#7
![]()
Posted to uk.d-i-y
|
|||
|
|||
![]()
In article ,
Roger Mills writes: On 15/05/2018 22:29, Andrew Gabriel wrote: In , Roger writes: The airing cupboard would be by far the easiest place to install the kit. There is ready access to mains water for the filling loop. Because the secondary HW system is unvented, there is a tundish into which anything coming out of the hot cylinder's temperature and pressure relief valve would spill - so that could also accept the output from the primary circuit's PRV. No, the PRV outlet must go outside without any air break, and it should point back against the outside wall. If the system boils, it will be ejecting super heated water and steam. But surely the same thing could happen with near boiling water coming out of the hot cylinder's temperature and pressure relief valve? That goes into a tundish with an air gap. Why the distinction? There's a massive difference between nearly boiling, and super-heated water and steam. Also, an immersion heater is typically 3kW when it gets stuck on (think, a kettle boiling). A central heating boiler is going to be 25-50kW when stuck on - a completely different ball game and very dangerous for anyone caught in the steam, particularly in the confines of a house. Yes, mostly it just handles a failed pressure vessel, but it is also there to handle much more serious failures. There is an uninterrupted connection to the boiler - albeit in 15mm pipe, and probably 3 metres vertical and 3 metres horizontal away. The boiler's installation manual says to put the the PRV on the flow pipe, close to the boiler and before the pump inlet. But that seems to assume a single pump on the flow side, prior to any zone valves, etc. But this system ain't like that! There are two pumps - one for CH and one for HW - both on the return side, feeding *into* the boiler. It still wants to go on the flow pipe near the boiler and before any other things that might restrict flow. OK, if I move a lot of stuff in the garage, it could go in the flow pipe very close to the boiler, with no intervening flow restrictions. Technically it would be *before* the pump inlet - since the water then goes right round the house to get to the pump, which is quite close to the boiler on the return side. Does that sound ok? It sounds OK, but you really need to read the installation manual, which I haven't. You become responsible for the installation, even any related parts done wrongly initially. Are there any technical - or even legal - reasons for not installing all the kit in the airing cupboard - some way from the boiler, but directly connected to it? If so, could I put the PRV near to the boiler, and the expansion vessel and filling loop somewhere else (preferably in the airing cupboard)? Filling and pressure gauge can go anywhere (but should be next to each other so you can see the pressure as you fill the system). Expansion vessel should ideally be as near to the pump inlet as possible (heating pump), as that will give longest pump life and lowest pump noise. You can put it anywhere, but then you will lose those benefits. In that case, it could go in the garage near the heating pump inlet which, as noted previously, is in the return pipe. PRV must be connected exactly as it says in the boiler installation manual or the system won't conform the manufacturer's safety requirements and would fail commissioning. OK, it makes sense to put it close to the boiler. what "commissioning" are you referring to? It would be me doing it! The commisioning instructions will be in the installation manual. Some of them will need to be repeated since you are changing the system design. Commissioning means testing to ensure the system is operating according to the manufacturer's design. It might including things like testing that you have sufficient pressure vessel capacity for the system volume at max running temperature. -- Andrew Gabriel [email address is not usable -- followup in the newsgroup] |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Underfloor heating as primary heating | UK diy | |||
Solid fuel boilers - continuous rise in primary circuit to the cylinder | UK diy | |||
Primary color off because open circuit CRT heater | Electronics Repair | |||
Level of pipes in primary HW circuit | UK diy | |||
Hot water heating - primary circuit | UK diy |