UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 328
Default Central Heating Question .

I posted the other day about having got a first quote for new CH .It was £2750
for an A Class Condensing Combi-make as yet unknown- ,6 Barlo Rads and TRV's and
a digital timeswitch and room thermostat ....fitted to 15mm piping .

I got another quote today .For the boiler alone...a Worcester Bosch Greenstar
Junior 28i,plus hall thermostat with the existing piping to be flushed .£1800 .
I thought this a bit steep but maybe the flushing is expensive .

For the same boiler with 6 Purmo Rads, 6 Danfoss TRV's and 6 Chrome Valves and
Timer Hall thermostat. To be piped in microbore . This is £3200

The first guy said they would not fit the boiler to the existing system in case
of leaks in unknown places although he was sure other companies would do so .

Other than the connections to the manifold I know the only joins are where I
soldered chrome tails to a new rad in the bathroom recently .and all the Rad
valves are recently replaced .

Anyone got any helpful comments . Is fitting a new boiler to an existing (old)
microbore setup likely to cause any real problems.

I also noted that the second company have in their T+C a para that says "
allowance has been made in the price for any old fittings and materials and
these will be removed by the contractor " . I'm not quite sure if that means
that they are saying the price is lower because of the value of the old fittings
or if it is higher because they need to dispose of it .? .He certainly said
when he was here that they would take away the old boiler and rads . Unless
they have any scrap value I'm happy with that but if I get the complete system
I'd want the copper pipe and the copper cylinder as I know I can get something
for that .

Stuart




  #2   Report Post  
Posted to uk.d-i-y
external usenet poster
 
Posts: 1,283
Default Central Heating Question .


"Stuart" wrote

I got another quote today .For the boiler alone...a Worcester Bosch
Greenstar
Junior 28i,plus hall thermostat with the existing piping to be flushed
.£1800 .
I thought this a bit steep but maybe the flushing is expensive .



Yes, because it can be time consuming if done properly, power flushing tends
to be expensive (but plumbers inflate the price as well of course).


For the same boiler with 6 Purmo Rads, 6 Danfoss TRV's and 6 Chrome Valves
and
Timer Hall thermostat. To be piped in microbore . This is £3200


Depends on location of new boiler and amount of hassle associated. Don't
know much about microbore, but traditionalists tend not to like it due to
higher flow rates and associated noise.


The first guy said they would not fit the boiler to the existing system
in case
of leaks in unknown places although he was sure other companies would do
so .


If he is talking about converting the existing system from vented to sealed,
then this is a possibility.
Most here would say go sealed anyway and then look for/fix leaks.


Other than the connections to the manifold I know the only joins are where
I
soldered chrome tails to a new rad in the bathroom recently .and all the
Rad
valves are recently replaced .


If you have good access to all joints in the system then going sealed and
re-using the old piping shouldn't be a huge issue. Just be prepared for
extra cost if a drain down and leak fix operation is required.


Anyone got any helpful comments . Is fitting a new boiler to an existing
(old)
microbore setup likely to cause any real problems.


In addition to the above, I would suggest that the condition of the system
is all important.
If it has been well maintained with inhibitor added etc and there is no
history of serious sludge or blockage, then fitting a new boiler will be
much less of a gamble.


I also noted that the second company have in their T+C a para that says "
allowance has been made in the price for any old fittings and materials
and
these will be removed by the contractor " .


This means that they expect to take away all scrap and cash in the copper.
These will obviously be their standard terms. If you want them to do the
job, say that their costs are a little high by comparison to other quotes,
but you have more confidence in them and, if they will leave all copper
scrap, you will accept their price.

Hanging on to the scrap copper work is useful because you can inspect the
condition.
I had some major(ish) re-work done this year and kept the scrap for
examination. Showed up a significant partial blockage and led to a better
understanding of issues with vented sytems.


HTH

Phil


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Central Heating question Rob Walford UK diy 3 May 7th 06 12:33 PM
Central Heating question Rob Walford UK diy 2 May 7th 06 10:01 AM
Central Heating question MXH UK diy 2 February 20th 05 09:30 PM
Central Heating Question - Heating Loop Murdo MacKenzie UK diy 2 May 17th 04 02:42 PM
Central Heating Question Jackie UK diy 3 August 29th 03 10:29 PM


All times are GMT +1. The time now is 04:47 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"