Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
my switchmaster 905 programmer has just packed in so i thought it was about
time to get a digital one ,Just come back from B&Q with a drayton tempus 7. After taking the front off the switchmaster it revealed this layout on the backplate N-L-1-2-A-B-C-3-4 n-neutral l-live 1 central heating ON 2 CH OFF A.B,C- SPARE 3 HW ON 4 HW OFF feeding this I had 2* 3 core cables 1st Cable - live neutral and the green cable screwed into the spare A 2nd cable - Brown into no1(CH ON) Blue into no 3(HW ON) and Green into No4(HW OFF) OK the new Drayton has this layout on its backplate N-L-1-2-3-4 N-neutral L-live 1 HW OFF 2 CH OFF 3 HW ON 4 CH ON so i connected the cables up as per diagram but did not know where to put the green cable from cable 1 - and assumed it was an earth cable so i plugged it into the earth socket . This configuration now leaves me without a connection into no 2 (CH OFF). I powered up the programmer and everything came on , Great I thought.Set the time ,adjusted the timer settings and set to auto. When the time came for the heating to come on - Nothing - No pump running or 3 port valve switching over Also nothing comes on in manual either. So can any of you kind people help me. Mark |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Upgrading the Central Heating System- BOOM! | UK diy | |||
15mm or 22mm copper pipe for central heating? | UK diy | |||
Hot Air Central Heating | UK diy | |||
Oil-fired central heating control? | UK diy |