Default Remodeling bathroom, order of things

Hi,

In my previous posts I already asked about the order in which to carry
out certain tasks, but now I'm getting contractors who want to do
stuff that I think another contractor ought to do because it comes
later. So I wanted to get your opinion on the order in slightly finer
detail. I'm going for a stand up tiled shower with tile on the wall in
the shower area and frameless glass. I'm installing a wetbed on the
floor and wonderboard on the walls. I'm heating my tiles with NuHeat.

Let's assume that the bathroom is gutted and that the wiring is done.
The remaining tasks that I need help sorting are (there other tasks
whose order I think is straightforward so I left them out):

a. Upgrading the drains and the water lines
b. Installing the rough-in valve for the shower set
c. Building the curb for the frameless glass.
d. Installing the shower pan (is it the same as the shower liner?)
e. Laying down the wet bed
f. Laying down the tile heating mats (hooking them into the electrical
system)
g. Installing the floor tile
h. Putting up wonderboard
i. Installing the wall tile. Installing the grout. (One contractor
claims that priming and painting comes before the grouting of the wall
tile. Does that make sense?)

j. Drywall in the rest of the bathroom
k. Prime and paint approapriate areas


Many thanks in advaince!

Aaron

  #2   Report Post  
Posted to alt.home.repair
Joe Joe is offline
external usenet poster
 
Posts: 2,837
Default Remodeling bathroom, order of things

On Dec 7, 8:27 pm, Aaron Fude wrote:
Hi,

In my previous posts I already asked about the order in which to carry
out certain tasks, but now I'm getting contractors who want to do
stuff that I think another contractor ought to do because it comes
later. So I wanted to get your opinion on the order in slightly finer
detail. I'm going for a stand up tiled shower with tile on the wall in
the shower area and frameless glass. I'm installing a wetbed on the
floor and wonderboard on the walls. I'm heating my tiles with NuHeat.

Let's assume that the bathroom is gutted and that the wiring is done.
The remaining tasks that I need help sorting are (there other tasks
whose order I think is straightforward so I left them out):

a. Upgrading the drains and the water lines
b. Installing the rough-in valve for the shower set
c. Building the curb for the frameless glass.
d. Installing the shower pan (is it the same as the shower liner?)
e. Laying down the wet bed
f. Laying down the tile heating mats (hooking them into the electrical
system)
g. Installing the floor tile
h. Putting up wonderboard
i. Installing the wall tile. Installing the grout. (One contractor
claims that priming and painting comes before the grouting of the wall
tile. Does that make sense?)

j. Drywall in the rest of the bathroom
k. Prime and paint approapriate areas

Many thanks in advaince!

Aaron


Wouldn't it be best to do the floor last? Might get damaged with
people tracking debris around. General rule seems to be do the work
from the top down for many projects. HTH

Joe
  #3   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 289
Default Remodeling bathroom, order of things

On Dec 7, 9:27 pm, Aaron Fude wrote:
Hi,

In my previous posts I already asked about the order in which to carry
out certain tasks, but now I'm getting contractors who want to do
stuff that I think another contractor ought to do because it comes
later. So I wanted to get your opinion on the order in slightly finer
detail. I'm going for a stand up tiled shower with tile on the wall in
the shower area and frameless glass. I'm installing a wetbed on the
floor and wonderboard on the walls. I'm heating my tiles with NuHeat.

Let's assume that the bathroom is gutted and that the wiring is done.
The remaining tasks that I need help sorting are (there other tasks
whose order I think is straightforward so I left them out):

a. Upgrading the drains and the water lines
b. Installing the rough-in valve for the shower set
c. Building the curb for the frameless glass.
d. Installing the shower pan (is it the same as the shower liner?)
e. Laying down the wet bed
f. Laying down the tile heating mats (hooking them into the electrical
system)
g. Installing the floor tile
h. Putting up wonderboard
i. Installing the wall tile. Installing the grout. (One contractor
claims that priming and painting comes before the grouting of the wall
tile. Does that make sense?)

j. Drywall in the rest of the bathroom
k. Prime and paint approapriate areas

Many thanks in advaince!

Aaron


Around here all of those tasks are usually done by one guy, or a
contractor who subs a portion to licensed trades as required.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Bathroom remodeling: before and after Sheista Home Repair 0 May 6th 07 04:09 AM
Bathroom Remodeling help John A. Weeks III Home Repair 5 May 3rd 05 06:55 PM
Bathroom Remodeling help John A. Weeks III Home Ownership 12 May 3rd 05 01:28 PM
Bathroom Remodeling help Doug Miller Home Repair 9 May 3rd 05 01:28 PM
Remodeling bathroom, which order to install things? Miki Home Repair 3 January 22nd 05 12:31 AM


All times are GMT +1. The time now is 01:54 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"