Default contractor sends a bill 7 months later

Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero Balance
invoice?
(2) Why did it take 7 months to present this new invoice?





  #2   Report Post  
Posted to alt.home.repair
dpb dpb is offline
external usenet poster
 
Posts: 12,595
Default contractor sends a bill 7 months later

ria wrote:
....

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?


You're asking the wrong folks...

--
  #3   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 3,236
Default contractor sends a bill 7 months later

On Jan 28, 8:15*pm, dpb wrote:
ria wrote:

...

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?


You're asking the wrong folks...

--


Post your question on:

http://groups.google.com.ng/group/mi...derated/topics

Someone there is bound to have something to say pertinent to your
question.
  #4   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 4,926
Default contractor sends a bill 7 months later

On Jan 28, 8:14*pm, "ria" wrote:
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of *July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero Balance
invoice?
(2) Why did it take 7 months to present this new invoice?


What is his"new " item billed 200$ for. You know if its legit and he
did extra work, if he did pay him he is doing book keeping now since
he cant do roofing its to cold out. If its bs dont pay, if it isnt
pay.
  #5   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 11,538
Default contractor sends a bill 7 months later

ria wrote:
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which
is also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?


(1) Any number of things. He may have had material delivered from his
supplier directly to the site and that material was overlooked in the
original invoice. Maybe his employee turned in a time card late. You should
ask him.

(2) As to why it took so long, ask him.

But your possible actions seem to be:

If the charge is legit, pay it.

If not, send a copy of the bill back with a hand-written note: "I suppose a
blow-job is out of the question?"




  #6   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 959
Default contractor sends a bill 7 months later

"ria" wrote in message
...
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero
Balance invoice?
(2) Why did it take 7 months to present this new invoice?






To timid to pick up the phone and call to find out ???Sheesh....

  #7   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 696
Default contractor sends a bill 7 months later

On Fri, 29 Jan 2010 04:14:10 +0200, "ria" wrote Re
contractor sends a bill 7 months later:

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero Balance
invoice?
(2) Why did it take 7 months to present this new invoice?


Try news:misc.legal.moderated
--
Work is the curse of the drinking class.
  #8   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,934
Default contractor sends a bill 7 months later

Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero
Balance invoice?
(2) Why did it take 7 months to present this new invoice?



*Over here in this part of the country we have some of those new
contraptions called telephones. If you send me the information I could call
the company and ask them.

  #9   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 3,848
Default contractor sends a bill 7 months later

ria wrote:
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which
is also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?


You had a contract for a specfied sum. You paid it and have an statement
from the contractor acknowledging so. Did you sign a change order during
the course of the job? If so, pay it; if not, send the bill back to the
contractor along with a copy of the "PAID" statement and a note saying you
have already paid.

--

dadiOH
____________________________

dadiOH's dandies v3.06...
....a help file of info about MP3s, recording from
LP/cassette and tips & tricks on this and that.
Get it at http://mysite.verizon.net/xico



  #10   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 4,926
Default contractor sends a bill 7 months later

On Jan 29, 5:28*am, "John Grabowski" wrote:
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.


Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.


End of *July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.


Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.


This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.


(1) What makes the contractors new bill legitimate over the previous Zero
Balance invoice?
(2) Why did it take 7 months to present this new invoice?


*Over here in this part of the country we have some of those new
contraptions called telephones. *If you send me the information I could call
the company and ask them.- Hide quoted text -

- Show quoted text -


They just want to see if they can get out of paying because its 7
months late. They know what the legitimate bill is for


  #11   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 4
Default contractor sends a bill 7 months later

ria wrote:
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?



The contractor apparently doesn't know the difference between an invoice
and a statement;-)

In any event, tell the responsible party to pick up the phone and call
they guy. You sound like you're cranking up for a big time legal fight
when the problem most likely can be easily resolved with the contractor
updating his records...
  #12   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 696
Default contractor sends a bill 7 months later

On Fri, 29 Jan 2010 07:18:45 -0500, "dadiOH"
wrote Re contractor sends a bill 7 months later:

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?


You had a contract for a specfied sum. You paid it and have an statement
from the contractor acknowledging so. Did you sign a change order during
the course of the job? If so, pay it; if not, send the bill back to the
contractor along with a copy of the "PAID" statement and a note saying you
have already paid.


Good advice.
--
Work is the curse of the drinking class.
  #13   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 625
Default contractor sends a bill 7 months later

On Jan 28, 9:14*pm, "ria" wrote:
(1) What makes the contractors new bill legitimate over the previous Zero Balance
invoice?


A legitimate charge for product or services received that was not paid
for previously.

(2) Why did it take 7 months to present this new invoice?


