Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to uk.d-i-y
|
|||
|
|||
![]()
How far can you excavate below a cellar wall before underpinning
becomes necessary? I've had a local specialist firm round to quote for converting the cellar to dry space. I'd do the finishing - the work covers excavating, laying a floor, sump/pump, a beam to replace an existing dividing wall, and tanking with a cavity membrane. £6500 inc. for a 4.5 square space. Anyway, I'm waiting for them to get back to me on how high the space will be. At the moment it's 195cm to the flags. Just lifted a flag, and the cellar wall (which I'd describe only loosely as brick) goes down another 8cm. So that's 203cm, and I'd like a height of at least 210cm. They'd need to take out 10cm for the Kingspan, 10cm for the floor slab, and say 10cm for the hardcore/blinding (very clay rich soil)? So I reckon they'd need to go down about 40cm below the existing wall. Seems a lot to me without somehow containing the sideways force. This site: http://www.tracebasementsystems.co.u...ar-conversion/ says there's some flexibility, but no real guidance about how much and under what conditions. The quote from my firm says 'as far as existing foundations will allow without undermining them to retain as much headroom as possible when new floor is laid'. Any advice appreciated. -- Cheers, Rob |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Lowering basement floor | UK diy | |||
Lowering a concrete floor | UK diy | |||
winer cellar in house with no cellar | UK diy | |||
Drive & Lowering Road Curb | UK diy | |||
lowering kerb | UK diy |