Home |
Search |
Today's Posts |
|
UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
Building control in two stages - full plans / building notice
Can I submit full plans for just the shell of my extension, i.e.
foundations, slab, walls, windows, roof (I need these as 2 metres from public sewer), then do all the rest on a building notice. This would make the "full" plans simple enough for me to draw. Simon. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
To anyone sick of alt.hvac | Home Repair | |||
Building a remote control mower | Metalworking | |||
Making a ruin into something habitable. | UK diy | |||
Building Warrants - Buying Flat Without | UK diy | |||
Central Heating Install: Building Control system/procedures etc | UK diy |