Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Just about to put an offer in on a house where the incoming gas supply(after
meter to cooker) travels through a concrete floor but has been boxed in with wood. Over a period of time the wood has rotted away just leaving a 'trough' containing a 15mm copper gas pipe and loads of rotten wood. The ideal way of putting this right would be to fill the trough with fresh concrete but the present owner tells me that it was not done that way in the first place because it would not meet current gas regs. I realise that you have to make provision for any gas leak to be able to escape to outside air but can anyone advise whether encasing the pipe in concrete would fall foul of the regs? Thanks in advance for any advice. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Burying Drainage Pipe & Digging About Buried Facilities | Home Repair | |||
Burying a pipe in concrete | Home Repair | |||
Joining Plastic Waste pipe to Lead pipe | UK diy | |||
plastic air pipe | Woodworking | |||
Replacing old steel water main supply pipe | UK diy |