I want to make a block wall that is of various heights. This will be an
undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog at http://cabgbypasssurgery.com |
#2
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Steve B wrote:
I want to make a block wall that is of various heights. This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog at http://cabgbypasssurgery.com You might want to ask your town building inspector about local code |
#3
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On 8/9/2010 10:07 AM, LouB wrote:
Steve B wrote: I want to make a block wall that is of various heights. This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog at http://cabgbypasssurgery.com You might want to ask your town building inspector about local code Just curious, what makes you think that Steve B even lives in a town? And if he does, what makes you so sure that the town even has a code and/or a building inspector? I know that the town that I live in has neither! Don |
#4
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() "Steve B" wrote in message ... I want to make a block wall that is of various heights. This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog at http://cabgbypasssurgery.com Steve, The concrete needs to set and maybe cure before you start your wall. 24-48 hours drying time is plenty for a wall 2-3 blocks high. Anything taller should cure for at least a week before you start building. Or at least before you get a lot of weight on it. Then the blocks are set in a bed of mortar. Minor imperfections can be made up with more or less mortar when the first course is set. Usually a mason will dry stack the corners or a wide expanse of a straight run 2-3 blocks high, stretch a string and identify any potential high spots in the footer that must be dealt with. Not recommended but I have seen mortar beds or parts of mortar beds as deep as an inch for small sections to make up a boo-boo. Trying to set the first course into the wet concrete is more trouble than it is worth. It will also be very hard to do properly. -- Colbyt Please come visit http://www.househomerepair.com |
#5
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
IGot2P wrote:
On 8/9/2010 10:07 AM, LouB wrote: Steve B wrote: I want to make a block wall that is of various heights. This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog at http://cabgbypasssurgery.com You might want to ask your town building inspector about local code Just curious, what makes you think that Steve B even lives in a town? And if he does, what makes you so sure that the town even has a code and/or a building inspector? I know that the town that I live in has neither! Don What makes you think he doesn't? Most folks do live near civilization:-)) |
#6
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Aug 9, 3:27*pm, "Steve B" wrote:
I want to make a block wall that is of various heights. *This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? *I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog athttp://cabgbypasssurgery.com The easiest way to get you concrete level is to hire a vibrating poker. There are high frequency electric ones available that are good for the job. Hammer a few stakes in the bottom of the trench at the side of the hole and put yourself level marks on them. A laser level is the tool for this. Put the marks above your intended finished level so that when the concrete is in place you can check it's level. As the concrete is poured, stick the poker in, the concrete will run like water. Work up and down yur trench with the poker.Check your marks on the stakes with a ruler to the surface of the concrete. Any high spots, stick the poker in and they will be gone. Your level marks need to be a couple of feet above ypur intended level of concrete, if you try to put them on your level, by sod's law they will be immersed in concrete & you won't be able to see them. It's best to lay the concrete in cool weather if possible, it takes longer to go off & you have more time to mess with it. The final set will stronger too. Just break the stakes off when the concrete has set, just make sure you don't use anything too thick. |
#7
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Aug 9, 7:19*pm, harry wrote:
On Aug 9, 3:27*pm, "Steve B" wrote: I want to make a block wall that is of various heights. *This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? *I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength.. My main question is getting the footer and first course in. Thanks. Steve visit my blog athttp://cabgbypasssurgery.com The easiest way to get you concrete level is to hire a vibrating poker. *There are high frequency electric ones available that are good for the job. Hammer a few stakes in the bottom of the trench at the side of the hole and put yourself level marks on them. A laser level is the tool for this. *Put the marks above your intended finished level so that when the concrete is in place you can check it's level. As the concrete is poured, stick the poker in, the concrete will run like water. *Work up and down yur trench with the poker.Check your marks on the stakes with a ruler to the surface of the concrete. Any high spots, stick the poker in and they will be gone. Your level marks need to be a couple of feet above ypur intended level of concrete, if you try to put them on your level, by sod's law they will be immersed in concrete & you won't be able to see them. It's best to lay the concrete in cool weather if possible, it takes longer to go off & you have more time to mess with it. The final set will stronger too. Just break the stakes off when the concrete has set, just make sure you don't use anything too thick.- Hide quoted text - - Show quoted text - BTW, if it is a long wall, it need to have movement joints every 20 or so. It will break in an unsightly manner if you don't do this. |
#8
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Aug 9, 2:22*pm, harry wrote:
On Aug 9, 7:19*pm, harry wrote: On Aug 9, 3:27*pm, "Steve B" wrote: I want to make a block wall that is of various heights. *This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? *I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog athttp://cabgbypasssurgery.com The easiest way to get you concrete level is to hire a vibrating poker. *There are high frequency electric ones available that are good for the job. Hammer a few stakes in the bottom of the trench at the side of the hole and put yourself level marks on them. A laser level is the tool for this. *Put the marks above your intended finished level so that when the concrete is in place you can check it's level. As the concrete is poured, stick the poker in, the concrete will run like water. *Work up and down yur trench with the poker.Check your marks on the stakes with a ruler to the surface of the concrete. Any high spots, stick the poker in and they will be gone. Your level marks need to be a couple of feet above ypur intended level of concrete, if you try to put them on your level, by sod's law they will be immersed in concrete & you won't be able to see them. It's best to lay the concrete in cool weather if possible, it takes longer to go off & you have more time to mess with it. The final set will stronger too. Just break the stakes off when the concrete has set, just make sure you don't use anything too thick.- Hide quoted text - - Show quoted text - BTW, if it is a long wall, it need to have movement joints every 20 or so. It will break in an unsightly manner if you don't do this.- Hide quoted text - - Show quoted text - Every 20 *what* or so? :-) |
#9
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() "harry" wrote in message ... On Aug 9, 3:27 pm, "Steve B" wrote: I want to make a block wall that is of various heights. This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog athttp://cabgbypasssurgery.com The easiest way to get you concrete level is to hire a vibrating poker. There are high frequency electric ones available that are good for the job. Yes, use a vibrator to consolidate and level the concrete within your forms. DO NOT use the vibrator to move the concrete along. Use your shovel! Moving concrete with a vibrator segregates the materials and weakens the footing (or whatever your pouring). Ivan Vegvary |
#10
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Mon, 9 Aug 2010 17:06:53 -0500, "James" no
wrote: Look at the response and info from Colbyt. Does anyone think that the OP would get this much information from the local building inspector (even if there is one ??) No. James My local permit office will give me a detailed drawing for the footer. Watch out for that property boundary line.... |
#11
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Look at the response and info from Colbyt. Does anyone think that the OP
would get this much information from the local building inspector (even if there is one ??) No. James |
#12
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Steve B wrote:
I want to make a block wall that is of various heights. This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog at http://cabgbypasssurgery.com If you aren't gonna form up the footer to pour it, your two choices are to level it by eye measuring down from a string, or pound a stake at the (alternating) edges of trench every couple of feet, and use the tops of the stakes as your reference. Back in stone age, we used scrap cedar siding ripped down to 3/4 square profile for the stakes. We always waited several days for footer to cure before laying block on it. You shove the rebar J-hooks into the pour as you go along, of course, holding them vertical however is painless. -- aem sends... |
#13
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() "IGot2P" wrote in message ... On 8/9/2010 10:07 AM, LouB wrote: Steve B wrote: I want to make a block wall that is of various heights. This will be an undulating wall covered with stucco, a southwest type with wrought iron, wood railing, and pipe inserts. When making a footer, do you get your string line right, then pour into the trench, then wait until the concrete is set enough to hold up the weight of the blocks so it doesn't settle? I would put rebar, as well as every six feet or so vertically, and then grout those cells for vertical strength. My main question is getting the footer and first course in. Thanks. Steve visit my blog at http://cabgbypasssurgery.com You might want to ask your town building inspector about local code Just curious, what makes you think that Steve B even lives in a town? And if he does, what makes you so sure that the town even has a code and/or a building inspector? I know that the town that I live in has neither! Don I should have been more specific, but then, the answer I got had nothing to do with the question, did it? You are right. I live in an AG 1 zone. We get to pretty much do anything we want, except if it involves electricity, plumbing, or other specific things. To reply to such a question with a neener neener neener answer about building inspector reflects that the person answering merely knows nothing about the question on construction, and has no experience about anything outside their little portion of the fishbowl/universe. FYI, I do live in a township, and I must apply for permits for only certain things. For all the rest, we just Git r' done. How to do things, and where to get permits are two entirely different questions. Steve visit my blog at http://cabgbypasssurgery.com |
#14
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() "James" no wrote in message ... Look at the response and info from Colbyt. Does anyone think that the OP would get this much information from the local building inspector (even if there is one ??) No. James It must be a bitch to live in such paranoia. That's why I chose a rural ranch at the very end of the road. We do what we want, and don't HAVE to tell anyone. Steve visit my blog at http://cabgbypasssurgery.com |
