Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
Follow up question on finishing bi-level basement
I have have concrete / half wood frame walls in my basement. The upper wood
portion is insullated and dry walled. I want to finish the lower, concrete portion now. I will put a 2x4 frame against the concrete and attach the sole plate with the nail gun. My question is: do i need to further anchor this frame? As it will not be going up to the ceiling, do I anchor a top plate to anything?? Jaxx |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
bi-level home and finishing basement | Home Repair | |||
jOne last finishing question for my bed | Woodworking | |||
this ought to get everybody fired up.... | Woodworking | |||
Finishing a basement | Home Repair | |||
Advice needed on new basement - sump hole higher than rest ofbasement | Home Repair |