It's time to report to the IRS. They came up short. They discovered
that they forgot to bill you for something.

Obviously, the charge is legitimate or your post would have been
worded much differently. I would have expected something like:

"I paid the roofers back in June and now I'm getting this bill with a
bogus charge for $700 worth of masking tape and animal crackers!"

Instead, you make no mention of what the charge is for.

Admit it; it's something the roofers provided, but wasn't on the
original bill. You caught the mistake, but kept your mouth closed
figuring you'd get something for nothing.

The stand-up honest American thing to do here is PAY THE BILL.

However, I would call them and express my concern and displeasure over
the heavy-handed use of the PAST DUE stamp on the bill... how this is
the first time I've heard from them in 7 months, and how an oversight
on their part should not result in a black mark on my credit rating.
  #14   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 14,845
Default contractor sends a bill 7 months later

On Jan 29, 9:52*am, wrote:
On Jan 28, 9:14*pm, "ria" wrote:

(1) What makes the contractors new bill legitimate over the previous Zero Balance
invoice?


A legitimate charge for product or services received that was not paid
for previously.

(2) Why did it take 7 months to present this new invoice?


It's time to report to the IRS. They came up short. They discovered
that they forgot to bill you for something.

Obviously, the charge is legitimate or your post would have been
worded much differently. I would have expected something like:

"I paid the roofers back in June and now I'm getting this bill with a
bogus charge for $700 worth of masking tape and animal crackers!"

Instead, you make no mention of what the charge is for.

Admit it; it's something the roofers provided, but wasn't on the
original bill. You caught the mistake, but kept your mouth closed
figuring you'd get something for nothing.

The stand-up honest American thing to do here is PAY THE BILL.

However, I would call them and express my concern and displeasure over
the heavy-handed use of the PAST DUE stamp on the bill... how this is
the first time I've heard from them in 7 months, and how an oversight
on their part should not result in a black mark on my credit rating.


"The stand-up honest American thing to do here is PAY THE BILL."

I agree with everything you've said, except for the wording. How is
the use of the word "American" relevant to that statement?
  #15   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,417
Default contractor sends a bill 7 months later

On Jan 28, 9:14*pm, "ria" wrote:
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of *July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero Balance
invoice?
(2) Why did it take 7 months to present this new invoice?


I always write paid in full on the check when I pay for a job like
this. That overrides the agreement on the contracted price. Once I
had a dispute about cost sent the guy a check and he marked out the
paid in full and cashed the check. He then took me to small claims
court for what he saw as the rest of his money. He made his claim. I
showed the judge the canceled check where he altered it and the judge
found in my favor.

Jimmie


  #16   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 511
Default contractor sends a bill 7 months later


"ria" wrote in message
...
Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero
Balance invoice?
(2) Why did it take 7 months to present this new invoice?


Do you have a telephone? Call them and ask THEM. You'll get the real
answer faster.

Steve


  #17   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 511
Default contractor sends a bill 7 months later


"Caesar Romano" wrote in message
...
On Fri, 29 Jan 2010 07:18:45 -0500, "dadiOH"
wrote Re contractor sends a bill 7 months later:

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?


You had a contract for a specfied sum. You paid it and have an statement
from the contractor acknowledging so. Did you sign a change order during
the course of the job? If so, pay it; if not, send the bill back to the
contractor along with a copy of the "PAID" statement and a note saying you
have already paid.


Good advice.
--
Work is the curse of the drinking class.


It's not advice. It is the legal answer to the question.

Steve


  #18   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 511
Default contractor sends a bill 7 months later


wrote in message
...
On Jan 28, 9:14 pm, "ria" wrote:
(1) What makes the contractors new bill legitimate over the previous Zero
Balance
invoice?


A legitimate charge for product or services received that was not paid
for previously.

(2) Why did it take 7 months to present this new invoice?


It's time to report to the IRS. They came up short. They discovered
that they forgot to bill you for something.

Obviously, the charge is legitimate or your post would have been
worded much differently. I would have expected something like:

"I paid the roofers back in June and now I'm getting this bill with a
bogus charge for $700 worth of masking tape and animal crackers!"

Instead, you make no mention of what the charge is for.

Admit it; it's something the roofers provided, but wasn't on the
original bill. You caught the mistake, but kept your mouth closed
figuring you'd get something for nothing.

The stand-up honest American thing to do here is PAY THE BILL.

However, I would call them and express my concern and displeasure over
the heavy-handed use of the PAST DUE stamp on the bill... how this is
the first time I've heard from them in 7 months, and how an oversight
on their part should not result in a black mark on my credit rating.

reply: How do you know all this stuff without any information? Do you have
ESP? Are you a psychic, or just psychotic?

