Increasing "downstream" work?
I have to rant.
It seems like most of the tradesmen I talked to do not care about minimizing downstream headaches when doing their work. Example: I have a wall that is a 3/8" plaster on top of a 3/8" gypsum board backing, a total of 3/4" thickness. I am trying to eliminate having to match thicknesses, so I demo to the corners where possible. I hired a guy to do the additional demo work, one wall is about 30' long and previously I demoed from door edge wall edge, and now I decided to remove the additional 2' from the door edge to the wall edge, so a uniform 1/2" thick standard sheet rock may be used. I hired someone to come to do those additional minor demo work. He said why not just use 1/2" thick new sheetrock plus 1/4" new sheet rock to match? or use 5/8" sheetrock and do a think coat of plaster all over to match. So, it easier and cheaper to match 28' of wall or demo the remaining 2' of it? Another example: I have custom stucco finish on my exterior wall. At one location I converted a door into a window, so I need to match the custom stucco under the new window, as well as a couple of other spots. I hired a stucco expert to come take a look, and he said he can match it and it's a small job. Then he said "why not get rid of this custom stucco, and do a plain smooth stucco, that way if you need to do other work in the future, the matching work would be less". Again, why would I re-stucco 400 linear feet of exterior wall to avoid patching a 2' wide 3' tall spot, especially considering the custom pattern is one I like better than the smooth finish? I can go on and on. It just seems like they only motivation is to create more work, whether it makes sense or not. OK I am done ranting. MC |
#2
Posted to alt.home.repair
|
|||
|
|||
Increasing "downstream" work?
I have to rant. It seems like most of the tradesmen I talked to do not care about minimizing downstream headaches when doing their work. Example: I have a wall that is a 3/8" plaster on top of a 3/8" gypsum board backing, a total of 3/4" thickness. I am trying to eliminate having to match thicknesses, so I demo to the corners where possible. I hired a guy to do the additional demo work, one wall is about 30' long and previously I demoed from door edge wall edge, and now I decided to remove the additional 2' from the door edge to the wall edge, so a uniform 1/2" thick standard sheet rock may be used. I hired someone to come to do those additional minor demo work. He said why not just use 1/2" thick new sheetrock plus 1/4" new sheet rock to match? or use 5/8" sheetrock and do a think coat of plaster all over to match. So, it easier and cheaper to match 28' of wall or demo the remaining 2' of it? Another example: I have custom stucco finish on my exterior wall. At one location I converted a door into a window, so I need to match the custom stucco under the new window, as well as a couple of other spots. I hired a stucco expert to come take a look, and he said he can match it and it's a small job. Then he said "why not get rid of this custom stucco, and do a plain smooth stucco, that way if you need to do other work in the future, the matching work would be less". Again, why would I re-stucco 400 linear feet of exterior wall to avoid patching a 2' wide 3' tall spot, especially considering the custom pattern is one I like better than the smooth finish? I can go on and on. It just seems like they only motivation is to create more work, whether it makes sense or not. OK I am done ranting. MC I feel your pain. Looking at it from the other side, I try to give clients all the options before they make up their minds what to do. But I do my best to steer clear of implying that they did something wrong and how I would have done it differently--unless they specifically ask. Even then, I don't imply they're stupid. -- Steve Bell New Life Home Improvement Arlington, TX USA |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
For women who desire the traditional 12-marker dials, the "Faceto,""Juro" and "Rilati" all add a little more functionality, without sacrificingthe diamonds. | Woodworking | |||
GFI "downstream" question | Home Repair | |||
Orange Peel Texture? "Knockdown" or "Skip Trowel" also "California Knock-down" | Home Repair |