Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 178
Default Another concrete finishing question.

Trying to pour a level and flat concrete, I found puddle of water form in
the middle of the slap. I'm off about 1/16" to 1/8" when screening with a 2
x 4 lumber, hence the puddle of water. Any trick to finish the surface
perfectly flat, level without slope and without pooling of water?


  #2   Report Post  
Posted to alt.home.repair
dpb dpb is offline
external usenet poster
 
Posts: 607
Default Another concrete finishing question.

On May 8, 4:27 pm, "** Frank **" wrote:
Trying to pour a level and flat concrete, I found puddle of water form in
the middle of the slap. I'm off about 1/16" to 1/8" when screening with a 2
x 4 lumber, hence the puddle of water. Any trick to finish the surface
perfectly flat, level without slope and without pooling of water?


Have to have forms perfect to start with including solid enough to
stay in position during the pour and while screeding/finishing.

A 2x4 would be unlikely to be straight within 1/8" over it's length
unless you made it so. Normally, one would like just a little bit of
crown or slope so water will run off if it's outside slab. Flat
within 1/8" over any significant distance is going to take some
serious equipment -- like professional screed if it's more than just a
couple of feet in width.

  #3   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 1,079
Default Another concrete finishing question.


"dpb" wrote in message
oups.com...
On May 8, 4:27 pm, "** Frank **" wrote:
Trying to pour a level and flat concrete, I found puddle of water form in
the middle of the slap. I'm off about 1/16" to 1/8" when screening with a
2
x 4 lumber, hence the puddle of water. Any trick to finish the surface
perfectly flat, level without slope and without pooling of water?


Have to have forms perfect to start with including solid enough to
stay in position during the pour and while screeding/finishing.

A 2x4 would be unlikely to be straight within 1/8" over it's length
unless you made it so. Normally, one would like just a little bit of
crown or slope so water will run off if it's outside slab. Flat
within 1/8" over any significant distance is going to take some
serious equipment -- like professional screed if it's more than just a
couple of feet in width.


One thing to consider is that water will puddle through surface tension as
well - it doesn't necessarily mean you have a significant depression.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Finishing concrete, running out of butter. ** Frank ** Home Repair 2 May 9th 07 02:39 PM
Furniture tacks and leather. How to avoid wood finishing and create collectable stuff. AND CONCRETE!! [email protected] Woodworking 2 January 30th 07 06:49 PM
Preparing concrete basement floor for finishing... BillyBA Home Repair 1 July 31st 06 05:49 PM
Preparing concrete basement floor for finishing... BillyBA Home Ownership 1 July 31st 06 05:49 PM
Finishing question bowhunter Woodworking 5 March 20th 05 06:26 PM


All times are GMT +1. The time now is 10:36 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"