Home |
Search |
Today's Posts |
![]() |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
We had a power outage last night. It was in the mid-80's and I'm sure
that most of us had our AC units just sitting there waiting to spin up as soon as the power came back on - I know I did. So how is that initial power requirement handled by the power company? Even in a relatively small outage like we had, the initial demand as everybody's AC units, cable boxes, lights, pool filters, fans, fridges & freezers, etc. all come on at the exact same moment must be huge. How does the power company soften the impact on their equipment? |
#2
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On 7/11/2011 1:55 PM, DerbyDad03 wrote:
We had a power outage last night. It was in the mid-80's and I'm sure that most of us had our AC units just sitting there waiting to spin up as soon as the power came back on - I know I did. So how is that initial power requirement handled by the power company? Even in a relatively small outage like we had, the initial demand as everybody's AC units, cable boxes, lights, pool filters, fans, fridges & freezers, etc. all come on at the exact same moment must be huge. How does the power company soften the impact on their equipment? Generally first by staging the return of any larger sections then that's what "spinning reserve" is for for the makeup. There will be some voltage sag and short term redistribution within the local grid as well. -- |
#3
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Jul 11, 5:21*pm, dpb wrote:
On 7/11/2011 1:55 PM, DerbyDad03 wrote: We had a power outage last night. It was in the mid-80's and I'm sure that most of us had our AC units just sitting there waiting to spin up as soon as the power came back on - I know I did. So how is that initial power requirement handled by the power company? Even in a relatively small outage like we had, the initial demand as everybody's AC units, cable boxes, lights, pool filters, fans, fridges & *freezers, etc. all come on at the exact same moment must be huge. How does the power company soften the impact on their equipment? Generally first by staging the return of any larger sections then that's what "spinning reserve" is for for the makeup. There will be some voltage sag and short term redistribution within the local grid as well. -- plus most ACs have a high current limit switch that opens for a moment when overloaded like trying to start after a outage |
#4
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Mon, 11 Jul 2011 14:47:50 -0700 (PDT), bob haller
wrote: On Jul 11, 5:21*pm, dpb wrote: On 7/11/2011 1:55 PM, DerbyDad03 wrote: We had a power outage last night. It was in the mid-80's and I'm sure that most of us had our AC units just sitting there waiting to spin up as soon as the power came back on - I know I did. So how is that initial power requirement handled by the power company? Even in a relatively small outage like we had, the initial demand as everybody's AC units, cable boxes, lights, pool filters, fans, fridges & *freezers, etc. all come on at the exact same moment must be huge. How does the power company soften the impact on their equipment? Generally first by staging the return of any larger sections then that's what "spinning reserve" is for for the makeup. There will be some voltage sag and short term redistribution within the local grid as well. -- plus most ACs have a high current limit switch that opens for a moment when overloaded like trying to start after a outage Most AC and refrigeration equipment have a delay that usefully takes up to 5 min or more after power is interrupted, allowing the pressure in the compressor to equalize. If the pressure is not equalized it is likely that the compressor will try and start, but instead draw a large current and trip whatever high current device there is in the system. It is not desirable not to use the high current limiting device as it can shorting the life of the compressor. |
#5
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Jul 12, 10:26*am, wrote:
On Mon, 11 Jul 2011 14:47:50 -0700 (PDT), bob haller wrote: On Jul 11, 5:21*pm, dpb wrote: On 7/11/2011 1:55 PM, DerbyDad03 wrote: We had a power outage last night. It was in the mid-80's and I'm sure that most of us had our AC units just sitting there waiting to spin up as soon as the power came back on - I know I did. So how is that initial power requirement handled by the power company? Even in a relatively small outage like we had, the initial demand as everybody's AC units, cable boxes, lights, pool filters, fans, fridges & *freezers, etc. all come on at the exact same moment must be huge. How does the power company soften the impact on their equipment? Generally first by staging the return of any larger sections then that's what "spinning reserve" is for for the makeup. There will be some voltage sag and short term redistribution within the local grid as well. -- plus most ACs have a high current limit switch that opens for a moment when overloaded like trying to start after a outage Most AC and refrigeration equipment have a delay that usefully takes up to 5 min or more after power is interrupted, allowing the pressure in the compressor to equalize. If the pressure is not equalized it is likely that the compressor will try and start, but instead draw a large current and trip whatever high current device there is in the system. It is not desirable not to use the high current limiting device as it can shorting the life of the compressor.- Hide quoted text - - Show quoted text - I believe he is refering to a longer delay without power. In which case the compressor will try to start immediately. |
#6
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On 7/11/2011 4:21 PM, dpb wrote:
On 7/11/2011 1:55 PM, DerbyDad03 wrote: We had a power outage last night. It was in the mid-80's and I'm sure that most of us had our AC units just sitting there waiting to spin up as soon as the power came back on - I know I did. So how is that initial power requirement handled by the power company? Even in a relatively small outage like we had, the initial demand as everybody's AC units, cable boxes, lights, pool filters, fans, fridges & freezers, etc. all come on at the exact same moment must be huge. How does the power company soften the impact on their equipment? Generally first by staging the return of any larger sections then that's what "spinning reserve" is for for the makeup. Sounds good for a really large area. Most power restores are probably not much power relative to the capacity of the grid. Motors and incandescents briefly draw about 6x normal current when they are turned on. There will be some voltage sag and short term redistribution within the local grid as well. |
#7
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Jul 12, 11:13*am, bud-- wrote:
On 7/11/2011 4:21 PM, dpb wrote: On 7/11/2011 1:55 PM, DerbyDad03 wrote: We had a power outage last night. It was in the mid-80's and I'm sure that most of us had our AC units just sitting there waiting to spin up as soon as the power came back on - I know I did. So how is that initial power requirement handled by the power company? Even in a relatively small outage like we had, the initial demand as everybody's AC units, cable boxes, lights, pool filters, fans, fridges & freezers, etc. all come on at the exact same moment must be huge. How does the power company soften the impact on their equipment? Generally first by staging the return of any larger sections then that's what "spinning reserve" is for for the makeup. Sounds good for a really large area. Most power restores are probably not much power relative to the capacity of the grid. Motors and incandescents briefly draw about 6x normal current when they are turned on. There will be some voltage sag and short term redistribution within the local grid as well.- Hide quoted text - - Show quoted text -- Hide quoted text - - Show quoted text - I usually notice a fair amount of flickering when our local elect co restores power, as other sections are added onlne I suppose. |
#8
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
I've seen delay timers on central AC, and some commercial
AC. Never seen delay timers on refrigeration equipment. -- Christopher A. Young Learn more about Jesus www.lds.org .. wrote in message ... Most AC and refrigeration equipment have a delay that usefully takes up to 5 min or more after power is interrupted, allowing the pressure in the compressor to equalize. If the pressure is not equalized it is likely that the compressor will try and start, but instead draw a large current and trip whatever high current device there is in the system. It is not desirable not to use the high current limiting device as it can shorting the life of the compressor. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Toshiba TV won't turn on after power outage | Electronics Repair | |||
Strange observations during a power outage | Home Repair | |||
Partial power outage? | Home Repair | |||
After Power Outage | Electronics Repair | |||
Power outage question | Electronics Repair |