Default Increasing "downstream" work?

I have to rant.

It seems like most of the tradesmen I talked to do not care about
minimizing downstream headaches when doing their work.

Example: I have a wall that is a 3/8" plaster on top of a 3/8" gypsum
board backing, a total of 3/4" thickness. I am trying to eliminate
having to match thicknesses, so I demo to the corners where possible.
I hired a guy to do the additional demo work, one wall is about 30'
long and previously I demoed from door edge wall edge, and now I
decided to remove the additional 2' from the door edge to the wall
edge, so a uniform 1/2" thick standard sheet rock may be used. I
hired someone to come to do those additional minor demo work. He said
why not just use 1/2" thick new sheetrock plus 1/4" new sheet rock to
match? or use 5/8" sheetrock and do a think coat of plaster all over
to match. So, it easier and cheaper to match 28' of wall or demo the
remaining 2' of it?

Another example: I have custom stucco finish on my exterior wall. At
one location I converted a door into a window, so I need to match the
custom stucco under the new window, as well as a couple of other
spots. I hired a stucco expert to come take a look, and he said he
can match it and it's a small job. Then he said "why not get rid of
this custom stucco, and do a plain smooth stucco, that way if you need
to do other work in the future, the matching work would be less".
Again, why would I re-stucco 400 linear feet of exterior wall to avoid
patching a 2' wide 3' tall spot, especially considering the custom
pattern is one I like better than the smooth finish?

I can go on and on.

It just seems like they only motivation is to create more work,
whether it makes sense or not.

OK I am done ranting.

MC
  #2   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 235
Default Increasing "downstream" work?


I have to rant.

It seems like most of the tradesmen I talked to do not care about
minimizing downstream headaches when doing their work.

Example: I have a wall that is a 3/8" plaster on top of a 3/8" gypsum
board backing, a total of 3/4" thickness. I am trying to eliminate
having to match thicknesses, so I demo to the corners where possible.
I hired a guy to do the additional demo work, one wall is about 30'
long and previously I demoed from door edge wall edge, and now I
decided to remove the additional 2' from the door edge to the wall
edge, so a uniform 1/2" thick standard sheet rock may be used. I
hired someone to come to do those additional minor demo work. He said
why not just use 1/2" thick new sheetrock plus 1/4" new sheet rock to
match? or use 5/8" sheetrock and do a think coat of plaster all over
to match. So, it easier and cheaper to match 28' of wall or demo the
remaining 2' of it?

Another example: I have custom stucco finish on my exterior wall. At
one location I converted a door into a window, so I need to match the
custom stucco under the new window, as well as a couple of other
spots. I hired a stucco expert to come take a look, and he said he
can match it and it's a small job. Then he said "why not get rid of
this custom stucco, and do a plain smooth stucco, that way if you need
to do other work in the future, the matching work would be less".
Again, why would I re-stucco 400 linear feet of exterior wall to avoid
patching a 2' wide 3' tall spot, especially considering the custom
pattern is one I like better than the smooth finish?

I can go on and on.

It just seems like they only motivation is to create more work,
whether it makes sense or not.

OK I am done ranting.

MC


I feel your pain.

Looking at it from the other side, I try to give clients all the
options before they make up their minds what to do. But I do my best to
steer clear of implying that they did something wrong and how I would
have done it differently--unless they specifically ask. Even then, I
don't imply they're stupid.

--
Steve Bell
New Life Home Improvement
Arlington, TX USA
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
For women who desire the traditional 12-marker dials, the "Faceto,""Juro" and "Rilati" all add a little more functionality, without sacrificingthe diamonds. [email protected] Woodworking 0 April 19th 08 11:12 AM
GFI "downstream" question G Mulcaster Home Repair 9 January 4th 07 03:35 AM
Orange Peel Texture? "Knockdown" or "Skip Trowel" also "California Knock-down" HotRod Home Repair 6 September 28th 06 01:48 PM


All times are GMT +1. The time now is 04:24 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"