Home |
Search |
Today's Posts |
![]() |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]()
Posted to alt.home.repair
|
|||
|
|||
![]()
Hello,
Lots of water in the basement due to the NE floods. RI got creamed. I ripped down the sheetrock, took up the subfloor and laminate. All in a dumpster now. Fans and dehumidifier are running. I am going to rebuild the basement. How long do I need to wait until I can begin rebuilding? I was thinking at least a few months to ensure everything is really dry. (wood studs down there) Thanks for your time. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Condo Flood Insurance Rates - high risk flood zone | Home Ownership | |||
Flood Friendly Basement Flooring | Home Repair | |||
Flood Friendly Basement F | Home Repair | |||
Advice needed on new basement - sump hole higher than rest of basement | Home Ownership |