#15
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Aug 9, 2:33*pm, Oren wrote:
On Mon, 9 Aug 2010 17:06:53 -0500, "James" no wrote: Look at the response and info from Colbyt. *Does anyone think that the OP would get this much information from the local building inspector *(even if there is one ??) No. James My local permit office will give me a detailed drawing for the footer. Watch out for that property boundary line.... And mine re-drew the plans I did for my porch roof repair. Harry K |
#16
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Harry K wrote:
On Aug 9, 2:33*pm, Oren wrote: On Mon, 9 Aug 2010 17:06:53 -0500, "James" no wrote: Look at the response and info from Colbyt. *Does anyone think that the OP would get this much information from the local building inspector *(even if there is one ??) No. James My local permit office will give me a detailed drawing for the footer. Watch out for that property boundary line.... And mine re-drew the plans I did for my porch roof repair. I called one 30 years ago. I'd already talked to the contractor & he laid out how he would install a septic system. He just eyeballed the property and went with seat-of-the-pants engineering.[and 40 years of experience digging holes in the town] The inspector came out and began his schpiel about perk tests, etc. I asked him if the contractor would do those or should I, 'Joe Blow will be doing the work'. It was like I'd just kicked him in the nuts. 'Oh, he's doing the work? He'll just do as he pleases anyway. . . Here's your permit.' I'm sure there are good permit officers out there-- but there is too much politics and too little merit hiring in town government to rely on it. Jim |
#17
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
On Tue, 10 Aug 2010 06:57:43 -0400, Jim Elbrecht
wrote: Harry K wrote: On Aug 9, 2:33*pm, Oren wrote: On Mon, 9 Aug 2010 17:06:53 -0500, "James" no wrote: Look at the response and info from Colbyt. *Does anyone think that the OP would get this much information from the local building inspector *(even if there is one ??) No. James My local permit office will give me a detailed drawing for the footer. Watch out for that property boundary line.... And mine re-drew the plans I did for my porch roof repair. I called one 30 years ago. I'd already talked to the contractor & he laid out how he would install a septic system. He just eyeballed the property and went with seat-of-the-pants engineering.[and 40 years of experience digging holes in the town] The inspector came out and began his schpiel about perk tests, etc. I asked him if the contractor would do those or should I, 'Joe Blow will be doing the work'. It was like I'd just kicked him in the nuts. 'Oh, he's doing the work? He'll just do as he pleases anyway. . . Here's your permit.' I'm sure there are good permit officers out there-- but there is too much politics and too little merit hiring in town government to rely on it. Jim My friend was telling me about an inspector. The guy would always find something wrong, regardless. Oren: Find out what his days off are and call the inspection then, a more friendly inspector. Bubba: That works! |
#18
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Jim Elbrecht wrote:
Harry K wrote: On Aug 9, 2:33 pm, Oren wrote: On Mon, 9 Aug 2010 17:06:53 -0500, "James" no wrote: Look at the response and info from Colbyt. Does anyone think that the OP would get this much information from the local building inspector (even if there is one ??) No. James My local permit office will give me a detailed drawing for the footer. Watch out for that property boundary line.... And mine re-drew the plans I did for my porch roof repair. I called one 30 years ago. I'd already talked to the contractor & he laid out how he would install a septic system. He just eyeballed the property and went with seat-of-the-pants engineering.[and 40 years of experience digging holes in the town] The inspector came out and began his schpiel about perk tests, etc. I asked him if the contractor would do those or should I, 'Joe Blow will be doing the work'. It was like I'd just kicked him in the nuts. 'Oh, he's doing the work? He'll just do as he pleases anyway. . . Here's your permit.' I'm sure there are good permit officers out there-- but there is too much politics and too little merit hiring in town government to rely on it. Jim Maybe that is his way of admitting that "joe blow" knows 100 times more than he does about septic systems? How did/does that septic work? Did Joe Blow really know his **** and others too? Or was Joe Blow full of hot air and leaking drain fields? |
#19
![]()
Posted to alt.home.repair
|
|||
|
|||
![]() "Tony" wrote Maybe that is his way of admitting that "joe blow" knows 100 times more than he does about septic systems? How did/does that septic work? Did Joe Blow really know his **** and others too? Or was Joe Blow full of hot air and leaking drain fields? Isn't that what they're designed to do? Steve visit my blog at http://cabgbypasssurgery.com |
#20
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Steve B wrote:
"Tony" wrote Maybe that is his way of admitting that "joe blow" knows 100 times more than he does about septic systems? How did/does that septic work? Did Joe Blow really know his **** and others too? Or was Joe Blow full of hot air and leaking drain fields? Isn't that what they're designed to do? Well I meant they shouldn't be any liquid you can see or smell. They should be *leaching* liquid into the ground and not above it. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Perimeter drain on top of footer? | Home Repair | |||
rebar size for footer? | Home Repair | |||
How to fill hole in brick/block wall? Last block at top? | UK diy | |||
Basic footer question | Home Repair | |||
Fixing a wall plate on a dense concrete block wall | UK diy |