cutting the concrete, dont
be afraid of it. If you arent comfortable with cutting it away,
you can also use a chisle and hammer. It will take awhile longer
but with care it really isnt that bad of a job. Actually its probably
less messy because a dry concrete blade creates LOTS of dust!

So just break up some conrete, do your plumbing work and pour
a little concrete in to clean things up nice.

Project done

  #7   Report Post  
Posted to alt.home.repair
crohnie mom
 
Posts: n/a
Default Basement Plumbing Rough-In question

Yes, the house is 7 months old and the builder rough-in includes a 2"
vent 3" toilet pipe, 2" shower pipe. The toilet and shower PVC pipe
stubs were left sticking directly out of the concrete in the basement.
Unfortunately they didn't think to wrap the Toilet pipe with any
spacing material to allow for the flange to be fit onto it.
Kim

  #8   Report Post  
Posted to alt.home.repair
CL (dnoyeB) Gilbert
 
Posts: n/a
Default Basement Plumbing Rough-In question

crohnie mom wrote:
Yes, the house is 7 months old and the builder rough-in includes a 2"
vent 3" toilet pipe, 2" shower pipe. The toilet and shower PVC pipe
stubs were left sticking directly out of the concrete in the basement.
Unfortunately they didn't think to wrap the Toilet pipe with any
spacing material to allow for the flange to be fit onto it.
Kim


my toilet pipe was flush to the floor as well with no space. Somehow
the plumber did it that way, and the installer never gave it a 2nd
thought. I think thats how its supposed to be. Anyway, the installer
was putting in floor tile and created a sub-floor on top of the cement,
and the flange was installed just atop the new subfloor.

--
Thank you,


CL Gilbert
"Then said I, Wisdom [is] better than strength: nevertheless the poor
man's wisdom [is] despised, and his words are not heard." Ecclesiastes 9:16
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Plumbing question.... [email protected] Home Repair 1 January 4th 06 02:41 PM
Permit for finished basement req. electrical and Plumbing test...What books to read? [email protected] Home Repair 2 April 13th 05 03:52 PM
Stupid question of the day.... BSP screw-in plumbing connections [email protected] UK diy 6 March 22nd 05 11:17 AM
New Bathroom plumbing question Norm Home Repair 2 December 12th 04 09:39 PM
Pushfit plumbing question Lee Blaver UK diy 18 October 23rd 03 07:58 AM


All times are GMT +1. The time now is 07:44 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"