Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? |
#2
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
ria wrote:
.... (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? You're asking the wrong folks... -- |
#3
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Jan 28, 8:15*pm, dpb wrote:
ria wrote: ... (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? You're asking the wrong folks... -- Post your question on: http://groups.google.com.ng/group/mi...derated/topics Someone there is bound to have something to say pertinent to your question. |
#4
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Jan 28, 8:14*pm, "ria" wrote:
Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of *July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? What is his"new " item billed 200$ for. You know if its legit and he did extra work, if he did pay him he is doing book keeping now since he cant do roofing its to cold out. If its bs dont pay, if it isnt pay. |
#5
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
ria wrote:
Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? (1) Any number of things. He may have had material delivered from his supplier directly to the site and that material was overlooked in the original invoice. Maybe his employee turned in a time card late. You should ask him. (2) As to why it took so long, ask him. But your possible actions seem to be: If the charge is legit, pay it. If not, send a copy of the bill back with a hand-written note: "I suppose a blow-job is out of the question?" |
#6
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
"ria" wrote in message
... Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? To timid to pick up the phone and call to find out ???Sheesh.... |
#7
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Fri, 29 Jan 2010 04:14:10 +0200, "ria" wrote Re
contractor sends a bill 7 months later: This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? Try news:misc.legal.moderated -- Work is the curse of the drinking class. |
#8
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? *Over here in this part of the country we have some of those new contraptions called telephones. If you send me the information I could call the company and ask them. |
#9
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
ria wrote:
Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? You had a contract for a specfied sum. You paid it and have an statement from the contractor acknowledging so. Did you sign a change order during the course of the job? If so, pay it; if not, send the bill back to the contractor along with a copy of the "PAID" statement and a note saying you have already paid. -- dadiOH ____________________________ dadiOH's dandies v3.06... ....a help file of info about MP3s, recording from LP/cassette and tips & tricks on this and that. Get it at http://mysite.verizon.net/xico |
#10
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Jan 29, 5:28*am, "John Grabowski" wrote:
Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of *July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? *Over here in this part of the country we have some of those new contraptions called telephones. *If you send me the information I could call the company and ask them.- Hide quoted text - - Show quoted text - They just want to see if they can get out of paying because its 7 months late. They know what the legitimate bill is for |
#11
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
ria wrote:
Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? The contractor apparently doesn't know the difference between an invoice and a statement;-) In any event, tell the responsible party to pick up the phone and call they guy. You sound like you're cranking up for a big time legal fight when the problem most likely can be easily resolved with the contractor updating his records... |
#12
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Fri, 29 Jan 2010 07:18:45 -0500, "dadiOH"
wrote Re contractor sends a bill 7 months later: This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? You had a contract for a specfied sum. You paid it and have an statement from the contractor acknowledging so. Did you sign a change order during the course of the job? If so, pay it; if not, send the bill back to the contractor along with a copy of the "PAID" statement and a note saying you have already paid. Good advice. -- Work is the curse of the drinking class. |
#13
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Jan 28, 9:14*pm, "ria" wrote:
(1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? A legitimate charge for product or services received that was not paid for previously. (2) Why did it take 7 months to present this new invoice? It's time to report to the IRS. They came up short. They discovered that they forgot to bill you for something. Obviously, the charge is legitimate or your post would have been worded much differently. I would have expected something like: "I paid the roofers back in June and now I'm getting this bill with a bogus charge for $700 worth of masking tape and animal crackers!" Instead, you make no mention of what the charge is for. Admit it; it's something the roofers provided, but wasn't on the original bill. You caught the mistake, but kept your mouth closed figuring you'd get something for nothing. The stand-up honest American thing to do here is PAY THE BILL. However, I would call them and express my concern and displeasure over the heavy-handed use of the PAST DUE stamp on the bill... how this is the first time I've heard from them in 7 months, and how an oversight on their part should not result in a black mark on my credit rating. |
#14
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Jan 29, 9:52*am, wrote:
On Jan 28, 9:14*pm, "ria" wrote: (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? A legitimate charge for product or services received that was not paid for previously. (2) Why did it take 7 months to present this new invoice? It's time to report to the IRS. They came up short. They discovered that they forgot to bill you for something. Obviously, the charge is legitimate or your post would have been worded much differently. I would have expected something like: "I paid the roofers back in June and now I'm getting this bill with a bogus charge for $700 worth of masking tape and animal crackers!" Instead, you make no mention of what the charge is for. Admit it; it's something the roofers provided, but wasn't on the original bill. You caught the mistake, but kept your mouth closed figuring you'd get something for nothing. The stand-up honest American thing to do here is PAY THE BILL. However, I would call them and express my concern and displeasure over the heavy-handed use of the PAST DUE stamp on the bill... how this is the first time I've heard from them in 7 months, and how an oversight on their part should not result in a black mark on my credit rating. "The stand-up honest American thing to do here is PAY THE BILL." I agree with everything you've said, except for the wording. How is the use of the word "American" relevant to that statement? |
#15
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Jan 28, 9:14*pm, "ria" wrote:
Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of *July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? I always write paid in full on the check when I pay for a job like this. That overrides the agreement on the contracted price. Once I had a dispute about cost sent the guy a check and he marked out the paid in full and cashed the check. He then took me to small claims court for what he saw as the rest of his money. He made his claim. I showed the judge the canceled check where he altered it and the judge found in my favor. Jimmie |
#16
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
"ria" wrote in message ... Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? Do you have a telephone? Call them and ask THEM. You'll get the real answer faster. Steve |
#17
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
"Caesar Romano" wrote in message ... On Fri, 29 Jan 2010 07:18:45 -0500, "dadiOH" wrote Re contractor sends a bill 7 months later: This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? You had a contract for a specfied sum. You paid it and have an statement from the contractor acknowledging so. Did you sign a change order during the course of the job? If so, pay it; if not, send the bill back to the contractor along with a copy of the "PAID" statement and a note saying you have already paid. Good advice. -- Work is the curse of the drinking class. It's not advice. It is the legal answer to the question. Steve |
#18
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
wrote in message ... On Jan 28, 9:14 pm, "ria" wrote: (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? A legitimate charge for product or services received that was not paid for previously. (2) Why did it take 7 months to present this new invoice? It's time to report to the IRS. They came up short. They discovered that they forgot to bill you for something. Obviously, the charge is legitimate or your post would have been worded much differently. I would have expected something like: "I paid the roofers back in June and now I'm getting this bill with a bogus charge for $700 worth of masking tape and animal crackers!" Instead, you make no mention of what the charge is for. Admit it; it's something the roofers provided, but wasn't on the original bill. You caught the mistake, but kept your mouth closed figuring you'd get something for nothing. The stand-up honest American thing to do here is PAY THE BILL. However, I would call them and express my concern and displeasure over the heavy-handed use of the PAST DUE stamp on the bill... how this is the first time I've heard from them in 7 months, and how an oversight on their part should not result in a black mark on my credit rating. reply: How do you know all this stuff without any information? Do you have ESP? Are you a psychic, or just psychotic? Steve |
#19
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
In article , JIMMIE wrote:
I always write paid in full on the check when I pay for a job like this. That overrides the agreement on the contracted price. No, it doesn't. Once I had a dispute about cost sent the guy a check and he marked out the paid in full and cashed the check. He then took me to small claims court for what he saw as the rest of his money. He made his claim. I showed the judge the canceled check where he altered it and the judge found in my favor. More likely because he altered the check... duh. |
#20
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Fri, 29 Jan 2010 04:14:10 +0200, "ria" wrote:
Last summer, a local roofing company, did a job for my extended family. They proceeded on the job, after submitting a signed contract and had appropriate city permits filed. Half of the contract amount was paid before the start of the job and the agreement was to pay the balance upon completion and passing inspection. End of July, 2009 the final payment was made and contractor sent an invoice dated 7/31/2009 showing zero (0) balance and a large stamped text PAID (stamped sideways) over the body of the invoice. Now fast forward to January 27, 2010 as contractor sends a new Certified US Mail with another invoice claiming "Serious Past Due Account" and they show a balance of few hundred on this invoice which is also dated 7/31/2009. This new invoice shows a new item being added to the original invoice with the resulting new balance. This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? Even if it was for a real charge that he forgot....you had a contract for a certain price. You can't be charged more if you didn't agree to it. If it were me, bas3ed on everything you stated (assuming it's true)...I wouldn't pay. **** http://www.soundclick.com/bands/defa...?bandID=789610 http://www.reviewmymusicnow.com |
#21
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
"hr(bob) " wrote in message ... On Jan 28, 8:15 pm, dpb wrote: ria wrote: ... (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? You're asking the wrong folks... -- Post your question on: http://groups.google.com.ng/group/mi...derated/topics Someone there is bound to have something to say pertinent to your question. Probably tell you to use common sense and contact the contractor telling them you have proof of "payment in full", instead of trying to get "free" so-called legal advice from Usenet. |
#22
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
"Steve B" wrote in message ... "Caesar Romano" wrote in message ... On Fri, 29 Jan 2010 07:18:45 -0500, "dadiOH" wrote Re contractor sends a bill 7 months later: This latest invoice was never presented to the family and has never surfaced until now, 7 months later. (1) What makes the contractors new bill legitimate over the previous Zero Balance invoice? (2) Why did it take 7 months to present this new invoice? You had a contract for a specfied sum. You paid it and have an statement from the contractor acknowledging so. Did you sign a change order during the course of the job? If so, pay it; if not, send the bill back to the contractor along with a copy of the "PAID" statement and a note saying you have already paid. Good advice. -- Work is the curse of the drinking class. It's not advice. It is the legal answer to the question. Sheesh, like only the contractor could mark "PAID" across an invoice. Proof of payment is the only way to show proof of payment. |
#23
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
DerbyDad03, now that you have been properly chastised, we can both do the
"American" thing and call a truce and go on to bigger and better things. OK with you, my friend ?? James |
#24
Posted to alt.home.repair
|
|||
|
|||
contractor sends a bill 7 months later
On Jan 30, 11:55*am, "James" wrote:
DerbyDad03, *now that you have been properly chastised, we can both do the "American" thing and call a truce and go on to bigger and better things. OK *with you, my friend ?? James That's an interesting way to word it. Call me wrong once again and then request a truce. OK, let's do it your way: Even though I was *improperly* chastised, I'll grant your request for a truce. Moving on... |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Logitech's Harmony sends different signals with same button | Electronics Repair | |||
Bathroom: architect versus contractor? which contractor? | Home Repair | |||
SOCKPUPPET ARMY SENDS EMAIL DEATH THREATS TO CHRIST: THE TIME OF CRUCIFIXION DRAWS NEAR!! | Home Repair | |||
MOEPED3 sends a Happy New Year to rcm | Metalworking |