Steve


  #19   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 6,375
Default contractor sends a bill 7 months later

In article , JIMMIE wrote:

I always write paid in full on the check when I pay for a job like
this. That overrides the agreement on the contracted price.


No, it doesn't.

Once I
had a dispute about cost sent the guy a check and he marked out the
paid in full and cashed the check. He then took me to small claims
court for what he saw as the rest of his money. He made his claim. I
showed the judge the canceled check where he altered it and the judge
found in my favor.


More likely because he altered the check... duh.
  #20   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 57
Default contractor sends a bill 7 months later

On Fri, 29 Jan 2010 04:14:10 +0200, "ria" wrote:

Last summer, a local roofing company, did a job for my
extended family. They proceeded on the job, after submitting a signed
contract and had appropriate city permits filed.

Half of the contract amount was paid before the start of the job and
the agreement was to pay the balance upon completion and passing
inspection.

End of July, 2009 the final payment was made and contractor sent an
invoice dated 7/31/2009 showing zero (0) balance and a large stamped
text PAID (stamped sideways) over the body of the invoice.

Now fast forward to January 27, 2010 as contractor sends a new
Certified US Mail with another invoice claiming "Serious Past Due
Account" and they show a balance of few hundred on this invoice which is
also dated 7/31/2009. This new invoice shows a new item being added to
the original invoice with the resulting new balance.

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous Zero Balance
invoice?
(2) Why did it take 7 months to present this new invoice?





Even if it was for a real charge that he forgot....you had a contract
for a certain price. You can't be charged more if you didn't agree to
it. If it were me, bas3ed on everything you stated (assuming it's
true)...I wouldn't pay.



****
http://www.soundclick.com/bands/defa...?bandID=789610
http://www.reviewmymusicnow.com


  #21   Report Post  
Posted to alt.home.repair
tom tom is offline
external usenet poster
 
Posts: 4
Default contractor sends a bill 7 months later


"hr(bob) " wrote in message
...
On Jan 28, 8:15 pm, dpb wrote:
ria wrote:

...

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?


You're asking the wrong folks...

--


Post your question on:


http://groups.google.com.ng/group/mi...derated/topics

Someone there is bound to have something to say pertinent to your
question.


Probably tell you to use common sense and contact the contractor telling
them you have proof of "payment in full", instead of trying to get "free"
so-called legal advice from Usenet.



  #22   Report Post  
Posted to alt.home.repair
tom tom is offline
external usenet poster
 
Posts: 4
Default contractor sends a bill 7 months later


"Steve B" wrote in message
...

"Caesar Romano" wrote in message
...
On Fri, 29 Jan 2010 07:18:45 -0500, "dadiOH"
wrote Re contractor sends a bill 7 months later:

This latest invoice was never presented to the family and has never
surfaced until now, 7 months later.

(1) What makes the contractors new bill legitimate over the previous
Zero Balance invoice?
(2) Why did it take 7 months to present this new invoice?

You had a contract for a specfied sum. You paid it and have an
statement
from the contractor acknowledging so. Did you sign a change order
during
the course of the job? If so, pay it; if not, send the bill back to the
contractor along with a copy of the "PAID" statement and a note saying
you
have already paid.


Good advice.
--
Work is the curse of the drinking class.


It's not advice. It is the legal answer to the question.


Sheesh, like only the contractor could mark "PAID" across an invoice.
Proof of payment is the only way to show proof of payment.





  #23   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 142
Default contractor sends a bill 7 months later

DerbyDad03, now that you have been properly chastised, we can both do the
"American" thing and call a truce and go on to bigger and better things.

OK with you, my friend ??

James


  #24   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 14,845
Default contractor sends a bill 7 months later

On Jan 30, 11:55*am, "James" wrote:
DerbyDad03, *now that you have been properly chastised, we can both do the
"American" thing and call a truce and go on to bigger and better things.

OK *with you, my friend ??

James


That's an interesting way to word it.

Call me wrong once again and then request a truce.

OK, let's do it your way:

Even though I was *improperly* chastised, I'll grant your request for
a truce.

Moving on...
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Logitech's Harmony sends different signals with same button Ges Electronics Repair 0 July 30th 07 07:34 AM
Bathroom: architect versus contractor? which contractor? russ-bo Home Repair 4 March 4th 07 04:55 PM
SOCKPUPPET ARMY SENDS EMAIL DEATH THREATS TO CHRIST: THE TIME OF CRUCIFIXION DRAWS NEAR!! Al Moran Home Repair 0 June 16th 06 12:51 AM
MOEPED3 sends a Happy New Year to rcm [email protected] Metalworking 0 January 6th 06 11:20 AM


All times are GMT +1. The time now is 06:09 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"