Home |
Search |
Today's Posts |
![]() |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to uk.d-i-y
|
|||
|
|||
![]()
Good evening. This is my first posting to this esteemed newsgroup.
I'm in the process of renovating a chalet-type bungalow, in the course of which I need to fit some 7 x 2 floor joists(OK, they're 170 x 50, but I prefer to think in one system at a time). Half of my first floor has proper 7 x 2 joists; the other half, for some reason, only has 4 x 2 ceiling joists. Something to do with the history of the building, which had rooms added upstairs after it was built. I hadn't noticed this feature until I removed the chipboard floor, as the chappie had battened over them with 3 x 2s to make the floor levels match. Anyway, I digress. Half of my first floor is joisted with 4 x 2 at 400 (ish) mm centres. There is a ground floor brick internal wall dividing the space, and the span from this to the wall plates on either side of it is about 3.5 m. When installing my 50 x 170s, is there any significant advantage in running them alongside the existing 4 x 2s and bolting them to them, rather than running them independently between the 4 x 2s, and bolting them together where they meet over the brick internal wall? It might seem a no-brainer, except that the joists and the rafters of the sloping roof both come down to the wall plate, and don't always meet, which would in any case prevent all the new joists from touching the old ones. So I'm thinking of simply running the new (7 x 2) joists in the middle of the gaps between the old (4 x 2) joists, nailing or bolting the ends of the 7 x 2s together where they meet over the brick internal wall, and perhaps nogging them with 3 x 2 which I would then nail down into the old 4 x 2s where the noggins crossed them. I should add that the existing 4 x 2s have a tie-beam nailed above them, half way along their span, on either side of the internal brick wall. A long-winded way of asking a simple question, sorry. I've not done this before and it is pushing the envelope of my DIY ;-) If anyojne has any general comments or advice, I'd be pleasd to hear them. Regards Richard |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Floor joists | UK diy | |||
cable between floor joists | UK diy | |||
floor joists | UK diy | |||
Reinforcing floor joists | Home Repair | |||
Uneven floor joists....installing new floor covering...2 problems. | Home Repair |