UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 1,270
Default How long to leave new concrete before self levelling?

We have a sloping uneven floor, I've levelled it up as best poss with
concrete but would like to finish it off with self levelling compound.

I've had a read on concrete drying times and unsure how long to leave it?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
concrete base levelling dirt dibbler UK diy 2 May 8th 09 11:19 AM
Levelling concrete floor tvmo UK diy 40 July 1st 08 04:10 AM
Self-Levelling Concrete [email protected] UK diy 1 July 20th 05 11:00 AM
levelling a concrete floor in2minds UK diy 2 January 30th 05 11:54 AM


All times are GMT +1. The time now is 06:37 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"